This solicitation seeks offers to construct and install a base building generator and enclosure at the Smithsonian Institution's Submillimeter Array Base Facility in Hilo, Hawaii. The fixed price contract is estimated between $900,000 to $1.5 million and includes site work, infrastructure installation, a generator, load bank, and optional storage building and fencing. Offerors must be qualified to perform electrical and civil site work and commission the generator and load bank. The base contract period of performance is 182 calendar days with an additional 90 days optional for storage building construction. Responses are due as outlined in the solicitation documents.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Blank bid summary
| Title : | Construct Base Building Generator and Enclosure | Prepared by : |
| Facility : | HILO | Company Name: |
| Project Number : | 1583705 | Date : |
| Base Bid | ||||
| BASE BID: All work associated with civil site work, structural slab, new site infrastructure, electrical infrastructure at HILO as described in the specifications and drawings (1583705) both dated July 11, 2019. | ||||
| Description | Material | Labor | Equipment | Total |
| Div. 1 General Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 2 Existing Conditions | $ - 0 | $ - 0 | $ - 0 | |
| HAZMAT | $ - 0 | $ - 0 | $ - 0 | |
| Div. 3 Concrete | $ - 0 | $ - 0 | $ - 0 | |
| Div. 4 Masonry | $ - 0 | $ - 0 | $ - 0 | |
| Div. 5 Metals | $ - 0 | $ - 0 | $ - 0 | |
| Div. 6 Wood, Plastics and Composites | $ - 0 | $ - 0 | $ - 0 | |
| Div. 7 Thermal and Moisture Prot. | $ - 0 | $ - 0 | $ - 0 | |
| Div. 8 Openings | $ - 0 | $ - 0 | $ - 0 | |
| Div. 9 Finishes | $ - 0 | $ - 0 | $ - 0 | |
| Div. 10 Specialties | $ - 0 | $ - 0 | $ - 0 | |
| Div. 11. Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Div. 12 Furnishings | $ - 0 | $ - 0 | $ - 0 | |
| Div. 13 Special Construction | $ - 0 | $ - 0 | $ - 0 | |
| Div. 14 Conveying Systems | $ - 0 | $ - 0 | $ - 0 | |
| Div. 21 Fire Suppression | $ - 0 | $ - 0 | $ - 0 | |
| Div. 22 Plumbing | $ - 0 | $ - 0 | $ - 0 | |
| Div. 23 HVAC | $ - 0 | $ - 0 | $ - 0 | |
| Div. 26 Electrical | $ - 0 | $ - 0 | $ - 0 | |
| Div. 27 Communications | $ - 0 | $ - 0 | $ - 0 | |
| Div. 28 Electronic Safety & Security | $ - 0 | $ - 0 | $ - 0 | |
| Div. 31. Earthwork | $ - 0 | $ - 0 | $ - 0 | |
| Div. 32 Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | |
| Div. 33 Utilities | $ - 0 | $ - 0 | $ - 0 |
BASE BID SUBTOTAL
| Overhead and Profit | $ - 0 |
| Performance Bond | $ - 0 |
Total
| BASE BIDTotal | ||
| Title : | Construct Base Building Generator and Enclosure | Prepared by : |
| Facility : | HILO | Company Name: |
| Project Number : | 1583705 | Date : |
| OPTION 1 | ||||
| OPTION 1: All work associated with enclosure storage room, fencing enclosure, electrical work, plumbing and items not in base bid at HILO as described in the specifications and drawings (1583705) both dated July 11, 2019. | ||||
| Description | Material | Labor | Equipment | Total |
| Div. 1 General Conditions | $ - 0 | $ - 0 | $ - 0 | |
| Div. 2 Existing Conditions | $ - 0 | $ - 0 | $ - 0 | |
| HAZMAT | $ - 0 | $ - 0 | $ - 0 | |
| Div. 3 Concrete | $ - 0 | $ - 0 | $ - 0 | |
| Div. 4 Masonry | $ - 0 | $ - 0 | $ - 0 | |
| Div. 5 Metals | $ - 0 | $ - 0 | $ - 0 | |
| Div. 6 Wood, Plastics and Composites | $ - 0 | $ - 0 | $ - 0 | |
| Div. 7 Thermal and Moisture Prot. | $ - 0 | $ - 0 | $ - 0 | |
| Div. 8 Openings | $ - 0 | $ - 0 | $ - 0 | |
| Div. 9 Finishes | $ - 0 | $ - 0 | $ - 0 | |
| Div. 10 Specialties | $ - 0 | $ - 0 | $ - 0 | |
| Div. 11. Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Div. 12 Furnishings | $ - 0 | $ - 0 | $ - 0 | |
| Div. 13 Special Construction | $ - 0 | $ - 0 | $ - 0 | |
| Div. 14 Conveying Systems | $ - 0 | $ - 0 | $ - 0 | |
| Div. 21 Fire Suppression | $ - 0 | $ - 0 | $ - 0 | |
| Div. 22 Plumbing | $ - 0 | $ - 0 | $ - 0 | |
| Div. 23 HVAC | $ - 0 | $ - 0 | $ - 0 | |
| Div. 26 Electrical | $ - 0 | $ - 0 | $ - 0 | |
| Div. 27 Communications | $ - 0 | $ - 0 | $ - 0 | |
| Div. 28 Electronic Safety & Security | $ - 0 | $ - 0 | $ - 0 | |
| Div. 31. Earthwork | $ - 0 | $ - 0 | $ - 0 | |
| Div. 32 Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | |
| Div. 33 Utilities | $ - 0 | $ - 0 | $ - 0 |
OPTION 1 SUBTOTAL
| Overhead and Profit |
| Performance Bond |
Total
OPTION 1Total