140R6024R0007_Amendment_No__0001_0001.pdf
PDF 368 KB Posted
- Attached to
- Angostura Dam Spillway Repair
- Solicitation number
- 140R6024R0007
About this file
This document is an Amendment to Solicitation No. 140R6024R0007 for the Angostura Dam Spillway Concrete Repair project under the Pick-Sloan Missouri Basin Program in South Dakota.
The amendment provides details on the organized site visit that took place on June 4, 2024, including a list of the contractors and Bureau of Reclamation personnel in attendance. It also extends the date for receipt of proposals to July 26, 2024 at 3:00 PM Mountain Daylight Time. The amendment requires acknowledgement from offerors and states that responses to questions from the site visit will be provided in a forthcoming amendment. The overall contract is for the repair of the Angostura Dam Spillway and is being solicited by the Bureau of Reclamation, a civilian agency within the Department of the Interior.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1
1. CONTRACT ID CODE
I
PAGE OF PAGES
1 I 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
6. ISSUED BY
06/18/2024 CODE R60 7. ADMINISTERED BY (If other than Item 6) CODE I
Bureau of Reclamation Missouri Basin Region
Regional Office
2021 4th Avenue North
Billings MT 59101
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
9A. AMENDMENT OF SOLICITATION NO .
140R6024R0007
X
9B. DATED (SEE ITEM 11)
05/09/2024
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
� The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers � is extended. Dis not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment. and is received prior to the opening hour and dale specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor Dis not Dis required to sign this document and return _______ _ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Angostura Dam Spillway Concrete Repair, Pick-Sloan Missouri Basin Program, South Dakota
Please see the following continuation pages for details of this amendment.
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 1 0A, as heretofore changed, remains unchanged and in full force and effect .
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED
(Signature of person authorized to sign)
Previous edition unusable
Darlene Dillon
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Solicitation No. 140R6024R0007 Amendment No. 0001
Description of amendment details:
1) For informational purposes only, this amendment hereby provides a list of attendees to the organized site visit, which took place at the Angostura Dam, South Dakota, June 4, 2024, at 12:00/noon (MDT-Denver).
Note: Responses to questions will be provided in a forthcoming amendment.
Acknowledgement: See Block 11 above regarding acknowledgement by offerors to this amendment. The Government requires acknowledgement of this amendment. (Please See Block 19 of the Standard Form 1442, on the original solicitation, ACKNOWLEDGEMENT OF
AMENDMENTS).
Receipt of Proposals: The date for receipt of proposals is extended to July 26, 2024. The hour of receipt of proposals is 3:00 PM (Mountain Daylight Time-Denver).
Third Party: If you have provided a copy of this solicitation to another company or person, please forward this amendment accordingly.
FOR INFORMATIONAL PURPOSES ONLY: The following list of contractors and persons who attended the organized site visit at the Angostura Dam, South Dakota, which took place June 4, 2024, 12:00/noon (MDT-Denver), are provided to assist in facilitating coordination of sub-contractors and suppliers with those in attendance:
Organized Site Visit – Solicitation No. 140R6024R0007 – Angostura Dam Spillway Concrete Repair June 4, 2024
(Contractor Attendees)
Company Phone Number Email
Tepa Companies 719-243-1482 Steve.Blystone@Tepa.com
PCi Roads LLC 612-240-7428 david.graham@pciroads.com
Michels 510-207-4560 lolsen@michels.us wschetter@michels.us
Miami Federal 360-609-6448 609-232-4425 jlong@mn-e.com hbrown@mn-e.com
Tribal One/Structural 407-416-4575 303-619-3482 dhancock@structural.net jcastro@structural.net
Beartooth Water Jetting 406-498-4141 pat@btwjetting.com brittany@btwjetting.com
RJS Construction, Inc. 509-490-0122 stangilmore@RJSCONST.com
HPM Contracting 720-636-1831 dan.duche@hpmcontracting.com
Complete Concrete, Inc. 605-388-0111 r.danielson@ccisd.biz
Lacreek Development Corp 605-685-6499 chrisobryan@lacreekdevelopment.com
ASI Construction, LLC 719-207-0710 jbowen@asidams.com
Crack Enterprises 605-877-1590 casey.cvach@cvachenterprises.com
Custom Concrete 605-209-6600 605-209-3066 cutting@cccsouthdakota.com
Solicitation No. 140R6024R0007 Amendment No. 0001
Organized Site Visit – Solicitation No. 140R6024R0007 – Angostura Dam Spillway Concrete Repair June 4, 2024
(Bureau of Reclamation Attendees)
Travis Stephens, Supervisory Contracting Officer
801-524-3613 tjstephens@usbr.gov
Steven Fritch, Contracting Officer’s Representative
(COR)
605-519-5419 sfritch@usbr.gov
File details come from the government source that posted it. Updated .