This is a Questions & Answers document for Federal Correctional Institution (FCI) Aliceville's fire suppression system replacement solicitation (15B318Q00000016). The document clarifies key information regarding the scope and site visit procedures for this new contract opportunity with the Department of Justice Bureau of Prisons.
The contract requires replacement of fire suppression dry valves and air compressors that were originally installed in 2011. No prior repairs or maintenance work has been completed on the existing system since the last solicitation. Prospective contractors should note that the original equipment information—including photographs of dry pipe valves and air compressor data plates, manufacturer and model numbers, valve quantity confirmations, and previous inspection or deficiency reports—can be obtained during a scheduled site visit rather than provided electronically. Site visits are coordinated by email with the contracting point of contact, with bidders required to submit four date and time options for scheduling. Access to FCI Aliceville requires that each individual visitor complete an NCIC form for security clearance approval prior to entry. The solicitation deadline has been extended to July 27, 2028, at 12:00 p.m. CST. This is a new competitive opportunity with no incumbent contractor.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers for 15B318Q00000016
FCI ALICEVILLE- FIRE SUPPRESSION DRY SYSTEMS
Q: Has any company come in and completed any repairs on the fire protection systems and the valves?
A: No work has been completed on the existing system since the previous site visit on the last solicitation.
Q: Is this system in the same condition?
A: Yes
Q: Site visit A: Schedule a site visit via email to the listed point of contact.
Q: Is this a new contract OR if there is (was) an incumbent performing these services.
A: This is a new contract.
Q: Photographs of each existing dry pipe valve.
Photographs of the air compressor data plates (manufacturer, model number, horsepower, voltage, CFM, etc.).
Manufacturer and model numbers of the existing dry pipe valves.
Confirmation of the quantity of each valve size to be replaced.
Any previous inspection reports or deficiency reports related to these systems.
Any additional drawings, equipment schedules, or documentation identifying the existing equipment.
If this information is not available electronically, would it be possible to obtain it during a scheduled site visit?
A: This information can be obtained via site visit once one has been scheduled.
Q: What visitor information is required for site visit approval/clearance?
A: Please be advised that each individual person wishing to enter the Federal Correctional Institution Aliceville must fill out an NCIC form in the attachments and be approved to gain access.
Q: What dates and times can we set up a site visit?
A: Please send four dates and times with availability and we will provide you with the best date and time slot according to everyone’s schedule and availability.