This is an Amendment of Solicitation incorporating corrected questions and answers for a grease interceptor pumping and cleaning requirement. The Federal Bureau of Prisons, Federal Correctional Complex (FCC) Florence, Colorado is procuring four quarterly grease interceptor pumping, cleaning, and waste disposal services covering five interceptors: three rated at 12,000 gallons each and two rated at 6,000 gallons each, all located outside buildings at the facility. The requirement consists of a single firm-fixed price per quarterly service covering all five interceptors, with four quarterly services scheduled over a one-year period (first service before December 31, 2026; second through March 31, 2027; third through June 30, 2027; fourth through September 30, 2027). There are no option years. All accumulated grease, solids, and other waste must be removed to meet specified cleaning standards; complete water removal is not required. The 48,000-gallon combined rated capacity is not a guaranteed pump-out quantity. All five interceptors must be serviced each quarter. Quotations may be submitted by email to b7baker@bop.gov and must be received by the deadline specified in the amended solicitation. Award will be made using the Lowest Price Technically Acceptable (LPTA) evaluation method.

The amendment corrects several items from the original solicitation: the NAICS 562991 size standard is $9.0 million in average annual receipts (not $900,000); the three large interceptors are 12,000 gallons each (not "12,0000"); and the two smaller interceptors at the Camp are 6,000 gallons each. The contractor must comply with all currently applicable Federal, State, and local licensing, transportation, disposal, and insurance requirements; Colorado's statewide waste-grease registration requirement was repealed. Disposal must occur at facilities authorized to receive the specific food-service grease interceptor waste, with waste manifests required per load. A full-size pump truck can approach within approximately 60 feet of all manhole covers; water is available on-site, and the contractor must provide hoses. Site visits are not approved; contractor personnel must complete background security screening (minimum two weeks processing; renewal every six months) and present valid photo identification. Trucks will be escorted through the rear gate by BOP staff. Service duration may extend beyond four working days when necessary to complete required grease removal; additional days must be coordinated with the Government. Prime contractors may subcontract work to small businesses but remain fully responsible for performance, including all licensing, insurance, and subcontracting limitations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEDERAL BUREAU OF PRISONS | FCC FLORENCE

AMENDMENT OF SOLICITATION

Prepared amendment form | SF 30-style layout

2. AMENDMENT NUMBER

3. EFFECTIVE DATE

6. ISSUED BY

Federal Bureau of Prisons FCC Florence P.O. Box 7500 Florence, CO 81226

7. ADMINISTERED BY

Same as issuing office

8. QUOTER NAME AND ADDRESS

9A. SOLICITATION NUMBER

15B40627Q00000001

9B. ORIGINAL SOLICITATION DATE

11. Amendment of solicitation The solicitation identified above is amended as set forth in Item 14 and its continuation. The quotation submission deadline is not extended by this amendment. The deadline stated in the solicitation, as previously amended, remains in effect.

Quoters must acknowledge receipt before the quotation deadline by completing the acknowledgment and signature block below and returning one copy, by identifying this amendment in the quotation, or by separate electronic communication referencing the solicitation and amendment numbers. Failure to acknowledge the amendment as required may result in rejection of the quotation. Submit quotations and acknowledgments to b7baker@bop.gov.

14. Description of amendment This amendment incorporates Attachment 1, Corrected Questions and Answers (30 questions), and revises the solicitation as stated in the Item 14 continuation. These corrected responses supersede prior responses to the same questions. Except as expressly amended, all other terms and conditions remain unchanged.

Item 14: Continuation Quarterly Grease Interceptor Pumping, Cleaning, and Waste Disposal Solicitation 15B40627Q00000001 Corrections and clarifications Award method: The Government will evaluate quotations using the lowest price technically acceptable (LPTA) method.

Submission method: Quotations may be submitted by email to b7baker@bop.gov and must be received by the deadline specified in the solicitation, as previously amended.

Pricing, term, and options: Provide one firm-fixed price per quarterly service covering all five interceptors. The requirement consists of four quarterly services during a one-year period. There are no option years.

NAICS size standard: The size standard for NAICS 562991, Septic Tank and Related Services, is corrected from $900,000 to $9.0 million in average annual receipts.

Interceptor capacities: The three large interceptors are each 12,000 gallons; “12,0000” is corrected to “12,000.” The two smaller interceptors at the Camp are each 6,000 gallons.

