Questions_and_Answer_Duluth_-_Response.pdf
PDF 242 KB Posted
- Attached to
- FPC Duluth - BAS System Federal contract opportunity
- Solicitation number
- 15B40218B00000003
About this file
RFI and Response
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Flap_C_Tab_1_-_Abstract_BAS_System.pdf | ||
| Amendment_00002_-_15B40218B00000003.pdf | ||
| Questions_and_Answer_Duluth_-_Follow_Up_-_11-1-2018.pdf | ||
| Questions_and_Answer_Duluth_-_BAS_System_10-26-18.pdf | ||
| Amendment_00001_-_15B40218B00000003.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FPC DULUTH – BAS SYSTEM
PROJECT 4C2X QUESTIONS & ANSWERS
SOLICITATION 15B40218B00000003
BBA Construction:
1. Part 2.1.D of the Specification states “…together with associated Point Sheets and Drawings…”. The Point Sheet is necessary for each building to provide a description of all points in each building getting connected to the existing devices via existing wiring as stated in Paragraph A of Part 2.
1. Is a Point Sheet available for each affected building?
Clarification: There is a Point Sheet available for each building.
2. Confirm the BAS will be connected to existing devices using existing wiring.
Clarification: The existing devices and existing wiring will be used to connect the BAS. Some wiring may be needed on a case by case basis.