14771 Nicolet Follow-on PWS.pdf
PDF 337 KB Posted
- Attached to
- Nicolet iS50 Maintenance
- Solicitation number
- FA822726Q3002
About this file
This Performance-Based Work Statement (PWS) is for maintenance of materials properties testing equipment for the U.S. Air Force's 809th Maintenance Support Squadron (MXSS/MXDEC) at Hill Air Force Base. The specific equipment is a Nicolet iS50, which is used to test hazardous waste disposals. The contractor is required to provide full service maintenance, repair, and support to Original Equipment Manufacturer (OEM) standards, including one preventive maintenance visit per year, changing pump oil, aligning lenses and mirrors, updating operating software, and cleaning and aligning the sample mount.
Key service requirements include maintaining the instrument within manufacturer specifications, conforming to National Environmental Laboratory Accreditation Program (NELAP) certification standards, using only new original equipment manufactured parts, and providing on-site service within 72 hours of being contacted. The contractor must return all replaced parts to the Government Representative and submit maintenance and repair reports within five business days of completing work. The contract will be performed at Hill Air Force Base, Utah, with normal operating hours Monday through Friday from 0600-1500, excluding federal holidays. The document includes detailed safety, security, and operational guidelines for performing the maintenance services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SCA-WD 2015-5483 rev 27.pdf | ||
| 14771 CDRL A001.pdf | ||
| Nicolet Synopsis Solicitation.pdf | ||
| Hill AFB 22258350 Sole Source letter.pdf | ||
| 14771 Nicolet SSJ REDACTED.pdf | ||
| 14771 CDRL A002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE-BASED WORK STATEMENT (PWS)
MAINTENANCE OF MATERIALS PROPERTIES TESTING EQUIPMENT
U.S AIR FORCE
809th Maintenance Support Squadron (MXSS/MXDEC)
Terri Kuker
[Version 1]
9/24/2025 i
TABLE OF CONTENTS
1 DESCRIPTION OF SERVICES
2 BASIC SERVICES
2.1 SERVICES GUIDELINES
2.2 NICOLET iS50
3 SERVICE SUMMARY (SS)
4 CDRL Summary 5 Quality Assurance
6 ADDITIONAL REQUIREMENTS
7 SECURITY:
8 GENERAL INFORMATION
Appendix A – ACRONYMS AND ABBREVIATIONS appendix B – EQUIPMENT LISTING Appendix C – SAFETY
1 DESCRIPTION OF SERVICES
The Nicolet iS50 is used to test all hazardous waste disposals at Hill Air Force Base. The contractor shall provide full service maintenance, repair, and support of the instrument listed in Appendix B to the Original Equipment Manufacturer (OEM) standards.
2 BASIC SERVICES
2.1 SERVICES GUIDELINES
2.1.1 The contractor shall maintain and/or repair those instruments to ensure they operate within manufacturer’s standard product specifications. The repair shall conform to National Environmental Laboratory Accreditation Program (NELAP) certification standards. The contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and maintain the various instruments listed in Appendix B.
2.1.1.1 The contractor shall use only new, original equipment manufactured parts in making repairs.
2.1.1.2 All replaced parts will be returned to the Government Representative
(GR).
2.1.1.2.1 Chem Flight 809 MXSS/MXDTAB
2.2 NICOLET iS50
2.2.1 The contractor shall also provide one (1) Preventive Maintenance visit per year on listed items in Appendix B. This visit shall be scheduled by the contractor, but prior coordinated with the user.
2.2.1.1 Maintenance shall include: changing the pump oil, aligning lenses and mirrors, ensuring operating software is updated, and ensuring sample mount is cleaned and aligned, and all other maintenance necessary to conform to OEM standards.
2.2.2 On-site service within 72 hours from the time contractor is contacted and it is determined that on-site services is necessary. Unlimited number of service calls.
2.2.3 The contractor shall provide the Government with a phone number for service calls.
2.2.4 Maintenance and Repair Report, contractor shall provide reports on all maintenance and repair within five (5) business days of completion of work.
(CDRL A001)
3 SERVICE SUMMARY (SS)
Performance Objective PWS Para Performance Threshold/CDRL
The contractor shall return each system to the original performance level.
PWS Para 2.1.1
(Satisfactory) repaired to OEM standard and NELAP certification.
One (1) Preventive Maintenance visit per year on listed items in Appendix B.
PWS Para
2.2.1 and 2.3.1
(Satisfactory) Preventative Maintenance is accomplished.
On-site service within 72 hours from the time contractor is contacted and it is determined that on-site services is necessary. Unlimited number of service calls.
PWS Para
2.2.2 and 2.3.2
(Satisfactory) will be assessed when the contractor meets the desired response time no less than 95% of the time.
Contractor shall provide reports on all maintenance and repair within five (5) days of completion of work. (CDRL A001)
PWS Para 2.2.4
(Satisfactory) delivery of the CDRL.
4 CDRL SUMMARY
Contract information data shall be delivered electronically in accordance to the corresponding requirement for each Data Item listed in Table 4-1 (below). The contractor shall have no more than one error per quarter for all CDRL submittals. The contractor shall submit CDRLs according to the due date indicated and have no more than one CDRL per quarter submitted after the identified due date. Grammatical errors do not count as an error. Substantive mistakes shall be corrected within two working days and corrective action taken to prevent recurrence of inaccurate late CDRLs.
Table 3-1
Exhibit Title PWS Paragraph
Delivery
A001 Maintenance Service
Reprot
2.2.4
NLT five (5) business days after completion of work.
