Amendment 0003.pdf

PDF 173 KB Posted

Attached to
SOLICITATION SMITHSONIAN SMA FACILITY CONSTRUCT BASE BUILDING GENERATOR AND ENCLOSURE
Solicitation number
33330222RF0010006
Issued by

About this file

This solicitation seeks offers for a construction project at the Smithsonian Institution's Astrophysical Observatory in Hawaii. The selected contractor will construct and install a base building generator and enclosure including site work, infrastructure connections, installation of a provided generator and load bank, and optional construction of a storage building and fencing. Offerors must be qualified to perform electrical and civil site work and commission the generator and load bank. The base contract period of performance is 182 calendar days with an optional additional 90 days for related work. Proposals are due February 1, 2022 and the project value is estimated between $900,000 to $1.5 million.

View the file

Other files

File Type Posted
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 002.pdf PDF
Amendment 0001.pdf PDF
Davis Bacon.pdf PDF
1583705_Final Drawings w OPTION.pdf PDF
1583705_Final Specifications w attch.pdf PDF
Contractor_COVID-19_Safety Protocols_10.19.21.pdf PDF
1583705 HILO Construct Base Bldg Generator and Enclosure Bid Sch.xlsx XLSX spreadsheet
Release of Claim.pdf PDF
Performance bonds.pdf PDF
Payment Bonds.pdf PDF
Final RFP SAO HI Construct Base Building Generator and Enclosure.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

33330222RF0010006

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

OCON

Washington DC 20013-7012

MRC 1200

P.O. BOX 37012

SMITHSONIAN INSTITUTION

158370501/10/20220003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Willard B. Powell

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

9B. DATED (SEE ITEM 11)

01/10/2022

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

A. The Solicitation Number cited above, for the SAO HI: Construct Base Generator and Enclosure at the Smithsonian Institution's Astrophysical Observatory is hereby amended as follows:

A.1. Attached hereto and made part of this Amendment Three are the SI Responses to RFI's for Questions Number 1-3 (additional RFI's will be posted soon)

A.2. Offerors shall acknowledge receipt of all amendments to this solicitation signed and dated and submit with proposal.

B. It is desired that all questions/clarifications be sent in, sequentially numbered for

Continued ...

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

33330222RF0010006/0003

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

example first questions 1,2,3, second set of questions 4, 5, 6, etc. in word format to

ChanVC@si.edu. It is requested that all RFIs be sent in no later than January 14, 2022 at 5PM

EST.

C. The Due Date for Receipt of Proposals remains

February 1, 2022 at 5 PM EST.

Except as provided herein, all other provisions, terms and conditions of the Solicitation remain unchanged.

END OF AMENDMENT THREE

Smithsonian Institution Office of Planning Design & Construction

PROJECT: SAO-HI: Construct Base Generator and Enclosure (SF Project # 1583705)

LAST UPDATED: 1/10/2022

Request for Information SI Response

Factor 4 - Safety/EMR Rate. Section L.27.IV states that “If your EMR is above

1.0, provide a written explanation. Section M.4.2.(d) states “The Offeror must have an experience modification rating of less than 1.0 to be considered acceptable”. These two sections conflict. We are requesting that Section M be revised to allow Offerors who provide an acceptable written explanation as to why their EMR is over 1.0 as noted in Section L, will be acceptable for the safety factor when their proposal is evaluated.

Section M.4.2.d. is revised to include the statement "Offeror with an experience modification rating over 1.0 may be considered acceptable with a reasonable written explanation."

Experience on Similar Projects – Please confirm whether or not it is acceptable to utilize key subcontractor experience to meet the similar project experience requirement.

Prime experience worked as a team with the subcontractors in past projects is acceptable to use to meet Experience on

Similar Projects.

Key Personnel and Subcontractors – Please confirm if you want resumes of personnel for key subcontractors or just a qualifications (company overview) of the key subcontractor.

Resumes of personnel for key contractors shall be submitted.