Cleaning requirements: All five interceptors must be serviced each quarter. All accumulated grease, solids, and other waste necessary to meet the specified cleaning standard must be removed. Complete removal of all water is not required solely to empty the interceptors. The combined 48,000-gallon rated capacity is not a guaranteed pump-out quantity.

Current licensing requirements: The obsolete statewide CDPHE waste-grease registration requirement is replaced by compliance with all currently applicable Federal, State, and local licensing, transportation, disposal, and insurance requirements for the activities performed.

Service duration: Additional working days beyond the four-working-day limit are permitted when necessary to complete the required grease removal and cleaning. The contractor must coordinate the service schedule with the Government.

Site visits and escorts: Site visits will not be approved at this time. Trucks will be escorted through the rear gate by BOP staff. Applicable personnel screening and identification requirements are stated in Attachment 1.

Attachments incorporated by reference Attachment 1: Corrected Questions and Answers (30 questions; included in this document).

Attachment 2: Photographs of the existing interceptors and access points (separate file).

Attachment 3: Applicable wage determination documentation (separate file).

Except as expressly revised by this amendment and its attachments, all other solicitation terms and conditions remain unchanged.

Attachment 1: Corrected Questions & Answers Solicitation 15B40627Q00000001 | FCC Florence, Colorado

01. Prime contractor and subcontractor responsibilities Question: Can a vendor submit a quotation as the prime contractor and subcontract the pumping, cleaning, and disposal work to a Colorado small business while managing scheduling, reporting, and contract administration?

Answer: Yes. A prime contractor may propose a subcontracting arrangement that complies with the solicitation and applicable small-business requirements. The prime contractor remains responsible to the Government for all contract performance, including work performed by subcontractors. The Government’s contractual relationship is with the prime contractor, not the subcontractor. Any applicable limitations on subcontracting must be satisfied; using a small-business subcontractor does not, by itself, establish compliance.

02. Subcontractor credentials, insurance, and past performance Question: May the subcontractor performing the work hold the required transportation credentials, supply the trucks and insurance, and submit its past performance for consideration?

Answer: The subcontractor performing the regulated pumping, hauling, and disposal activities must possess the licenses, permits, and other authorizations currently required for those activities. The subcontractor may supply the trucks and insurance required for its work. This does not relieve the prime contractor of any separate licensing, insurance, or other obligations imposed by applicable law or the contract. Relevant past performance of a proposed subcontractor performing major or critical aspects of the requirement may be considered only in accordance with the evaluation approach stated in the solicitation, as amended.

03. Quarterly cleaning requirements and estimated volumes Question: Must all five interceptors, comprising three 12,000-gallon units and two 6,000-gallon units, be completely evacuated during each quarterly service? What volume has historically been removed?

Answer: All five interceptors must be serviced each quarter. All accumulated grease, solids, and other waste required to meet the specified cleaning standard must be removed. Complete removal of all water is not required solely to empty the interceptors. The combined 48,000-gallon rated capacity is not a guaranteed pump-out quantity. Actual removal quantities depend on conditions and the compliant cleaning method used.

04. Colorado waste-grease registration requirement Question: The Statement of Work requires Colorado waste-grease transporter registration and current CDPHE registration for trucks. Because the statewide waste-grease program was repealed, will currently applicable local licenses, insurance, and authorized disposal arrangements satisfy the requirement?

Answer: Colorado repealed its statewide Waste Grease Program through House Bill 20-1374. The contractor and any subcontractor must comply with all currently applicable Federal, State, and local requirements for the activities each performs, including any required transportation or disposal authorizations and insurance. A local license alone does not establish compliance with every applicable requirement.

05. Authorized disposal facility and waste manifests Question: Is disposal at a Colorado Springs Utilities-authorized liquid-waste disposal facility acceptable if the facility is authorized to receive the waste and manifests are provided for each load?

Answer: A disposal facility is acceptable only if it is authorized to receive the specific waste removed under this contract and the disposal complies with all applicable requirements. A waste manifest is required for each load removed from the institution. Authorization to accept liquid waste generally is not sufficient if it does not cover the actual food-service grease interceptor waste being delivered.

06. Firm-fixed quarterly pricing Question: Should the quotation provide one firm-fixed price per quarterly service covering all five interceptors, or should payment be based on the measured gallons removed?