A002 Safety Plan Appendix C
Section A 15 days ARO
5 QUALITY ASSURANCE
5.1 Government Quality Assurance. The government shall inspect and evaluate the contractors’ performance to ensure services are received in accordance with requirements set forth in this contract. The COR will use the contractor’s work schedule, or modified version thereof, to record validation results. Results of the validation then becomes the official Air Force record of the contractor’s performance. Government surveillance of tasks not listed in the PWS or by methods other than those listed in the PWS (such as provided for by the Inspection of Services clause) may occur during the performance period of this contract. Such surveillance will be done according to standard inspection procedures or other contract provisions. Any action taken by the CO as a result of surveillance will be according to the terms of this contract.
5.1.1 The government will periodically evaluate the contractor’s performance in accordance with the Quality Assurance Surveillance Plan (QASP). The government may inspect each task as completed and increase the number of quality assurance inspections if deemed appropriate because of repeated failures discovered during surveillance inspections or because of repeated customer complaints. Likewise, the government may decrease the number of quality assurance inspections if performance dictates.
5.1.2 When an observation indicates defective contractor performance, the COR will require the contractor’s Contract Manager or representative at the site to initial the observation. The formal process is, when a performance threshold has not been met or contractor performance has not been accomplished, the COR will initiate and provide the CO a Corrective Action Report (CAR) for issuance to the contactor. The contractor shall respond to the CAR IAW instructions provided and in the CAR. While the formal process of this paragraph to address unacceptable contractor performance is always available, the Government reserves the right to initiate a less formal process involving the contractor, the COR and the CO meeting together at no additional cost to the Government regarding unacceptable contractor performance.
5.2 Performance Assessment.
5.2.1 Periodic Surveillance. This method requires the COR to employ a “spot check” style of evaluation based on the contractor’s services. Periodic surveillance will be conducted on a scheduled basis (daily, weekly, monthly, quarterly, semi-annual or annually) and may be adjusted, based on quality trends.
5.2.2 Customer Complaints. The COR will receive and investigate all complaints.
The COR will be responsible for validating customer complaints. The CO shall make final determination of the validity of customer complaint(s) in cases of disagreement with the COR and the contractor. Validated customer complaints shall be reperformed, if possible, within 3 business days of notification at no additional cost to the Government IAW the inspection clause of the contract and the direction of the Contracting Officer.
5.2.3 Review of Audits. COR reviews results of the contractor’s accepted quality management system audits and related quality metrics.
5.2.4 100 Percent Inspection. This method requires the COR to do 100 percent inspection on all task performed. Appropriate for tasks that occur infrequently.
Usually only deals with Safety and/or Security, unless mandated by an Air Force Instruction (AFI) or industry standard.
5.3 Quarterly Progress Meetings. The CO, Government’s Program Manager (PM), /Functional Services Manager (FMS), COR, other government personnel as appropriate, and the contractor shall meet quarterly to discuss the contractor’s performance.
The following issues, at a minimum, shall be discussed:
- Opportunities to improve the contract,
- Any modifications required of the contract,
- Unsatisfactory inspections,
- Valid customer complaints against each performance objective observed, and
- Steps taken by the contractor to prevent occurrences in the future.
The contractor shall provide a summation of unsatisfactory inspections and customer complaints and provide insight into any identified trends.
5.3.1 The minutes of these meetings will be reduced to writing, signed by the CO and any other signatures as deemed appropriate, distributed to the functional area and the contractor. Should the contractor not concur with the minutes, the contractor will provide a written notification within 5 working days to the CO identifying areas of non-concurrence for resolution.
5.4 Contracting Officer Representative (COR). CORs are representatives of the CO and will participate in the administration of this contract. After award of the contract, the contractor will be provided a letter identifying the COR and setting forth their duties and authorities. The COR is not authorized to change any of the terms and conditions of the contract/task order.
5.4.1 Acquisition Team Meetings. The contractor’s Contact Manager (CM) with the CO, Contract Administrator (CA), COR, and other government personnel constitute an acquisition team [See FAR 1.102 (c)] and shall meet on a regular basis. The Acquisition Team will establish how often meetings are needed based on contract complexity. As a subset of the Acquisition Team, Government members of the Acquisition Team are often referred to as the Multi-Functional Team (MFT) and may meet as determined by the MFT. The contractor may request a meeting with the CO when the contractor believes such a meeting is necessary. If the CO or CA deems necessary, written minutes of any such meetings shall be recorded by the CA in the contract file and signed by the PM and the CO or CA. If the contractor does not concur with any portion of the minutes, such nonoccurrence shall be provided in writing to the CO within 10 calendar days following receipt of the minutes.
6 ADDITIONAL REQUIREMENTS
6.1 Government provided support
The Government will provide necessary working space, including heat, light, ventilation, and electrical powered outlets for the use of contractors’ maintenance personnel. The Government shall provide access to the necessary facilities where the equipment resides. The place of performance shall be Hill Air Force Base (AFB), UT.
Government telephones shall be used for official business only.
The contractor shall be responsible for safeguarding all Government property provided for contractor use.
7 SECURITY:
Security Review Control Number: Charles Stiefken Security Review Date: 10/28/25 Reviewed By: Charles Stiefken
7.1 Conflicts of Interest
7.1.1 The contractor shall not assign to contract or task order performance any person, including any employee of the U.S. Government, if employing that person would create a conflict of interest under any law, regulation or policy of the United States Government. Additionally, the contractor shall not assign to contract or task order performance, any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval according to DoD Directive 5500.7-R, Standards of Conduct, and any other applicable regulation or policy of the Department of the Air Force or its subordinate commands, as applicable, including but not limited to Air Force Materiel Command.
