1423B001FATR.pdf

PDF 205 KB Posted

Attached to
MEMORY CARD, F-16 Federal contract opportunity
Solicitation number
FA821225Q0236
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This is a Contract Data Requirements List (CDRL DD Form 1423-1) for contract FD2020-25-00236 requiring a Test/Inspection Report (Data Item B001) for a "First Article Test Report" related to a Memory Card Persona system. The CDRL specifies that the contractor must submit test/inspection reports that include detailed manufacturing data, material certifications, processing requirements, and other technical information in accordance with DI-NDTI-80809B specifications.

Key delivery requirements include: reports must be submitted concurrently with First Article testing, distribution is limited to U.S. Government agencies under Distribution Statement B, and reports must be delivered both physically to Hill AFB, UT and electronically to a specified email address. The document contains export control warnings indicating the technical data is restricted under ITAR. The CDRL was prepared and approved on November 21, 2024 by the Air Force's 416 SCMS/GUEAA office at Hill AFB. The estimated total price is listed as $0.00 with NSP (Not Separately Priced) indicated in the price group field.

View the file

Other files for this federal contract opportunity

Other files attached to MEMORY CARD, F-16, newest first.
File Type Posted
FA821225Q0236 0001.pdf PDF
1423A001CPP.pdf PDF
SECTIONC.pdf PDF
158PACKAGEINGREQUIREMENTS.pdf PDF
FA821225Q0236.pdf PDF
ITEMDESCRIPTION.pdf PDF
ENGINEERINGDATALIST.pdf PDF
462ENGINEERINGDATAREQUIREMENTS.pdf PDF
QUALITYASSURANCE.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM: (Romania) E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY: (Data Manager) H. DATE I. APPROVED BY: (Engineer) J. DATE

Page of Pages

1102660737C Cross-Out

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

Page of Pages

DD FORM 1423-1, AUG 96

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor’s performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s right to use the data shall be governed by the pertinent provisions of the contract.

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4;

Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FD2020-20-00663 FAT 6150015559783WF
3rd page CDRL

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

Page of Pages

A_CONTRACT_LINE_ITEM_NO:

B_EXHIBIT:

xTDP: Off xTM: Off

OTHER:

DSYSTEMITEM:

E_CONTRACTPR_NO:

FCONTRACTOR:

16_REMARKS_Continued: s. Original drawings are not required. If applicable, reproducible stable base copies of unidimensional drawings and master pattern drawings are required. See Block 14.

Page2: 2 of_pages:

Reset:

xtm: Off
1_DATA_ITEM_NO: B001
2_TITLE_OF_DATA_ITEM: Test/Inspection Report
3_SUBTITLE: First Article Test Report
4_AUTHORITY_Data_Acquisit: DI-NDTI-80809B/T
5_CONTRACT_REFERENCE: CLIN for Data
6_REQUIRING_OFFICE: 416 SCMS/GUEAA
7_DID_250_REQ: SD
8_APP_CODE: N/A
DIST_STATEMENT: B
10_FREQUENCY: OTIME
11_AS_OF_DATE: SEE BLK 16
12_DATE_OF_FIRST_SUBMISSI: SEE BLK 16
13_DATE_OF_SUBSEQUENT_SUB: SEE BLK 16
addressee1: 416 SCMS/
draft1:
reg1: 1
repro1:
addressee2: GUEAA
draft2:
reg2:
repro2:
addressee3: 6070 Gum LN
draft3:
reg3:
repro3:
addressee4: Bldg. 1213
draft4:
reg4:
repro4:
addressee5: Hill AFB, UT
draft5:
reg5:
repro5:
addressee6: 84056-5825
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8: SEE BLK 16
draft8:
reg8: 1
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
reg38t: 2
total_repro: 0
16_REMARKS: NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the CO/ACO without further revision to this CDRL.

NSN: 7025-01-529-4119WF

1. Block 4: Contractor's format is acceptable. Paragraph 10.2 of DI-NDTI-80809B is clarified as follows:

a. All dimensions and tolerances specified on the manufacturing data shall be listed in one column, with the actual corresponding reading obtained from the inspection of the part listed in another column.

b. Materials utilized in the manufacture of "First Article" item shall be identified and certified along with a copy of material purchase requests as conforming to applicable data requirements.

c. Material processing, including finish requirements (plating, heat treatment, welding, inspecting, anodize, painting, etc.) utilized in the manufacture of "First Article" item shall be identified and certified as conforming to applicable requirements. A copy of the purchase order certifying the process accomplished at other than contractor facility shall be included.

d. Other requirements as called out on Engineering Data Requirement (HILL AFB Form 462).

2. Block 9: Distribution Statement and Export Control Warning shall be IAW DoD Instruction 5230.24.

The following Distribution Statement shall be placed on the first sheet of each document and/or Associated Lists.

DISTRIBUTION STATEMENT "B" Distribution authorized to U.S. Government agencies. (Test & Evaluation) (Nov 2024). Other requests for this document shall be referred to (416 SCMS/GUEAA, Hill AFB, UT 84056-5825).

17_PRICE_GROUP: NSP
ESTIMATED_TOTAL_PRICE: 0.00
G_PREPARED_BY:
H_DATE: 21 Nov 2024
1_APPROVED_BY:
J_DATE: 21 Nov 2024
Page: 1
2024-12-02T08:40:12-0700
PINNEGAR.STEPHANIE.A.1102660737
2024-12-02T09:26:28-0700
MEREDITH.JAIME.MICHAEL.1516627502
A_CONTRACT_LINE_ITEM_NO:
B_EXHIBIT: B
xTDP: Off
xTM: Off
OTHER: NDTI
DSYSTEMITEM: Memory Card Persona
E_CONTRACTPR_NO: FD2020-25-00236
FCONTRACTOR:
16_REMARKS_Continued: EXPORT CONTROL WARNING: All printed and electronic, including digital, technical documents that are determined to contain export-controlled technical data shall be marked with the following statement:

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

3. Blocks 10, 11, 12, 13, 14:

a. For Government Testing - Report to assist in "First Article" testing by the Air Force shall be submitted concurrently with the "First Article" item either in the packaging of the shipping container or separately if the report will not fit within the container packaging unfolded. When shipped in the "First Article" container, the report shall be enclosed in a paper or plastic envelope.

b. SHIP TO: Non-Accountable Bay Transportation Officer Building 849 West Hill AFB, UT 84056-5999

MARK FOR: 809 MXSS/MXDEB

7278 4th Street (Bldg. 100, Bay D) Hill AFB, UT 84056-5205

NOTE: If report is shipped separate from "First Article" item, send report to "MARK FOR" address listed above.

c. Contractor shall deliver the Test/Inspection Report via e-mail to the following e-mail address: jaime.meredith@us.af.mil

Page2: 2
of_pages: 2
Reset:

File details come from the government source that posted it. Updated .