Amendment 00001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Flap_C_Tab_1_-_Abstract_BAS_System.pdf | ||
| Amendment_00002_-_15B40218B00000003.pdf | ||
| Questions_and_Answer_Duluth_-_Follow_Up_-_11-1-2018.pdf | ||
| Questions_and_Answer_Duluth_-_BAS_System_10-26-18.pdf | ||
| Questions_and_Answer_Duluth_-_Response.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
SOLICITATION: 15B40218B00000003
AMENDMENT: 00001
BAS System
FPC DULUTH – PROJECT 4C2X
Solicitation 15B40218B00000003 is amended as follows:
SOLICITATION (SF-1442):
1. Block 13: Change the offer due date from November 8, 2018 to November 15, 2018, no later than 2:00p.m. CST.
2. Remove previous wage rate and incorporate MN180194 – MN194 dated 9/28/2018
The following clauses are removed from the solicitation:
Clause Title 52.202-1 Definitions (Nov 2013) 52.203-3 Gratuities (Apr 1984) 52.203-5 Covenant Against Contingent Fees (May 2014) 52.203-6 Restrictions On Subcontractor Sales To The Government (Sept 2006) 52.203-7 Anti-Kickback Procedures (May 2014) 52.203-8 Cancellation, Rescission, and Recovery of Funds fro Illegal or Improper Activities (May 2014) 52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity (May 2014) 52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights (Apr 2014) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011) 52.219-4 Notice of Price Evaluation Preference for Hub-zone Small Business Concerns (Oct 2014) 52.219-8 Utilization of Small Business Concerns (Nov 2016) 52.222-4 Contract Work Hours and Safety Standards Act – Overtime Compensation (May 2018) 52.222-40 Notification of Employees Rights Under the National Labor Relations Act (Dec 2010) 52.236-15 Schedules for Construction Contracts (Apr 1984) 52.242-13 Bankruptcy (July 1995) 52.249-2 Alt I Termination for Convenience of the Government (Fixed-Price)(Apr 2012) – Alt I (Sept 1996) FAO-0013 Contract Closeout Procedures (for construction contracts exceeding the SAT)
The following provisions are removed from the solicitation:
Provision Title 52.233-2 Service of Protest (Sept 2006) 2852.233-70 Protests Filed Directly With the Department of Justice (Jan 1998) 52.209-13 Violation of Arms Control Treaties or Agreements-Certificaton (June 2018)
The following clauses are incorporated into the solicitation by Reference:
Clause Title 52.243-5 Changes and Changed Conditions (Apr 1984) 52.249-1 Termination for Convenience of the Government(Fixed-Price)(Short Form)(Apr 1984)
SOLICITATION: 15B40218B00000003
AMENDMENT: 00001
BAS System
FPC DULUTH – PROJECT 4C2X
The following clause is incorporated into the solicitation by Full Text:
FAO-0014 Contract Closeout Procedures (for construction contracts not exceeding the SAT)
Contract Closeout must be completed upon receipt of property and final payment.
Prior to payment of final invoice:
The Contractor shall submit the following documentation:
(1) Guarantees and warranties;
(2) All operation/maintenance manuals;
(3) Consent of Surety to Final Payment (AIA Document G707), if the contractor furnished a bond;
(4) Release of Claims (GSA Form 1142);
(5) Evidence of no pending labor disputes;
(6) As-built drawings/shop drawings, (if applicable);
(7) Contractor’s final invoice.
AIA forms can be obtained from The American Institute of Architects at www.aiabookstore.com.
GSA forms can be obtained from the General Services Administration at www.gsa.gov (click on the “Forms Library” link).
NO OTHER CHANGES ARE MADE AT THIS TIME.