7.1.2 Contractors will not use any other form of identification to access any government installation or facility while working on a government contract except the issued credentials associated with the awarded contract or task order.
Example: using a military retiree card to access an installation to work on a contract.
7.2 Security Requirements
7.2.1 Contractor shall be escorted to the facility and 809 MXSS/MXDTAB will remain with the contractor until all work has been accomplished; security clearance will not be required.
7.2.2 Access to the base is governed by military protocol. The contractor shall notify 809 MXSS/MXDTAB at least 1 day in advance of the planned arrival date and time and shall provide all required information for a Base Access Pass.
7.2.3 Government telephones, computers, fax machines, copy machines, and other equipment shall be used only for official Government business
7.2.4 Foreign nationals (FN) will not be escorted, or sponsored, onto the installation without being properly vetted. Any request must follow 309 MXSG OI 16-102, Security Requirements section 7. FNs must be approved for access via the Foreign Disclosure Office and Air Force Office ofph Special Investigations
(AFOSI).
7.2.5 The contractor shall comply with all security, force protection, operation security and antiterrorism requirements at each installation.
7.2.6 The contractor shall comply with 809 MXSS/MXDTAB in and out-processing procedures for all contractor personnel to ensure required security-related briefings and debriefings are accomplished. Specific in and out-processing checklists may be included at the task order level.
7.2.7 The contractor will use the 809 MXSS/MXDTAB. as the primary means of reviewing and approving forms and for communicating with necessary government representatives.
7.2.8 Communications Security
7.2.8.1 All communications with DoD organizations are subject to Communications Security (COMSEC) review.
7.2.8.2 The DoD authorizes the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations.
7.2.8.3 The Government advises the contractor that at any time they place a call to, or receive a call from, a DoD organization, they are subject to COMSEC procedures.
7.2.8.4 The contractor assumes the responsibility for ensuring wide and frequent dissemination of the above information to all employees dealing with official DoD information.
7.2.9 Operations Security (OPSEC) Requirements
7.2.9.1 During the course of this contract, in addition to those restrictions, instructions and guidelines delineated in the PWS and/or other references provided, the contractor will adhere to the following minimum requirements.
7.2.9.2 Introduction of personnel electronic devices into government spaces, laptops, tablet Personal Computers (PC)s, cellular phones, cameras, recording devices, and data recording/storage devices is strictly controlled and forbidden in most cases.
Company issued equipment required for the performance of work must be approved by the government MXSG security manager (SM). Photography and recording is not allowed in restricted areas and controlled areas except for official use and by approved photography letter only. NOTE: Unless otherwise stipulated in the contract, contact the Installation Public Affairs or SM for approval.
7.2.9.3 Contractor personnel shall not discuss government operations in public or over unprotected or unencrypted communications.
Official Business controlled unclassified information (CUI) may only be transmitted as directed in the PWS as it adheres to CUI Guidelines.
7.2.9.4 The Contractor shall not post to company websites, publications, newsletters, or other media any images, data or information that reveal sensitive government operations, personnel, equipment, and/or classified or CUI. When in doubt, company press releases, related to this contract, will be coordinated through the Public Affairs Office prior to release.
7.2.9.5 Contractor personnel shall not disclose to unauthorized third parties, post to unofficial sites (including all Social Networking sites) any images, data or information that reveals sensitive government operations, personnel, equipment, including, but not limited to: Tactics, techniques and procedures, production or work schedules, any visible or concealed modifications, upgrades, additions to Air Force installations, property or weapons or equipment; increases, change, or decreases in work/deployment frequency or government personnel, project schedules, logistics or material delivery schedules; specialized equipment orders, deliveries, shipments, etc. (Unauthorized disclosure and transfer of National Security Information is punishable under 18 USC § 793.); Unauthorized disclosures and attempts to solicit this type of information by unauthorized third parties or others not affiliated with this contract shall be reported to the SM and/or installation SFS, COR, and, if applicable, the company FSO and/or the Defense Security Service.
7.2.9.6 Practice OPSEC and implement countermeasures to protect Critical Information (CI) and other sensitive unclassified information and activities vigilance or degrade the planning and execution of military operations performed or supported by the contractor in support of the mission. Protection of CI will include the adherence to and execution of countermeasures which the contractor initiates or as provided by OPSEC manager or installation OPSEC Program Manager, for CI on or related to the PWS.
7.2.9.7 The contractor must mark and protect any information IAW CUI, to include E-mail, and adhere to all CUI standards and policies.
7.2.9.8 Contractors who have access to the Ogden Air Logistics Complex (OO-ALC) and Government Servicing Units (GSU)s facilities or critical information shall have OPSEC training IAW AFI 10-701, Operations Security (OPSEC). Initial training will be approximately one (1) hour and follow-on recurring annual training will be approximately 1/2 (0.5) hour.
OPSEC training will be conducted within 30 days of assignment.
7.3 Contractor Identification & Badges
7.3.1 All contractor management, staff and contractor personnel shall be clearly identified as such at ALL times. Contractor identification shall include visible badges, conversations, mail, email, teleconferences, video teleconferences, faxes, and/or other electronic communication whether with government personnel, other contractor personnel, or with the public when supporting this contract where their status as contractor employees might not otherwise be apparent or where they might be mistaken for civil service employees. At a minimum, contractor management staff or contractor personnel shall clearly identify themselves using the label “contractor” in email addresses in accordance with Federal Acquisition Regulation (FAR) 37.114(c), Special Acquisition Requirements; opening ALL phone conversations with a statement materially the same as, “[office name], I am [employee name], a [prime contractor’s company name] employee,” including the employing contractor’s name in the letterhead and/or signature block of any written correspondence; and any other means necessary.
