Questions_and_Answer_Duluth_-_BAS_System_10-26-18.pdf
PDF 272 KB Posted
- Attached to
- FPC Duluth - BAS System Federal contract opportunity
- Solicitation number
- 15B40218B00000003
About this file
Questions and Answers 10/30/18
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Flap_C_Tab_1_-_Abstract_BAS_System.pdf | ||
| Amendment_00002_-_15B40218B00000003.pdf | ||
| Questions_and_Answer_Duluth_-_Follow_Up_-_11-1-2018.pdf | ||
| Amendment_00001_-_15B40218B00000003.pdf | ||
| Questions_and_Answer_Duluth_-_Response.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FPC DULUTH – BAS SYSTEM
PROJECT 4C2X QUESTIONS & ANSWERS
SOLICITATION 15B40218B00000003
BBA Construction:
1. Can the Points List for each building be published in an amendment so the scope of work can be established? On site there is mapping of the existing metasis points.
CLARIFICATION: The Points List has not been provided due to the fact that it is unreliable as it is unknown if it contains the appropriate information.
This sheet may not contain all information and could be only used as a reference.
2. Can the Points List describe if the point is monitoring or controlling a function?
CLARIFICATION: With the existing system no longer functioning, this cannot be determined with any accuracy.
Egan Co.:
1. What controllers and their controller type are in each building?
Specifically what quantity of type of controller per building?
CLARIFICATION:
FPC Duluth Control Device Spread Sheet
Building DX9100 UNT AHU XT
217 1 1 2
209 1 12
208 1 12 1
207 1 8
210 1 8
211 1 8 1
318 4 4 4
227 1 2 3 1
222 1 1
228 2 3
216 6 13 10
223 1 1
220 1 9 4
221 1 1
2. What is the existing Front-end or HMI/GUI access is available for the existing controller access? (Excluding the recent N4 upgrade) If there is one, are copies of the databases or system files available for access to discern field controller programming/setup?
CLARIFICATION: Metasys system that was in place is defunct, database and system files are no longer available.
3. Is the controller network (N2 between Metasys controllers) limited to each individual building or are they presently connected together? I.e. are all the dorm controllers networked together through the N2 network?
CLARIFICATION: Yes they are currently connected together on defunct current metasys network
4. I heard mention of adding a couple temperature sensors for Walk-in cooler/freezer temperatures at the meeting, but I find nothing in the project specification document about the addition of any devices or control points. Are there additional documents indicating those to be added?
CLARIFICATION: Systems have to have the capability to read freezer/coolers if it is not in the solicitation BOP with take care of additions post project.