http://www.aiabookstore.com/
General Decision Number: MN180194 09/28/2018 MN194
State: Minnesota
Construction Type: Building
County: St Louis County in Minnesota.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 09/28/2018
ASBE0034-001 06/01/2018
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 37.06 31.94
BOIL0647-008 03/01/2018
Rates Fringes
BOILERMAKER......................$ 37.22 27.14
BRMN0001-010 05/01/2018
Rates Fringes
BRICKLAYER.......................$ 34.99 24.64
BRMN0001-019 05/01/2018
Rates Fringes
TILE FINISHER....................$ 25.13 5.54
TILE SETTER......................$ 25.89 24.34
10/26/2018https://www.wdol.gov/wdol/scafiles/davisbacon/MN194.dvb?v=0
CARP0361-008 06/01/2018
Rates Fringes
CARPENTER (Includes Drywall Hanging, and Form Work, and Excludes Soft Floor Layer).......$ 33.60 19.03
SOFT FLOOR LAYER.................$ 33.25 16.94
ELEC0242-002 05/16/2018
Rates Fringes
ELECTRICIAN......................$ 36.85 26.17
ENGI0049-019 05/01/2018
Rates Fringes
POWER EQUIPMENT OPERATOR
Bulldozer...................$ 38.13 20.30 Crane.......................$ 39.39 20.30 Drill.......................$ 38.13 20.30 Forklift....................$ 38.13 20.30 Loader......................$ 38.13 20.30 Oiler.......................$ 35.50 20.30 Roller......................$ 38.13 20.30
IRON0512-025 05/01/2018
Rates Fringes
IRONWORKER (Structural and Reinforcing).....................$ 32.64 27.85
LABO1091-025 05/01/2018
Rates Fringes
LABORER
Asbestos Abatement (Removal from Ceilings, Floors, and Walls)..........$ 30.83 18.70 Common or General...........$ 28.04 16.17 Mason Tender - Brick/Cement/Concrete.......$ 27.99 15.32 Pipelayer...................$ 35.68 16.92
PAIN0106-007 05/01/2017
Rates Fringes
GLAZIER..........................$ 30.58 18.02
PAIN0106-009 05/01/2017
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 30.33 17.27
PAIN0386-010 05/01/2014
Rates Fringes
PAINTER (Spray)..................$ 25.08 13.99
PLAS0633-008 05/01/2018
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 32.66 18.68
PLAS0633-011 05/01/2018
Rates Fringes
PLASTERER........................$ 25.47 14.88
PLUM0011-007 07/03/2018
Rates Fringes
PIPEFITTER (Includes HVAC Pipe Installation and Excludes HVAC Unit Installation)....................$ 34.59 17.34 PLUMBER (Excludes HVAC Pipe and Unit Installation)...........$ 34.59 17.34
ROOF0096-019 07/01/2018
Rates Fringes
ROOFER...........................$ 33.50 17.22
SHEE0010-034 05/01/2017
Rates Fringes
SHEET METAL WORKER (Includes HVAC Duct and Unit Installation)....................$ 32.30 26.93
UAVG-MN-0024 06/22/2018
Rates Fringes
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 35.60 19.64
UAVG-MN-0025 06/22/2018
Rates Fringes
PAINTER (Brush and Roller).......$ 29.50 17.64
SUMN2015-064 06/22/2018
Rates Fringes
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 32.03 14.80
TRUCK DRIVER: Dump Truck........$ 23.43 12.33
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: 00001 |
| Code[0]: BFAO |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: JEFF KERCHEVAL |
| Description[0]: AMENDMENT IS AS FOLLOWS: |
A. SEE PAGE 2 FOR ALL CHANGES MADE TO THIS SOLICITATION.
NO OTHER CHANGES ARE MADE.
| FacilityCode[0]: |
| Code[2]: |
| IssuedBy[0]: Federal Bureau of Prisons |
Field Acquisition Office US Armed Forces Reserve Complex 346 Marine Forces Drive Grand Prairie, TX 75051
| NameandAddress[0]: |
| AdministeredBy[0]: |
| ContractIDCode[0]: |
| ReqNumber[0]: |
| AmendmentNo[1]: 15B40218B00000003 |
| ModificationNo[0]: |
| ProjectNo[0]: 4C2X |
| Page[0]: 1 |
| Pages[0]: 9 |
| EffectiveDate[0]: 10/26/2018 |
| Dated9B[0]: 10/04/2018 |
| Dated10B[0]: |
| CheckBox9[0]: 1 |
| CheckBox10[0]: Off |
| CheckBox11[0]: 1 |
| CheckBox13A[0]: Off |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| CheckBox13D[0]: Off |
| IsNot[0]: Off |
| Is[0]: Off |
| Extended[0]: 1 |
| NotExtended[0]: Off |
| DateSigned[0]: |
| DateSigned[1]: |
| Copies[0]: 1 |
| CopiesReturned[0]: |
| Text1: 4 of 9 |
| Text2: 5 of 9 |
| Text3: 6 of 9 |
| Text4: 7 of 9 |
| Text5: 8 of 9 |
| Text6: 9 of 9 |
| Text7: Page 2 of 9 |
| Text8: Page 3 of 9 |
File details come from the government source that posted it.