7.4 In/Out-Processing
7.4.1 All contractors are required to in/out-process from each respective organization regardless of if they are issued a DBIDS or CAC.
7.5 Security Incident
7.5.1 Should a security incident occur, the contractor shall: immediately report to the site location Group SM all available facts related to each instance, take such precautions as the SM may reasonably require for security purposes, take reasonable and prudent action to establish control of the scene; prevent further violation, to preserve evidence until released by proper authority; and cooperate fully and assist Government personnel as the Government conducts an investigation of the violation. NOTE: Participation shall last until the investigation is complete.
7.6 Training Requirements
7.6.1 809 Security Manager (SM), contractor and/or COR will administer and maintain all individual training and records, for compliance purposes, associated with this PWS. Training records must be made available during self-inspections and other oversight activities.
7.6.2 Contractors may be required to complete the following trainings as applicable and administered electronically, whenever possible, or in-person:
7.6.3 Training required for all personnel
7.6.3.1 Operations Security (OPSEC) Awareness – Frequency:
Initially upon assignment (within 30-days) and annually thereafter IAW AFI 10-701, Operations Security (OPSEC).
Presentation/Means: Unit Security Manager or TSS Course
#MHPSEC9800301BR.
7.6.3.2 Controlled Unclassified Information (CUI) Frequency:
Initially upon assignment (within 30-days) and annually thereafter. Presentation/Means: Unit Security Manager IAW DoDI 5200.48_AFI 16-1403, Controlled Unclassified Information (CUI).
7.6.3.3 Unit Indoctrination and Orientation Training – Frequency:
within 30 calendar days of assignment. Presentation/Means:
Unit Security Manager or CDSE Course at https://securityawareness.usalearning.gov/initialorientation/ind ex.htm. 309 MXSG initial security orientation TSS course #MHPSEC9803600BR (NOTE: for cleared personnel, initial security briefing TSS Course #MHPSEC9803601BR is required before access to classified information is granted).
7.6.3.4 Counter-Insider Threat (C-InT) Training - This training covers procedures for C-InT awareness and reporting IAW AFI 16- 1402, Counter-Insider Threat Program Management.
Frequency: Initially upon assignment (within first 30-days) and annually thereafter. Presentation/Means: Unit Security Manager or CDSE Course at https://securityawareness.usalearning.gov/itawareness/index.ht m.
7.6.4 Antiterrorism (AT) Requirements
7.6.4.1 Contractor personnel who require routine physical access to a Federally controlled facility or military installation shall complete Level I antiterrorism awareness training within 30 https://securityawareness.usalearning.gov/itawareness/index.htm https://securityawareness.usalearning.gov/itawareness/index.htm days of requiring access and annually thereafter. IAW DoD Instruction O-2000.16 Volume 1, DoD Antiterrorism (AT) Program Implementation. Training can be completed through a computer or web-based application (https://jko.jten.mil/) or under instruction of a level 1 AT awareness instructor.
7.6.5 Training Required for CAC holders
7.6.5.1 Cyber Awareness Challenge – Contractors requiring access to DoD IT systems. Frequency: Initially upon CAC issuance and annually thereafter. TSS Course #ZZ133098 – TFAT – Cyber Awareness Challenge.
7.6.6 Training for Classified Access & Contracts
7.6.6.1 INFOSEC for Cleared Personnel - This course covers rules regarding classified information and material. Audience:
Contractor personnel with secret security eligibility.
Frequency: Prior to initial access to classified information and annually until security access termination.
Presentation/Means: Unit Security Manager or Training Scheduling System (TSS), course #MHPSEC9802900BR or CDSE Course.
7.6.6.2 Security Refresher Training – Audience: Contractors working in/around classified. Frequency: Annually.
Presentation/Means: Unit Security Manager or CDSE Course at https://securityawareness.usalearning.gov/awarenessrefresher/i ndex.html. Hill AFB INFOSEC for Cleared Personnel TSS course #MHPSEC9802900BR.
8 GENERAL INFORMATION
8.1 Hours of Operation
8.1.1 Normal Hours of Operation: The contractor shall perform the services required under this contract during the following hours: Monday through Friday 0600- 1500 – EXCEPT FEDERAL HOLIDAYS and other base closures.
8.1.2 Federal Holidays: Unless otherwise required by the Government, the contractor shall not have access to the Government facilities on the following federal holidays: New Year’s Day, Martin Luther King’s Birthday, Washington’s Birthday, Memorial Day, Independence Day, Juneteenth, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day. If a holiday falls on Saturday, it is observed on Friday and working hours are Monday through Wednesday for that week. If the holiday falls on a Sunday, it is observed on Monday. Any other circumstances that may prompt base closure, such as Days of National Mourning, may also restrict opportunity to perform the exchanges. In the event of a base closure, exchanges shall be performed on the next business day. There may also be up to six AFMC Goal Days and four Wingman Days per year awarded to Government civilian employees, as well as possible weather related days and Government directed holidays. On these days, the contractor shall not generally be required to work and the Government shall not be billed for work not performed.
8.1.3 NOTE: Good Friday is regarded as a holiday by the Utah Wage Determination;
however, Good Friday is not a Federal Holiday so the Government facilities will be open for work that day. The contractor shall plan on employees working business as usual on that day, unless the Government supervisor or section chief determines that such services are either unnecessary or will be less than a full normal workday.
