This document is a Questions and Answers file for a federal solicitation for spray foam insulation installation at USP Canaan Warehouse. The solicitation (15B21526Q00000004) is a small business set-aside under NAICS code 238310 for close cell spray foam insulation installation. Key details include a work completion deadline of May 31, 2026, working hours of 7am-3:30pm, and application across 12,000 total square feet of warehouse space. The project involves installing spray foam insulation on metal roof decks, with the contractor responsible for applying an intumescent/fire-retardant coating.
The solicitation will be awarded based on best value considering price, past performance, and lead/delivery time. Potential bidders must complete a criminal history background check through the National Crime Information Center (NCIC) and the site is managed by the Department of Justice Bureau of Prisons. The bid submission deadline was extended to January 19, 2026 at 10:00AM EST, with questions accepted until January 13, 2026. The Service Contract Act applies, and the occupation code for this requirement is 23470-Laborer. Site visits have been conducted, and coordination for additional visits can be made through USP Canaan General Foreman Max Fries.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Second Site Visit Meeting Minutes (with sign in sheet).pdf | ||
| RFI-Questions and Answers.docx | DOCX document | |
| NCIC Criminal History Check.pdf | ||
| Revised Price quote sheet.pdf | ||
| Amendment 0001.pdf | ||
| Statement of Work.pdf | ||
| Wage Determinations- SCA.txt | TXT text file | |
| Complete Solicitation Warehouse.docx | DOCX document | |
| Price quote sheet.pdf | ||
| Contractor Information Sheet.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
[Type here]
USP Canaan Spray Foam Installation Question/Clarifications 2nd Site Visit
1. During the initial site visit, it was discussed that the Government intends for work to be performed on Thursdays and Fridays due to the 24-hour no-exposure requirement and the required 24-hour cure time. We understand from the RFI responses provided with Amendment 2 that the specified working hours (7AM – 3:30 PM) cannot be changed. Can the Government please clarify whether the affected areas may be closed to allow work to be performed in all or some of the areas on days other than Thursday and Friday?
Working hours for this project will 7am-3:30 PM. Affected areas may be closed on other days with prior approval in close coordination with the COR.
2. The period of performance, specifically the number of days required for completion, is not specified in the solicitation. Can the Government please clarify whether there is a minimum or maximum allowable timeframe for completing this work? If no specific timeframe has been established, does the Government have an anticipated or preferred duration for completion?
Will need to be completed by 5/31/2026
3. As there is no occupation code specifically for insulation contractors, the closest we've found are the following below. Can either of these be used?
23370 – General Maintenance Worker 23470 – Laborer
The occupation code for this requirement should be 23470-Laborer
4. Are the days/hours to work on site still Monday through Friday 7am - 3:30pm?
Yes
5. Is this 12,000 sq ft TOTAL for all 3 warehouse buildings, or 12,000 sq ft PER building (36,000 total)?
Total Sq. ft.
6. Is this a prevailing wage project?
The Service Contract Act applies to this requirement
7. Do you know the square footage/height of the ceiling and the walls separately?
No, the Government does not have the exact measurements on each area
8. Is the ceiling a metal roof deck?
Yes
9. I saw you’ve shared the pictures in Amendment 001, is there a drawing for the warehouse too?
No
10. What’s the recommended adhesion temp to metal, that’s required?
Installer and product will determine this
11. Is there flexibility to schedule work in spring/summer 2026 (when temperatures reliably exceed 50°F), or is winter performance required?
Yes, work shall be completed by May 31, 2026
12. If winter is required, will conditional/limited warranties be accepted, or alternatives considered (e.g., contractor-provided temporary heating at additional cost)?
No
13. Are provisions available for pre-heating the space, and who would bear responsibility/cost?
Space already heated, any additional heating would be the responsibility of the Contractor