Questions_and_Answer_Duluth_-_BAS_System_10-26-18.pdf

PDF 272 KB Posted

Attached to
FPC Duluth - BAS System Federal contract opportunity
Solicitation number
15B40218B00000003
Issued by
Department of Justice Bureau of Prisons Field Acquisition Office

About this file

Questions and Answers 10/30/18

View the file

Other files for this federal contract opportunity

Other files attached to FPC Duluth - BAS System, newest first.
File Type Posted
Flap_C_Tab_1_-_Abstract_BAS_System.pdf PDF
Amendment_00002_-_15B40218B00000003.pdf PDF
Questions_and_Answer_Duluth_-_Follow_Up_-_11-1-2018.pdf PDF
Amendment_00001_-_15B40218B00000003.pdf PDF
Questions_and_Answer_Duluth_-_Response.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FPC DULUTH – BAS SYSTEM

PROJECT 4C2X QUESTIONS & ANSWERS

SOLICITATION 15B40218B00000003

BBA Construction:

1. Can the Points List for each building be published in an amendment so the scope of work can be established? On site there is mapping of the existing metasis points.

CLARIFICATION: The Points List has not been provided due to the fact that it is unreliable as it is unknown if it contains the appropriate information.

This sheet may not contain all information and could be only used as a reference.

2. Can the Points List describe if the point is monitoring or controlling a function?

CLARIFICATION: With the existing system no longer functioning, this cannot be determined with any accuracy.

Egan Co.:

1. What controllers and their controller type are in each building?

Specifically what quantity of type of controller per building?

CLARIFICATION:

FPC Duluth Control Device Spread Sheet

Building DX9100 UNT AHU XT

217 1 1 2

209 1 12

208 1 12 1

207 1 8

210 1 8

211 1 8 1

318 4 4 4

227 1 2 3 1

222 1 1

228 2 3

216 6 13 10

223 1 1

220 1 9 4

221 1 1

2. What is the existing Front-end or HMI/GUI access is available for the existing controller access? (Excluding the recent N4 upgrade) If there is one, are copies of the databases or system files available for access to discern field controller programming/setup?

CLARIFICATION: Metasys system that was in place is defunct, database and system files are no longer available.

3. Is the controller network (N2 between Metasys controllers) limited to each individual building or are they presently connected together? I.e. are all the dorm controllers networked together through the N2 network?

CLARIFICATION: Yes they are currently connected together on defunct current metasys network

4. I heard mention of adding a couple temperature sensors for Walk-in cooler/freezer temperatures at the meeting, but I find nothing in the project specification document about the addition of any devices or control points. Are there additional documents indicating those to be added?

CLARIFICATION: Systems have to have the capability to read freezer/coolers if it is not in the solicitation BOP with take care of additions post project.