8.1.4 Down Days/Weather Days: The Government will notify the contractor when official notice has been given for Energy/Weather Down days. The contractor is not expected to work on any Energy/Weather Down days.
8.1.5 Rescheduling: Down Days/Weather days may be rescheduled if conditions/emergency operations require.
8.2 Environmental Controls
8.2.1 Hazardous Work Environment: The Contractor shall ensure their employees are made aware that the performance of these services will occur in industrial areas.
The industrial complex at Hill AFB has the potential to expose workers to hazardous materials which may include, but is not limited to: hexavalent, chrome, cadmium, beryllium, lead, and others. While the Contractor shall not perform duties in a regulated area (where exposure are expected to exceed the permissible exposure limits set by 29 CFR1910.10xx), there may be contact hazards with these materials. The contractor shall ensure proper protective measures and training is taken to ensure contracted employees are protected from hazards. The 75th Air Base Wing (ABW) Bio-Environmental Engineering Flight produces BIO Survey of these areas which will be made available upon award.
8.3 Compliance with Laws and Regulations.
8.3.1 The contractor shall be knowledgeable of and comply with all applicable Interstate, Federal, State, and Local laws, regulations, and requirements regarding environmental protection. In the event environmental laws/regulations change during the term of this contract, the contractor is required to comply as such laws come into effect.
8.4 Conservation of Utilities
8.4.1 The contractor shall ensure that contractor employees follow applicable Air Force base utilities conservation practices to reduce waste as much as practicable. The contractor shall be aware of OO-ALC Energy Policy. A copy shall be provided upon request. (See: ePubs>Units>OO-ALC21-110 para. 9.2).
Contractors contribute to the effectiveness of the OO-ALC Energy Management System (EnMS), including the achievement of its objectives and energy targets.
Through this contribution, the benefits of improved energy efficiency are realized. It is expected that the contractor ensures their activities are in line with improving OO-ALC energy performance. Contractors found negligent of these requirements can have a negative impact.
8.4.2 The contractor shall be responsible for operating under conditions that prevent the waste of utilities, which include the following:
A. Lights shall be used only in areas where and when work is being performed.
B. Mechanical equipment controls for heating, ventilation, and air conditioning systems shall not be adjusted by the contractor or by contractor employees unless authorized.
C. Water faucets or valves shall be turned off after the required use.
8.5 Notification of Environmental Spills
8.5.1 If the contractor spills or releases any substance contained in 40 CFR 302 into the environment, the contractor or its agent shall immediately report the incident to the 809 MXSS/MXDTAB.The liability for the spill or release of such substances rests solely with the contractor and its agent.
8.6 Safety Program
8.6.1 The contractor shall implement a safety program that ensures protection of Government personnel and property. (See Appendix C)
8.6.2 In the event of an accident/mishap, the contractor shall take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence. An email copy of the mishap / incident notification shall be sent within three calendar days to the 809 MXSS/MXDTAB, who will forward it to OO-ALC safety.
8.7 Government Observations
8.7.1 During the period that the contractor is working on equipment, government personnel, other than CO, may, from time-to-time, observe contractor operations.
However, these personnel may not interfere with contractor performance.
8.8 Foreign Object Damage (FOD) and Tool Control
8.8.1 The contractor shall follow the applicable guidance in
chapters/paragraphs/sections of AFI 21-101 and HQ AFMC, Hill AFB, and 309 MXW supplements to the AFI 21-101 concerning base tool (chapter 10 section B), and FOD control policies (chapter 14, and sub paragraphs designated as 41), daily. Cloth rags are considered tools and will follow the same regulations and procedures as tools.
8.8.2 If tools, and/or equipment are lost, the contractor will report the loss to the GM/COR no later than two hours after discovery. If tools are lost or not accounted for, then the contractor shall implement the lost tool procedures of AFMC supplement to AFI 21-101, chapter 10, section B.
8.8.3 Contractors performing functions in industrial areas on the center shall have a method for controlling and accounting for all tools used. All contractors working on the center shall inventory their tools at the beginning and end of each shift and at the end of each task to check for any lost or missing tools.
8.9 Environmental
8.9.1 Weather Hazards. Workers may encounter hazardous weather conditions including snow, heavy rain, lightning, extreme dust, and other conditions that warrant appropriate precautions.
8.9.2 Inclement Weather. If the base closes due to inclement weather, the contractor will be released, by the installation commander, with the general population of the base at no decrement to contract price. The contractor will follow the local procedures for reporting in inclement weather as advertised on local television and radio stations.
8.10 Miscellaneous
8.10.1 Notification of Debarment/Suspension Status. The contractor shall provide immediate notice to the CO in the event of being suspended, debarred or declared ineligible by any other federal department or agency, or upon receipt of a notice of proposed debarment from another DoD Agency, during the performance of this contract.
8.10.2 Data Rights. The government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be government owned and are the property of the government with all rights and privileges of ownership/copyright belonging exclusively to the government. These documents and materials may not be used or sold by the contractor without written permission from the CO. All materials supplied to the government shall be the sole property of the government and may not be used for any other purpose. This right does not abrogate any other government rights.
