Amendment 0002 Attachement - Questions and Answers.pdf
PDF 91 KB Posted
- Attached to
- FCI Englewood - Upgrade Health Services Elevator Federal contract opportunity
- Solicitation number
- 15BBNF26Q00000048
About this file
This document is a Questions and Answers (Q&A) clarification issued for Request for Quotation 15BBNF26Q00000048 regarding the upgrade of the Health Services Elevator at FCI Englewood. The solicitation was extended with offers due on 5/8/2026. This is a turnkey project requiring the elevator contractor to complete all work including fire safety and electrical components necessary for a complete elevator modernization.
Key technical and contractual requirements clarified include: a new geared machine is mandatory (gearless machines are not acceptable); emergency video communications are not required due to existing security cameras, though contractors must provide video capability for entrapment assessment per Section B subsections 2.1(b) and 2.6(f); any components not specifically identified as "retain, reuse, or refurbish" shall be replaced with new equipment, including wind-up safeties and emergency brakes covered under Section B subsection 2.2(O); hall control station specifications are addressed in Section B subsection 2.8; and all contractor bids must include a 12-month manufacturer's warranty for completed work. The original elevator is assumed to date from the 1938 building construction. On-site material storage accommodations include a 48" to 60" job box available on the mid-level floor near the elevator and/or in the rooftop mechanical room (which has limited access), with tool control and storage to be discussed during the pre-construction meeting.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0004.pdf | ||
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| Amendment 0001 - Attachment 4 Photos.pdf | ||
| Amendment 0001 - Attachment 2 Photos.pdf | ||
| Amendment 0001 - Attachment 1 Photos.pdf | ||
| Amendment 0001 - Attachment 3 Photos.pdf | ||
| 1 - Criminal History Check Form.pdf | ||
| 15BBNF26Q00000048.pdf | ||
| 1 - Instructions to Offerors.pdf | ||
| Bid Bond.pdf | ||
| Wage Determination.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Quotation 15BBNF26Q00000048 Upgrade Health Services Elevator – FCI Englewood Questions and Answers
Question 1:
The specification calls for a new geared machine. Would a new gearless machine be acceptable if more cost effective?
BOP Response: Clarification or Change Clarification: Gearless machine will not be accepted.
Question 2:
Since this is under federal jurisdiction will 2022 code be required including the 24/7 Emergency Video Communication in the car operating panel?
Clarification: Institutional elevators will not include Emergency video communications as there will be security cameras in the elevator. Per section B subsection 2.1 part b and section B subsection 2.6 part f, contractor required to provide video capability for entrapment assessment.
Question 3:
The elevator currently has wind-up safeties, and it is recommended to replace these. The specification does not include new safeties.
Should new safeties be included in the specification or an add alternate? Or should we retain the existing safeties as currently stated on the specification?
Clarification: Section B subsection 2.2 part O covers emergency brakes. Any items not specifically identified as to “Retain, reuse, or refurbish” shall be replaced with new.
Question 4:
Should pricing include 12 months of warranty maintenance?
Clarification: Contractor bids shall include a 12 month manufacturer’s warranty for completed work.
Question 5:
Please clarify where on site storage will be located for materials?
Location from the hoistway will affect the installation duration.
Clarification: Storage space for a 48” to 60” job box will be available on the mid-level floor near the elevator and/or in the rooftop mechanical room. Please note, rooftop mechanical room has limited access. Tool control and storage will be discussed in further detail during pre-construction meeting.
Request for Quotation 15BBNF26Q00000048 Upgrade Health Services Elevator – FCI Englewood Questions and Answers
Question 6:
Existing hall stations are surface mount. Will surface mount be acceptable for the new hall stations?
Clarification: Section B subsection 2.8 covers Hall Controls.
Question 7:
Is this a turnkey project? In other words, is the elevator contractor carrying the required ‘work by others’? (Fire safety and electrical). If that’s the case, it will be impossible to provide an accurate bid by 4/24/2026. Can the bid date be extended by to 5/15/2026?
BOP Response: Clarification or Change Clarification: This is to be a turnkey project to include all work to complete the SOW and a complete elevator modernization. The solicitation has been extended, offers are due on 5/8/2026.
Question 8:
What year was this elevator installed?
BOP Response: Clarification or Change Clarification: Original building construction was 1938, and elevator is assumed to be original.
Question 9:
Will the elevator machine, governor, rope gripper, fixtures, and roller guides be retained? These are items that are normally replaced on the full modernization, along with traveling cable & hoistway wiring. It’s extremely unusual to retain all of these items.
Clarification: Any items not specifically identified as to “Retain, reuse, or refurbish” shall be replaced with new.