Answer: Provide one firm-fixed price per quarterly service covering all five interceptors. The quoted price must include all labor, equipment, pumping, cleaning, hauling, disposal, fees, materials, consumables, and other costs necessary to complete the specified service. Payment is not based on gallons removed. The contractor must achieve the required cleaning standard regardless of the volume removed within the defined contract scope.

07. Interceptor locations Question: Are the grease interceptors located inside or outside the buildings?

Answer: All five grease interceptors are located outside the buildings.

08. Photographs and access distances Question: Can the Government provide photographs of the existing interceptors and access points?

Answer: Photographs of the existing interceptors and access points will be provided in the attached documents. A full-size pump truck can approach within approximately 60 feet of each manhole cover. All but one manhole cover can be approached within approximately 5 feet.

09. Award methodology and past performance evaluation Question: The notice states lowest price technically acceptable (LPTA), while the cover letter describes best value based on price, technical acceptability, and past performance. Which approach governs, and how will past performance be evaluated?

Answer: The Government will evaluate quotations using the lowest price technically acceptable (LPTA) method.

10. Authorized quotation submission method Question: The cover letter states that emailed quotations will not be accepted but also directs submission to b7baker@bop.gov. What is the authorized submission method?

Answer: Quotations may be submitted by email to b7baker@bop.gov and must be received by the deadline specified in the solicitation, as amended.

11. Quarterly service schedule Question: What are the service-period start and end dates, and when must each of the four quarterly cleanings be completed?

Answer: The intended quarterly schedule is: first service, before December 31, 2026; second service, January 1 through March 31, 2027; third service, April 1 through June 30, 2027; and fourth service, July 1 through September 30, 2027. Coordinate individual service dates with the Government after award.

12. Liquid removal, separation, and non-entry cleaning Question: Does each quarterly service require complete liquid evacuation? Is separation or return of liquids allowed, and is non-entry cleaning acceptable if it meets the required interior-cleanliness standard? Are recent pump-out volumes available?

Answer: All accumulated grease, solids, and other waste required to meet the specified cleaning standard must be removed during each quarterly service. Complete removal of all water is not required solely to empty the interceptors.

13. Site information, water, hoses, and security processing Question: Are site plans or a pre-quotation visit available to verify truck access, hose distances, and water availability? What escort restrictions and security-processing times apply?

Answer: Site visits will not be approved at this time. A full-size pump truck can approach within approximately 60 feet of all manhole covers; all but one can be approached within approximately 5 feet. Water is available at each service location. The contractor must provide its own hoses. Contractor personnel must complete the required background screening before entry. Allow a minimum of two weeks after submission of complete paperwork for processing; screening must be renewed every six months.

14. Service Contract Labor Standards and wage determination Question: Please provide the applicable Service Contract Labor Standards wage determination and contract clauses, or confirm why they do not apply.

Answer: The wage determination documentation is attached.

15. NAICS code and small-business size standard Question: The SF 1449 lists NAICS 562991 and a size standard of $900,000. What is the intended size standard, and will the form be corrected?

Answer: The intended NAICS code is 562991, Septic Tank and Related Services, with a small-business size standard of $9.0 million in average annual receipts. A size standard of $900,000 is a typographical error.

16. Predecessor contract and historical pricing Question: Can the Government identify the most recent predecessor contract and its quarterly price or number of cleanings for comparison?

Answer: The two most recent cleanings identified in the Government’s source responses occurred in May 2026 and August 2026.

17. Request for a pre-quotation site visit Question: Can a pre-quotation site visit be arranged, and what process should interested vendors follow to request one?

Answer: Site visits will not be approved at this time. Vendors must prepare their quotations using the solicitation, its attachments, and any written amendments or clarifications issued by the Government.

18. Service duration and the four-working-day limit Question: Will the Government accept a quotation proposing more than four working days per quarterly service?

Answer: The Government intends to permit additional working days when necessary to complete the required grease removal and cleaning. Any revised service-duration requirement must be stated in the solicitation, as amended, and the contractor must coordinate the service schedule with the Government.

19. Capacity correction for the large interceptors Question: Item 0001 lists the three large interceptors as “12,0000” gallons, while the Statement of Work lists 12,000 gallons. Which capacity is correct?

Answer: Each of the three large interceptors has a rated capacity of 12,000 gallons. The “12,0000” entry in Item 0001 is a typographical error.

20. Capacity of the two smaller interceptors Question: The current solicitation identifies two 6,000-gallon interceptors, while a 2018 notice identified two 600-gallon interceptors. What is the correct capacity?

Answer: The two smaller interceptors are located at the Camp, and each has a rated capacity of 6,000 gallons.

21. Waste source and composition Question: Do the interceptors contain only food-service grease waste, or do they receive sewage, septage, or other waste streams?

Answer: The interceptors receive wastewater from food-service floor drains and sinks. According to the facility’s source response, they do not receive sanitary sewage. The removed material includes food-service grease, solids, and associated wastewater; this statement is not a laboratory characterization or a disposal-facility acceptance determination.

22. Historical disposal manifests and service records Question: Can the Government provide historical disposal manifests or service records identifying the composition and quantities of waste previously removed?

Answer: The volume removed can vary with the amount of water removed and the cleaning method used. No historical manifests, measured disposal quantities, or service records were included in the supplied question-and-answer materials.

23. Quarterly price, contract term, and option years Question: Should the price cover all five interceptors each quarter for four quarters in fiscal year 2027? Are any option years included?

Answer: Provide one firm-fixed price per quarterly service covering all five interceptors: three 12,000-gallon units and two 6,000-gallon units. The stated requirement is for four quarterly services during a one-year period. There are no option years.

24. Rated capacity versus quarterly pump-out quantity Question: Are the interceptors fully evacuated each visit, for approximately 48,000 gallons total, or is there a typical volume removed?

Answer: The combined rated capacity is 48,000 gallons. Rated capacity is not the amount guaranteed to be removed each visit. Actual quantities vary with accumulation, time between services, and the compliant cleaning method used. All required grease, solids, and other waste must be removed; complete removal of all water is not required solely to empty the interceptors.

25. Confined-space entry and safety requirements Question: Is confined-space entry required at every visit or only when needed to complete the work?

Answer: No blanket requirement for personnel to enter an interceptor during every service is established by the supplied response. Whether non-entry cleaning meets the Statement of Work must be confirmed. The contractor must assess confined-space hazards and comply with applicable OSHA requirements, including 29 CFR 1910.146 when applicable. Entry is not limited to climbing completely into a tank; under that standard, entry occurs when any part of the entrant’s body breaks the plane of an opening into a permit-required confined space.

26. Previous contract number and most recent cleanings Question: What was the previous contract number, and when were the interceptors last cleaned?

Answer: The most recent cleanings identified in the supplied responses occurred in May 2026 and August 2026.

27. Vehicle dimensions and facility access Question: What truck-size or access limits apply at the four food-service locations, and what lead time is needed for crew clearance or escorts?

Answer: The rear access gate is described in the supplied response as 12 feet wide and 12 feet high. The stated maximum vehicle length is 70 feet. Contractor personnel must complete the required security screening before entry; allow at least two weeks after submission of complete paperwork for processing. Trucks will be escorted through the rear gate by Bureau of Prisons (BOP) staff.

28. Site-visit coordination and facility point of contact Question: Who will coordinate a site visit, and can the Facilities Manager’s contact information be provided if different?

Answer: Site visits will not be approved at this time. Direct solicitation questions to the contracting point of contact at b7baker@bop.gov. Postaward facility coordination contact information will be provided to the awardee after contract award.

29. Visitor identification, background checks, and submission lead time Question: What visitor access procedures, identification, background checks, or escort requirements apply, and how far in advance must names be submitted?

Answer: Site visits will not be approved at this time. For contract performance after award, contractor personnel entering the complex must complete the required background check and present valid photo identification. Security processing takes a minimum of two weeks after complete and correct paperwork is submitted. Contractor personnel must renew background screening every six months, as stated in the facility’s source response.

30. Prime versus subcontractor transportation credentials Question: Must the prime contractor independently hold waste-grease transportation registration, or may the specialized pumping, hauling, and disposal be performed by a properly authorized and insured first-tier small-business subcontractor?

Answer: The entity performing each regulated activity must hold the licenses, permits, and authorizations currently required for that activity. A prime contractor that does not itself perform transportation is not automatically required to hold a transporter credential solely because it is the prime; however, applicable law and any valid contract-specific requirements must be checked. The prime remains responsible for complete contract performance, required insurance, and any applicable limitations on subcontracting. Qualification as a similarly situated entity depends on the applicable small-business program status and size requirements, not merely the subcontractor’s location or its description as a small business.