APPENDIX A – ACRONYMS AND ABBREVIATIONS
Acronym/Abbreviations Definition AF Air Force AFB Air Force Base AFI Air Force Instruction AFMC Air Force Material Command ANSI American National Standards Institute ASO American Standards Organization CAC Common Access Card CAR Corrective Action Report CDRL Contractor Data Requirements Listing CFR Code of Federal Regulation CMRA Contractor Manpower Reporting Application CO Contract Officer COR Contracting Officer Representative DoD Department of Defense EPA Environmental Protection Act FAR Federal Acquisition Regulation FE Facility Engineer FOD Foreign Object Damage GR Government Representative HAFB Hill Air Force Base IAW In Accordance With IC Ion Chromatography IEC International Electrotechnical Commission ISO International Organization for Standardization NELAP National Environmental Laboratory Accreditation Program OEM Original Equipment Manufacturer OSHA Occupational Safety and Health Act PE Performance Evaluation POP Period of Performance PWS Performance-Based Work Statement QCP Quality Control Plan SS Service Summary TO Technical Order TCIR/DART Total Case Incident Rate/Days Away Restricted or Transferred VPP Voluntary Protection Program
APPENDIX B – EQUIPMENT LISTING
Equipment Description Serial Number Nicolet iS50
Nicolet iS50 S/N AUP1400352
APPENDIX C – SAFETY
SAFETY, FIRE PROTECTION AND HEALTH
SPECIFICATION
INDUSTRIAL SAFETY REQUIREMENTS
OGDEN AIR LOGISTICS COMPLEX
UNITED STATES AIR FORCE
HILL AIR FORCE BASE, UTAH 84056
27 Oct 2025 Reviewed by:
Joshua Morris
OO-ALC/SE
801-586-3554
Control Number: JM2510002
A. Safety Program Requirements
The contractor shall implement a safety program plan that ensures protection of Government personnel and property. (CDRL A002) (DI-SAFT-82080) The program shall consist of, as a minimum:
1. Mishap reporting, as defined in paragraph B1 below.
2. A Safety Plan that addresses, as a minimum, the subjects listed in Section II –Specific Requirements, and shall be used during the performance of the work described in the contract. The Safety Plan shall be approved by OO-ALC/SE (Safety Office) prior to commencement of any work described in this contract.
3. Routine and recurring surveillance to ensure the safety requirements of this contract are enforced.
4. Competent personnel to provide surveillance of the Safety Plan.
5. Identification of segregated work site locations for operations that cannot be co-mingled with general industrial operations and the process for ACO approval of operations and changes at these specific sites.
6. All contractor personnel shall be trained and qualified to perform their duties safely.
7. The contractor shall include a clause in all subcontracts requiring the subcontractors to comply with the safety provisions of this contract, as applicable.
B. Mishap Notification
1. The contractor shall notify OO-ALC/SE Workflow (OO-ALC.SE.Workflow@us.af.mil) or the Hill AFB Command Post (801-777-3007) after normal duty hours, and the designated Government Representative (GR), i.e., the ACO, PCO, or DCMA QAR (Quality Assurance Representative) within one (1) hour of all mishaps or incidents at or exceeding $2,000 (material + labor) in damage to DOD property entrusted by this contract, even if the government is wholly or partially reimbursed. This notification requirement shall also include physiological mishaps/incidents. A written or email copy of ALL the mishap/incident notification shall be sent within three calendar days to the GR, who will forward it to OO-ALC/SE. For information not available at the time of initial notification, the contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the ACO.
Mishap notifications shall contain, as a minimum, the following information:
(a) Contract, Contract Number, Name and Title of Person(s) Reporting
(b) Date, Time and exact location of accident/incident
(c) Brief Narrative of accident/incident (Events leading to accident/incident)
(d) Cause of accident/incident, if known
(e) Estimated cost of accident/incident (material and labor to repair/replace)
(f) Nomenclature of equipment and personnel involved in accident/incident
(g) Corrective actions (taken or proposed)
(h) Other pertinent information
2. The contractor shall cooperate with any and all government mishap investigations.
Additionally if requested by government personnel or designated government representative (GR), i.e., the ACO, PCO, or DCMA QAR (Quality Assurance Representative), the contractor shall immediately secure the mishap scene/damaged mailto:OO-ALC.SE.Workflow@us.af.mil property and impound pertinent maintenance and training records, until released by safety investigators.
3. The contractor shall provide copies of contractor data related to mishaps, such as contractor analyses, test reports, summaries of investigations, etc. as necessary to support the government investigation.
4. The contractor shall support and comply with the safety investigation and reporting requirements of DAFI 91-204, Chapters 1 – 5.
C. General Safety Requirements:
If the safety plan is modified, the contractor shall submit the proposed modification, in writing, to the Contract Administration Office safety representative.
The contractor is solely responsible for compliance with all federal, state and local laws, the Occupational, Safety and Health Act (OSHA) (Public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and 1926, as applicable, Air Force Occupational Safety and Health Standards (AFOSH STD), to include DAFMAN 91-203, Air Force Occupational Safety, Fire, and Health Standards, DAFI 91-204, Safety Investigations and Reports, Contract Safety, and the protection of their employees.
Additionally, the contractor is responsible for the safety and health of all subcontractor employees.
The contractor shall ensure assigned personnel are adequately trained and qualified for the task being performed. Brief all personnel on the hazards involved with operations and applicable precautions to be taken. Should unidentified hazards arise, cease operations until actions are taken to eliminate or mitigate hazards to safe levels.
Compliance with OSHA and other applicable laws and regulations for the protection of contractor employees is exclusively the obligation of the contractor. Note: AFOSH STDs are annotated because many of the Air Force Standards exceed the OSHA standard criteria. If a conflict is noted, the most stringent requirement takes precedence. The government shall assume no liability or responsibility for the contractor's compliance or non-compliance with such requirements. The contractor shall furnish to each of his/her employees a place of employment, which is free from recognized hazards. The contractor shall brief his/her employees on the safety requirements of this contract and on hazards associated with prescribed tasks. The contractor is responsible for compliance with OSHA Public Law and the resultant standards identified within. In addition, the contractor is required to flow down the safety requirements/specification to all subcontractors. This applies to Federal Acquisition Regulation (FAR) 12 commercial acquisitions as well. This contract shall in no way require persons to work in surroundings or under working conditions which are unsafe or dangerous to their health. The contractor must coordinate and perform work so as not to impact the safety of government employees or cause damage to government property. This requires providing personnel with protective equipment and associated http://www.osha.gov/pls/oshaweb/owasrch.search_form?p_doc_type=STANDARDS&p_toc_level=0 safety equipment as may be necessary. The contractor must also protect personnel from hazards generated by the work. If the contractor employs BILINGUAL speaking employees, they must post bilingual signs and have written procedures for specific tasks in applicable languages.
SECTION II – SPECIFIC REQUIREMENTS
The contractor’s prepared Safety Plan shall:
• Provide contact information for on-site personnel
• Include a work hazard analysis of the worksite and operations to be performed to include baseline hazard identification and required control measures
• Identify employee safety and health training requirements and the documentation process
The contractor shall ensure that each element identified below is adequately addressed in detail in the safety and health plan:
PEDESTRIAN CROSSWALKS: All contractor personnel are required to use the closest crosswalk, or traffic controlled intersection when crossing the road. Pedestrians must look both ways to ensure the coast is clear before stepping out into the crosswalk. Pedestrians DO NOT have the right of way unless they are already in the crosswalk. Contractor vehicle operators have the same responsibilities as pedestrians, to share the road and mutually observe and yield to pedestrians.
MOTOR VEHICLES: Contractor shall comply with the standards in: DoD Directive 5525.4, Enforcement of State Traffic Laws on DoD Installations", Nov 2, 1981, Para 3-4;
DODI 6055.4, DoD Traffic Safety Program, 20 Jul 99; AFI 91-207, USAF Traffic Safety Program, 22 May 07; Each applies to all persons at any time on an Air Force Installation and includes all leased, owned, or privatized property including housing areas. In addition:
AFI 13-213, Airfield Management, 29 Jan 08, Paragraphs 1.3.6 and 4.4.2.1 applies to all contractors, sub-contractors, vendors, commercial delivery companies, and all other private business vehicles who operate anywhere on Hill Air Force Base, including the airfield (to include the industrial areas and any buildings or hangars located upon the airfield) in support of their mission.
HOUSEKEEPING: Housekeeping shall be conducted according to the requirements in OSHA Standard 29 CFR 1910.141. CLEAN AS YOU GO will be enforced.
| 1 DESCRIPTION OF SERVICES |
| 2 BASIC SERVICES |
| 2.1 SERVICES GUIDELINES |
| 2.1.1 The contractor shall maintain and/or repair those instruments to ensure they operate within manufacturer’s standard product specifications. The repair shall conform to National Environmental Laboratory Accreditation Program (NELAP) certification... |
| 2.1.1.1 The contractor shall use only new, original equipment manufactured parts in making repairs. |
| 2.1.1.2 All replaced parts will be returned to the Government Representative (GR). |
| 2.1.1.2.1 Chem Flight 809 MXSS/MXDTAB |
| 2.2 NICOLET iS50 |
| 2.2.1 The contractor shall also provide one (1) Preventive Maintenance visit per year on listed items in Appendix B. This visit shall be scheduled by the contractor, but prior coordinated with the user. |
| 2.2.1.1 Maintenance shall include: changing the pump oil, aligning lenses and mirrors, ensuring operating software is updated, and ensuring sample mount is cleaned and aligned, and all other maintenance necessary to conform to OEM standards. |
| 2.2.2 On-site service within 72 hours from the time contractor is contacted and it is determined that on-site services is necessary. Unlimited number of service calls. |
| 2.2.3 The contractor shall provide the Government with a phone number for service calls. |
| 2.2.4 Maintenance and Repair Report, contractor shall provide reports on all maintenance and repair within five (5) business days of completion of work. (CDRL A001) |
| 3 SERVICE SUMMARY (SS) |
| 4 CDRL Summary |
| 5 Quality Assurance |
| 5.1.1 The government will periodically evaluate the contractor’s performance in accordance with the Quality Assurance Surveillance Plan (QASP). The government may inspect each task as completed and increase the number of quality assurance inspections... |
| 5.1.2 When an observation indicates defective contractor performance, the COR will require the contractor’s Contract Manager or representative at the site to initial the observation. The formal process is, when a performance threshold has not been me... |
| 5.2.1 Periodic Surveillance. This method requires the COR to employ a “spot check” style of evaluation based on the contractor’s services. Periodic surveillance will be conducted on a scheduled basis (daily, weekly, monthly, quarterly, semi-annual or ... |
| 5.2.2 Customer Complaints. The COR will receive and investigate all complaints. The COR will be responsible for validating customer complaints. The CO shall make final determination of the validity of customer complaint(s) in cases of disagreement wit... |
| 5.2.3 Review of Audits. COR reviews results of the contractor’s accepted quality management system audits and related quality metrics. |
| 5.2.4 100 Percent Inspection. This method requires the COR to do 100 percent inspection on all task performed. Appropriate for tasks that occur infrequently. Usually only deals with Safety and/or Security, unless mandated by an Air Force Instructio... |
| 5.3.1 The minutes of these meetings will be reduced to writing, signed by the CO and any other signatures as deemed appropriate, distributed to the functional area and the contractor. Should the contractor not concur with the minutes, the contractor w... |
| 5.4.1 Acquisition Team Meetings. The contractor’s Contact Manager (CM) with the CO, Contract Administrator (CA), COR, and other government personnel constitute an acquisition team [See FAR 1.102 (c)] and shall meet on a regular basis. The Acquisitio... |
| 6 ADDITIONAL REQUIREMENTS |
| 7 SECURITY: |
| 7.1.1 The contractor shall not assign to contract or task order performance any person, including any employee of the U.S. Government, if employing that person would create a conflict of interest under any law, regulation or policy of the United State... |
| 7.1.2 Contractors will not use any other form of identification to access any government installation or facility while working on a government contract except the issued credentials associated with the awarded contract or task order. Example: using... |
| 7.2.1 Contractor shall be escorted to the facility and 809 MXSS/MXDTAB will remain with the contractor until all work has been accomplished; security clearance will not be required. |
| 7.2.2 Access to the base is governed by military protocol. The contractor shall notify 809 MXSS/MXDTAB at least 1 day in advance of the planned arrival date and time and shall provide all required information for a Base Access Pass. |
| 7.2.3 Government telephones, computers, fax machines, copy machines, and other equipment shall be used only for official Government business |
| 7.2.4 Foreign nationals (FN) will not be escorted, or sponsored, onto the installation without being properly vetted. Any request must follow 309 MXSG OI 16-102, Security Requirements section 7. FNs must be approved for access via the Foreign Disclo... |
| 7.2.5 The contractor shall comply with all security, force protection, operation security and antiterrorism requirements at each installation. |
| 7.2.6 The contractor shall comply with 809 MXSS/MXDTAB in and out-processing procedures for all contractor personnel to ensure required security-related briefings and debriefings are accomplished. Specific in and out-processing checklists may be incl... |
| 7.2.7 The contractor will use the 809 MXSS/MXDTAB. as the primary means of reviewing and approving forms and for communicating with necessary government representatives. |
| 7.2.8 Communications Security |
| 7.2.8.1 All communications with DoD organizations are subject to Communications Security (COMSEC) review. |
| 7.2.8.2 The DoD authorizes the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. |
| 7.2.8.3 The Government advises the contractor that at any time they place a call to, or receive a call from, a DoD organization, they are subject to COMSEC procedures. |
| 7.2.8.4 The contractor assumes the responsibility for ensuring wide and frequent dissemination of the above information to all employees dealing with official DoD information. |
| 7.2.9 Operations Security (OPSEC) Requirements |
| 7.2.9.1 During the course of this contract, in addition to those restrictions, instructions and guidelines delineated in the PWS and/or other references provided, the contractor will adhere to the following minimum requirements. |
| 7.2.9.2 Introduction of personnel electronic devices into government spaces, laptops, tablet Personal Computers (PC)s, cellular phones, cameras, recording devices, and data recording/storage devices is strictly controlled and forbidden in most cases. ... |
| 7.2.9.3 Contractor personnel shall not discuss government operations in public or over unprotected or unencrypted communications. Official Business controlled unclassified information (CUI) may only be transmitted as directed in the PWS as it adheres... |
| 7.2.9.4 The Contractor shall not post to company websites, publications, newsletters, or other media any images, data or information that reveal sensitive government operations, personnel, equipment, and/or classified or CUI. When in doubt, company p... |
| 7.2.9.5 Contractor personnel shall not disclose to unauthorized third parties, post to unofficial sites (including all Social Networking sites) any images, data or information that reveals sensitive government operations, personnel, equipment, includi... |
| 7.2.9.6 Practice OPSEC and implement countermeasures to protect Critical Information (CI) and other sensitive unclassified information and activities vigilance or degrade the planning and execution of military operations performed or supported by the ... |
| 7.2.9.7 The contractor must mark and protect any information IAW CUI, to include E-mail, and adhere to all CUI standards and policies. |
| 7.2.9.8 Contractors who have access to the Ogden Air Logistics Complex (OO-ALC) and Government Servicing Units (GSU)s facilities or critical information shall have OPSEC training IAW AFI 10-701, Operations Security (OPSEC). Initial training will be a... |
| 7.3.1 All contractor management, staff and contractor personnel shall be clearly identified as such at ALL times. Contractor identification shall include visible badges, conversations, mail, email, teleconferences, video teleconferences, faxes, and/o... |
| 7.4.1 All contractors are required to in/out-process from each respective organization regardless of if they are issued a DBIDS or CAC. |
| 7.5.1 Should a security incident occur, the contractor shall: immediately report to the site location Group SM all available facts related to each instance, take such precautions as the SM may reasonably require for security purposes, take reasonable... |
| 7.6.1 809 Security Manager (SM), contractor and/or COR will administer and maintain all individual training and records, for compliance purposes, associated with this PWS. Training records must be made available during self-inspections and other over... |
| 7.6.2 Contractors may be required to complete the following trainings as applicable and administered electronically, whenever possible, or in-person: |
| 7.6.3 Training required for all personnel |
| 7.6.3.1 Operations Security (OPSEC) Awareness – Frequency: Initially upon assignment (within 30-days) and annually thereafter IAW AFI 10-701, Operations Security (OPSEC). Presentation/Means: Unit Security Manager or TSS Course #MHPSEC9800301BR. |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .