GRN_MTN__amendment_4.pdf

PDF 334 KB Posted

Attached to
EC-RAX 4158 GREEN MTN PENSTOCK REHAB
Solicitation number
140R6018R0004
Issued by

View the file

Other files

File Type Posted
Amendment_0003_DESCRIPTION_OF_CHANGES.pdf PDF
Amendment_2.pdf PDF
140R6018R0004__Amendment_0001.pdf PDF
16.__Solicitation_GRN_MTN__May__29__2018.pdf PDF
FedConnect File —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140R6018R0004 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Billings MT 59107

R60

PO Box 36900 Regional Office Great Plains Region Bureau of Reclamation

07/20/20180004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/29/2018

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Green Mountain Powerplant Penstock Rehabilitation, Colorado Big Thompson Project, Colorado

See Page 2 for changes incorporated in this amendment.

Legacy Doc #: BOR

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Paris Everson

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment 0004 Solicitation 140R6018R0004

____________________________________________________________________ Page 2 of 4

I. DESCRIPTION OF CHANGES:

Note: Targeted changes have a vertical line next to specification and/or clauses.

SECTION 35 22 25 – JET FLOW GATE

a. Remove pages 35 22 25 - 9 and 35 22 25 - 10 in their entirety and therefor insert Revised page 35 22 25 - 9 and Revised 35 22 25 - 10.

SECTION 09 96 20 – COATINGS

a. Remove Section 09 96 20 in its entirety and therefor insert Revised Section 09 96 20.

SECTION 09 97 02 – IMPACTED IMMERSION COATINGS:

a. Remove SECTION 09 97 02 in its entirety and therefor insert Revised SECTION 09 97 02

II. QUESTIONS AND ANSWERS:

Question 25.

Question: Specifications Section 352225, Paragraph 3.01 B calls for modification and reuse of existing floor grating and supports. Specifications Section 055000, Paragraph 1.01.A.b calls for removal and disposal of the grating, beam and connection components. Please confirm which specifications section is correct.

Answer 25.

Specifications Section 055000 is correct. Reference revised specifications Section 352225 included with this amendment. [This revised specification Section did not get included in Amendment No. 0003 – it is hereby included in Amendment No. 0004]

Question 26.

Question: Specifications Section 352225 Requires the wall gland to be disassembled and reassembled.

No mention is made of replacing the rubber gasket material (parts 11 and 12 drawing 245-D-1089). Has this material been replaced recently? If it has not, there is a probability that the joints will leak. In reviewing the asbestos report, I was unable to determine if the gasket material was tested and determined to contain asbestos. Could you please verify.

Answer 26.

See Section 352196 for replacement of packing material. Wall gland replacement is covered in Section 352196. See Paragraph 3.01 A. for sampling and testing existing packing material to be performed by the Contractor. No testing of this material was performed by the Government. See Paragraph 2.01 D. for new wall gland material requirements.

Question 27.

Question: Specifications Section 09 97 02, Paragraph 3.07 C and Section 09 96 20, Paragraph

3.07 C; requires that the Coating Quality Control Manager cannot be the same person as the Coatings Inspector. What requirements or qualifications are required for the Coating Inspector?

Since there will be two individuals and since there will be a Coating Inspector, is it required that

____________________________________________________________________ Page 2 of 4 the Coating Quality Control Manager be onsite at all times during coating work? If not, how often will they need to be onsite, and/or can they manage the QC remotely?

Answer 27.

See revised specifications Section 099702 and revised specifications Section 099702 for a clarification of Coating Inspector and Coating Quality Control Manager qualifications and responsibilities.

Question 28.

Question: Specifications Section 09 97 02, Paragraph 1.03 D, 3; requires that the Coating Quality Control Manager have a NACE Level 3 certification and requires someone with no less than 5 years of experience of projects applying vinyl coatings of similar size and complexity. Could the BOR change that requirement? Vinyl coatings are not used outside of federal projects, usually USACE dam projects are where vinyl coating applications are seen. State, County, City, and Utility companies do not use these systems due to the high VOC’s. Based on that type of structure, will the BOR consider above ground dam gates similar in complexity to the confined space below ground interior surface of a penstock? Based on these requirements, it looks like it could be very difficult to find someone who will meet the specifications.

Answer 28.

BOR will consider experience in projects applying vinyl coatings on above ground dam gates to be similar to the confined space below ground interior surface of a penstock. Projects shall be of similar size and complexity.

Question 29.

Question: Specifications Section 09 97 02, Paragraph 1.03 D, 2; requires current Coating Applicator Specialist (CAS) and experience on 3 jobs applying vinyl coatings to structures of similar size and complexity. Could the BOR change that requirement? Vinyl coatings are not used outside of federal projects, usually USACE dam projects are where vinyl coating applications are seen. State, County, City, and Utility companies do not use these systems due to the high VOC’s. Based on that type of structure, will the BOR consider above ground dam gates similar in complexity to the confined space below ground interior surface of a penstock? Based on these requirements, it looks like it could be very difficult to find CAS’s who will meet the specifications.

Answer 29.

BOR will consider experience in projects applying vinyl coatings on above ground dam gates to be similar to the confined space below ground interior surface of a penstock. Projects shall be of similar size and complexity.

Question 30.

Question: Specifications Section 01 35 30, Paragraph 1.06 B; requires an Onsite CIH. Will the contractor be required to have a full time CIH onsite at all times during the coatings work?

Specifications Section 01 35 30, Paragraph 1.05 B, 1, c, 3); indicates a CIH is required at the start-up and a minimum of one time per week. Could the BOR verify that is what will be required for the “Onsite CIH.”

____________________________________________________________________ Page 2 of 4

Answer 30.

See specifications Section 013530, Paragraph 1.05 B.1.b 3) for CIH work on Asbestos Hazard Abatement, and Section 013530-2, Paragraph 1.05 B.1.c 3) for CIH work on coating removal and application.

Question 31.

Question: Specifications Section 01 35 30, Paragraph 1.04 A; states that the Contractor shall identify a full-time Onsite Safety and Health Professional that is acceptable to Reclamation.

What experience, qualifications, and certifications will be required to be acceptable?

Answer 31.

See specifications Section 013530, Paragraph 1.04 A. 3.

Green Mountain Powerplant Penstock Rehabilitation Amendment No. 004 Colorado Big Thompson Project, Colorado Solicitation No. 140R6018R0004

Jet-Flow Gate

Revised 35 22 25 - 9

e. During the test, measure leakage past the seal. Leakage shall not exceed 1/4 gallon per minute. If necessary, make repairs to meet the leakage requirements.

f. Record actual leakage observed and submit results under RSN 35 22 25-5.

5. Ream flanges for taper pins with body joints aligned after shop tests so that the motor operator stem is in perfect alignment when the leaf is in contact with the seating surfaces of the seats in the downstream body as described above.

2.09 DELIVERY, STORAGE, AND HANDLING

A. Ship gate as an assembled unit with bonnet cover and operator attached.

B. Box or crate all loose parts.

C. Properly support and secure gate during transport and storage.

D. Store major parts of gate with operator on timber blocking, and provide adequate covers to protect gate, operator, and associated equipment from weather and damage.

PART 3 EXECUTION

3.01 REMOVAL OF EXISTING EQUIPMENT

A. Disassemble tube valve operator and remove operator and drive linkage.

B. Remove and dispose of existing floor grate assemblies in accordance with Section 05 50 00 – Metal Fabrications.

C. Disconnect and disassemble existing downstream wall gland from tube valve. Set aside and protect from damage for later re-use.

D. Disconnect tube valve plumbing and appurtenances. Disconnect and remove tube valve.

This equipment shall become the property of the Contractor and shall be removed from site.

3.02 INSTALLATION

A. Include in installation of gate: proper alignment and bolting of gate to existing pipe flange and hood and touch-up painting as required.

B. Disassemble the gate as necessary for handling and to install the gate through the control house. With the operator, bonnet cover, leaf, and attached parts removed, the remaining gate is estimated to weigh 10,000 pounds however it is the Contractor’s responsibility to accurately weigh the parts to be lifted to ensure that they do not exceed the maximum safe handling weight of hoisting equipment used.

Jet-Flow Gate

Revised 35 22 25 - 10

C. Use new gaskets in any joints disconnected. Wipe all bronze, brass, and stainless steel surfaces clean of dirt and foreign matter prior to installation. Take special care to avoid contaminating stainless steel surfaces with carbon steel. Do not use steel wool or wire brushes made of carbon steel for cleaning stainless steel. Protect stainless steel surfaces at all times against weld spatter, iron particles, or being splattered by carbon steel, as presence of carbon steel on surface of stainless steel will impair corrosion resistance.

D. Grease Piping:

1. Install and fill grease piping with grease using grease pump.

2. Test grease piping to 500 pounds per square inch with test plugs installed in the seats. Remove plugs after pressure test.

3. Check lines to verify that grease is being delivered at seats.

E. Anchorage:

1. Install gate stands and align as shown on the drawing.

2. Grout underneath support with non-shrink grout.

F. Re-assemble the leaf, bonnet cover, operator, stem nuts and all appurtenant parts. Use gasket sealant compound suitable for use with oil and water on the bonnet cover-to-gate body joint. Install lead plugs, 28, and set screw, 27, in the stem nuts, 9 and 10, and torque to 20 foot-pounds.

G. Install pipe spools.

H. Install the previously removed downstream wall gland.

I. Install floor grate assemblies.

J. Electrically connect the motor operator using flexible liquid-tight conduit and new conductors per manufacturer’s recommendations.

K. Lubricate stem and motor operator in accordance with manufacturer’s instructions.

3.03 FIELD QUALITY CONTROL

A. Government Inspector will witness all tests, unless otherwise directed.

B. Test after gate with operator has been installed.

1. Operational Test:

a. Lubricate seats at assembly with grease equal to Mobil SHC Aware Grease EP 2, Lubriplate Bio based EP 2, or Hydrosafe 180 EP.

Lubricate operator stem threads as recommended by the manufacturer.

Coatings

Revised 09 96 20 - 1

SECTION 09 96 20

COATINGS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. General:

1. Payment for various items to be recoated includes the following costs:

a. Containment, safety, and health activities for coatings work.

b. Coating removal, handling, and disposal, including abrasive disposal.

c. Surface preparation, such as abrasive blasting, cleaning, and grinding.

d. Coating application and remedial work.

B. Blast and Recoat Exterior Coated Surfaces of Unit 1 and Unit 2 Penstock and Associated Metalwork:

1. Measurement: Surface area blasted and recoated.

2. Payment: Square foot price offered in the Price Schedule.

C. Blast and Recoat Exterior Surfaces of Unit 1 and Unit 2 Scroll Case and Draft Tube Man- Door:

1. Measurement: Surface area blasted and recoated.

2. Payment: Square foot price offered in the Price Schedule.

D. Cost:

1. Include cost of weld repair during surface preparation in applicable square inch prices offered in the Price Schedule for Weld Repair during Surface Preparation of Penstock, Outlet Tube, Scroll Case, and Draft Tube for Unit 1 and Weld Repair during Surface Preparation of Penstock, Outlet Tube, Scroll Case, and Draft Tube for Unit 2.

a. Does not include runner repair. Refer to Section 48 13 10 – Vertical Francis Turbine Runner Repair.

2. Include cost of coating complete electrical system equipment and materials in lump sum price offered in the Price Schedule for Complete Electrical System.

3. Include cost of coating interior and exterior surfaces of new 3-inch diameter steel vent piping in linear foot price offered in the Price Schedule for Furnish and Install Lined and Coated 3-Inch Steel Penstock Vent Piping.

4. Include cost of coating air vent piping supports in applicable linear foot prices offered in the Price Schedule for Furnish and Install Lined and Coated 14-Inch

Revised 09 96 20 - 2

Steel Vent Piping for Unit 1, Furnish and Install Lined and Coated 14-Inch Steel Vent Piping for Unit 2, and Furnish and Install Lined and Coated 3-Inch Steel Penstock Vent Piping.

5. Include cost of coating motor operator and appurtenant equipment for 40-inch jet-flow gate in applicable lump sum prices offered in the Price Schedule for Jet-Flow Gate for Unit 1 and Jet-Flow Gate for Unit 2.

6. Include cost of coating air valve assembly and drain valves in lump sum price offered in the Price Schedule for Furnish Steel Pipe for Air Valve Assembly and Drain Valves.

1.02 REFERENCE STANDARDS

A. ASTM International (ASTM)

1. ASTM A380-13 Cleaning, Descaling, and Passivation of Stainless Steel Parts, Equipment, and Systems

2. ASTM A780-09(2015) Repair of Damaged and Uncoated Areas of Hot Dip Galvanized Coatings

3. ASTM C920-14a Elastomeric Joint Sealants

4. ASTM D2794-93(2010) Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact)

5. ASTM D4060-14 Abrasion Resistance of Organic Coatings by the Taber Abraser

6. ASTM D4285-83(2012) Indicating Oil or Water in Compressed Air

7. ASTM D4541-09 Pull-Off Strength of Coatings Using Portable Adhesion Testers

8. ASTM D5894-10 Cyclic Salt Fog/UV Exposure of painted Metal, (Alternating Exposures in a Fog/Dry Cabinet and a UV/Condensation Cabinet)

B. American Welding Society (AWS)

1. AWS D1.1/D1.1M - 15 Structural Welding Code

C. American Water Works Association (AWWA)

1. AWWA C206-11 Field Welding of Steel Water Pipe

D. International Organization For Standardization (ISO)

1. ISO 8502-3-1992 Assessment of dust on Steel Surface Prepared for Painting (Pressure-Sensitive Tape Method)

Revised 09 96 20 - 3

E. The Society for Protective Coatings (SSPC)/NACE International (NACE)

1. SSPC-AB1-15 Mineral and Slag Abrasives

2. SSPC-AB2-15 Cleanliness of Recycled Ferrous Metallic Abrasives

3. SSPC-AB3-04 Newly Manufactured or Re-Manufactured Steel Abrasives

4. SSPC-Guide 15-13 Field Methods for Retrieval and Analysis of Soluble Salts on Substrates and Other Nonporous Substrates

5. SSPC-PA1-04 Shop, Field, and Maintenance Painting of Steel

6. SSPC-PA2-15 Measurement of Dry Paint Thickness with Magnetic Gages

7. SSPC-QP1-15 Evaluating Painting Contractors (Field Application to Complex Industrial Structures)

8. SSPC-QP2-09 Evaluating Painting Contractors (Field Removal of Hazardous Coatings From Complex Industrial Structures)

9. SSPC-QP3-10 Evaluating the Qualification of Shop Painting Contractors

10. SSPC-SP1-15 Solvent Cleaning

11. SSPC-SP3-04 Power Tool Cleaning

12. SSPC-SP7/NACE 4-07 Brush-Off Blast Cleaning

13. SSPC-SP10/NACE 2-07 Near-White Blast Cleaning

14. SSPC-SP11-13 Power Tool Cleaning to Bare Metal

15. SSPC-VIS1-02 Guide and Reference Photographs for Steel Surfaces Prepared by Abrasive Blast Cleaning

16. SSPC-VIS3-04 Visual Standard for Power- and Hand-Tool Cleaned Steel

17. NACE RP 0287-02 Field Measurement of Surface Profile of Abrasive Blast Cleaned Steel Surfaces Using a Replica Tape

18. NACE SP 0188-06 Discontinuity (Holiday) Testing of New Protective Coatings on Conductive Substrates

Revised 09 96 20 - 4

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 09 96 20-1, Approval Data:

1. For each coating material:

a. Manufacturer’s product data, application, and SDS sheets.

b. Supplier’s name, address, and phone number.

c. Identification of “Items to be coated” including sub-letter and sub-number listed in Coating Tabulations.

2. For each caulk and filler:

a. Manufacturer’s product data, application, and SDS sheets.

b. Supplier’s name, address, and phone number.

c. Identification of areas of use including sub-letter and sub-number listed in Coating Tabulations.

3. For each substituted coating material “equal” to specified product in Coating Tabulation:

a. List of not less than 3 successful material applications of similar size and complexity:

1) Project name, location, type of structure, and application dates.

2) Owner’s name, address, and telephone number.

b. Certification that material meets or exceeds specified requirements:

1) Manufacturer’s certification including technical representative’s signature and date of signature.

2) Independent laboratory’s certified test reports.

C. RSN 09 96 20-2, Final Approval Data:

1. For each coating material and thinner:

a. Purchase orders including order number, date, manufacturer’s designated product name, batch number(s) (excluding thinner), and quantity purchased.

D. RSN 09 96 20-3, Qualifications:

1. Coating Contractor:

a. Current SSPC-QP1 and SSPC-QP2 for field coating operations.

b. Current SSPC-QP3 certification for shop coating operations.

2. Coating Applicator:

Revised 09 96 20 - 5

a. Current Coating Application Specialist (CAS) or Plural Component Application Certification (PCAC).

b. Resume to include list of not less than 3 jobs of similar size and complexity, including owner’s name, address, and telephone number, for each coating type.

3. Coating Quality Control Manager:

a. Current Level 3 certification for NACE Certified Coatings Inspector (CIP) or SSPC Protective Coatings Inspector (PCI).

b. Resume to include a list of not less than 5 years of jobs of similar size and complexity to that required of this contract, including owner’s name, address, and telephone number, for each coating type.

4. Coating Inspector:

a. Current Level 1 minimum certification for NACE Certified Coatings Inspector (CIP) or SSPC Protective Coatings Inspector (PCI).

b. Resume to include a list of not less than 2 years of jobs similar size and complexity to that required of this contract, including owner’s name, address, and telephone number, for each coating type.

E. RSN 09 96 20-4, Quality Control Plan:

1. Quality Control Procedure:

a. Quality control plan.

b. Procedure for addressing identified non-conformities.

F. RSN 09 96 20-5, Contractor Quality Testing Report:

1. Comprehensive report of daily quality control test reports.

1.04 DELIVERY, STORAGE, HANDLING

A. Deliver materials to jobsite in original, undamaged, unopened containers labeled with manufacturer’s name, designated product name, batch number, date of manufacture, and any special instructions.

B. Deliver materials in containers not larger than 5 gallons as packaged by manufacturer unless suitable equipment is provided at jobsite to handle and thoroughly mix materials in larger containers.

C. Store coating materials and thinners in accordance with the manufacturer's recommendations, and as a minimum, store off the ground, under cover, and at 50 to 95 degrees F.

D. Do not use coating material which has exceeded manufacturer’s specified storage stability period (shelf life).

Revised 09 96 20 - 6

1.05 AMBIENT CONDITIONS

A. Maintain environmental conditions to meet coating manufacturer’s requirements during surface preparation, coating application, and curing period. Provide heating or cooling, and dehumidification as needed. Complete curing before placing the coating systems into service.

B. Coatings shall be applied when the substrate surface temperature is 5 degrees F or more above the dew point temperature and for at least 8 hours after application.

1.06 PROJECT CONDITIONS

A. Existing coatings may contain hazardous materials. Refer to Section 02 83 20 – Removal and Disposal of Coatings and Equipment with Coatings Containing Hazardous Materials.

B. Existing packing materials associated with expansion joint and tube valve wall gland may contain hazardous materials. Refer to Section 02 82 20 – Removal and Disposal of Asbestos Containing Materials.

C. Water control required within penstock, penstock gallery, and draft tube. See Section 02 70 10 – Removal and Control of Water.

D. Powerplant contains equipment that is sensitive to dust and other airborne particulates or solvents, requiring ventilation of surface preparation and coating activities by means other than through the powerplant.

E. Steel substrates may contain pitting that requires welding prior to coating.

1. Excludes Section 48 13 10 – Vertical Francis Turbine Runner Repair.

PART 2 PRODUCTS

2.01 EQUIPMENT

A. Surface Preparation and Spray Application Equipment:

1. Sized in accordance with coating manufacturer’s recommendations.

2. Provide:

a. Pressure gauges and pressure regulators.

b. Air supply lines free from oil and moisture.

2.02 ABRASIVES

A. Mineral and Slag Abrasives: Meets SSPC-AB1, type I (natural minerals) and type II (slags), class A.

B. SSPC-AB2 for recycled cleanliness.

Revised 09 96 20 - 7

C. SSPC-AB3 Class I (steel) or II (iron) for angular shaped grit. Shot abrasives are not acceptable.

D. Commercially available products or processes to render the hazardous waste stream non-hazardous and not exceeding toxicity threshold limits.

2.03 COATINGS

A. Specified in Coating Tabulations:

1. Apply only one coating system per option in Coating Tabulations.

2. Apply compatible products of same manufacturer for coating system components.

B. Volatile Organic Compounds (VOC): Do not exceed maximum permitted by Federal, State, and local air pollution control regulations as supplied in container or by addition of thinner material.

C. Factory color or tint only. Do not color or tint at jobsite.

D. Use manufacturer’s recommended thinners for coating materials.

E. Do not use accelerator products unless approved by COR.

2.04 FILLERS AND CAULKS

A. Caulks:

1. Coating manufacturer’s standard or compatible caulk material.

2. Polyurethane, Silicone, or Silicone Acrylic Caulk Material: Meets or exceeds ASTM C920 type S or M, grade NS, class 25, suitable for water immersion service.

B. Fillers:

1. Carboguard 501, as manufactured by Carboline, www.carboline.com.

2. Devmat 142HB, as manufactured by International Paint, www.international-pc.com.

3. PPG Amercoat 114 A, as manufactured by PPG, www.ppgpmc.com.

4. Steel Seam FT910, as manufactured by Sherwin Williams, www.sherwin-williams.com.

5. Provide one of the above fillers, or equal with following essential characteristics:

a. Coating manufacturer’s standard filler material.

b. Approved use by manufacturer.

Revised 09 96 20 - 8

2.05 MISCELLANEOUS MATERIALS

A. Deionized Water.

B. Chlor-Rid as manufactured by Chlor-Rid, www.Chlorid.com.

C. HoldTight 102 as manufactured by Holdtight Solutions, www.holdtight.com.

D. Chlor-Gone, as manufactured by Aquron, www.aquron.com.

E. Provide one of the above salt removers, or equal with following essential characteristics:

1. Commercially available additive for soluble salt removal;

2. Water soluble.

3. Biodegradable.

4. Zero VOCs.

PART 3 EXECUTION

3.01 PROTECTION OF ADJACENT SURFACES, EQUIPMENT

A. Remove, mask, or otherwise protect items or surfaces not coated from contamination and damage during cleaning and coating operations.

B. Examples include protecting mating and machined surfaces, mechanical and electrical equipment (open or enclosed), instruction and similar plates, and wet and newly coated surfaces.

3.02 COATING OF METALWORK EMBEDDED IN CONCRETE

A. For ferrous surfaces embedded in new concrete placements:

1. For atmospheric exposure on both sides of concrete or when mechanical bond is needed:

a. Extend primer coats 6 inches, minimum, into concrete embedment measured from face of concrete and along surface of embedded concrete faces. Examples include: above ground thrust or anchor blocks, floors, and walls with pipe or metal passing through the concrete.

2. For burial or immersion service exposure on either side of concrete faces:

a. Extend primer coat continuously through solid concrete structure.

Examples include: sill plates, anchor plates.

B. For ferrous surfaces with existing concrete-steel interfaces:

1. Coat all concrete-steel interfaces 6 inches onto concrete surface.

Revised 09 96 20 - 9

C. Caulk the concrete/steel interface to seal gaps at exposed faces in accordance with manufacturer’s instructions with maximum thickness of 1/2-inch.

3.03 SURFACE PREPARATION

A. Remove or repair surface irregularities and impart profile as specified:

1. Welds:

a. Welds: Smooth and continuous.

b. Weld spatter, slag, buckshot, laminations, and slivers: Remove and grind smooth.

c. Undercuts and porosity: Fill with weld material and grind smooth.

d. Projections, sharp edges, high points, fillets, and corners: Grind smooth to a radius of at least 1/16-inch.

2. Substrate Defects:

a. Pitting, gouges, scratches, porosity, and similar:

1) Grind smooth.

2) Repair defects exceeding 3/8-inch in depth as measured by pit gauge in accordance with AWWA C206 and AWS D1.1.

3. Grind full length of edges and corners smooth to a radius of at least 1/16-inch.

B. Surface Preparation Method:

1. See Coating Tabulations.

2. Compare prepared steel surfaces to following visual reference photographs for allowable visible contaminants and stains:

a. SSPC-VIS1 for abrasive blast cleaning.

b. SSPC-VIS3 for power and hand tool cleaning.

3. Assessment of Dust Contaminants:

a. Perform clear tape test method in accordance with ISO 8502-3.

b. Perform three tests per shift.

c. Acceptance Criteria: Degree of cleanliness shall meet Class 2.

C. Surface Profile:

1. Prepare as specified in Coating Tabulations.

2. Where not specified, prepare in accordance with manufacturer’s instructions for metallic substrates or existing coating surfaces and service environment.

3. Where manufacturer’s instructions do not specify a surface profile, prepare blasted surfaces to following profile:

Revised 09 96 20 - 10

a. Atmospheric Service Environments: 1 mil or greater angular profile and less than specified millage of first applied coat.

b. Burial and Immersion Service Environments: Angular profile 2 mil or greater and less than specified millage of first applied coat.

4. Inspect surface profile in accordance with NACE RP 0287:

a. Use replica tape suitable for surface profile depth range.

b. Perform at least two tests per 1,000 square feet.

D. Soluble Salts:

1. Measure concentration of chlorides, nitrates, and sulfates in accordance with SSPC Guide 15.

2. Perform at least two tests per 1,000 square feet of surface area. Include corrosion pit areas.

3. Acceptance criteria: Do not exceed 3 micrograms per square centimeter for chlorides and 5 micrograms per square centimeter for nitrates and sulfates.

E. Re-clean or perform additional surface preparation of contaminated surfaces before coating application.

3.04 COMPRESSED AIR EQUIPMENT

A. Keep air compressor and spray application equipment lines free of oil and moisture during work.

B. Compressed Air Quality:

1. Perform tests in accordance with ASTM D4285.

2. Perform test at the beginning of every shift.

3.05 FILLERS AND CAULK APPLICATION

A. Caulk areas including crevices, gaps, plate seams, skip welds, and conduit penetrations.

B. Fill areas including prepared pits, cavitation, and/or porosity, plate seams, and gaps at bolts and rivets as requested by COR.

C. Apply in a uniform texture, neatness, and color matched appearance.

D. Apply in accordance with manufacturer’s instructions and achieve tight bond to substrate or previous coats.

3.06 COATING APPLICATION

A. Stripe Coat:

Revised 09 96 20 - 11

1. Brush apply stripe coat.

2. Apply stripe coat prior to spray application of the primer, when practical.

3. Apply to edges, corners, interior angles, pits, plate seams, crevices, rivets, nuts, threads, bolts, washers, welds, and similar features.

B. Apply number of coats and coating thickness specified in Coating Tabulations.

1. Alternate coat colors to differentiate between coats.

2. Apply in accordance with manufacturer’s instructions.

3. Apply in accordance with SSPC-PA1.

C. Prevent overspray or dry spray. When such conditions occur, clean surfaces prior to application of subsequent coats.

D. Re-clean contaminated surfaces between coats.

E. Dry Film Thickness (DFT):

1. After each coat, inspect hardened coating system for DFT compliance in accordance with SSPC-PA2.

2. Acceptance Criteria: no single spot measurement less than 80 percent of specified minimum.

F. Discontinuity (Holiday) Testing:

1. Inspect interior pipe coatings in accordance with NACE SP 0188:

a. Use maximum test voltage for any DFT as recommended by coating manufacturer to prevent coating damage.

G. Coating Adhesion:

1. Test in accordance with ASTM D4541 at the request of the COR.

3.07 CONTRACTOR FIELD QUALITY TESTING

A. Inspection Equipment:

1. Calibrate inspection devices and equipment in accordance with the manufacturer’s instructions.

2. Verify calibration prior to every use.

B. Coating Inspector:

1. Conduct tests in presence of the COR.

2. Prepare Daily Reports to include:

a. Date of work.

Revised 09 96 20 - 12

b. Description of areas and work performed.

c. Environmental conditions.

d. Results from the following quality control tests:

1) Soluble salt.

2) Surface profile.

3) Visual comparison of prepared surfaces.

4) Assessment of dust contaminants.

5) Compressed air quality.

6) Dry film thickness (DFT).

7) Discontinuity (Holiday) testing.

8) Coating adhesion testing (when requested by the COR).

3. Provide rigging for COR to observe inspections.

4. Shall not be the same individual who performed the work being inspected.

5. Shall not have other duties in the project except as identified in 3.07 C.

6. Shall be on site during all coating operations.

C. Coating Quality Control Manager:

1. The Coating Quality Control Manager may serve as the coating inspector.

2. Review and sign Daily Reports for review by the COR.

3. Visit the site during start-up of coating activities until means and methods provide acceptable test results confirming that the work is being performed in accordance with specified requirements.

D. Final inspection will take place after repairs, but before placing into service.

3.08 REPAIR AND REMEDIAL WORK

A. Repair defective or damaged areas of coatings in accordance with coating manufacturer’s recommendations.

B. Where manufacturer’s instructions do not specify a coating repair procedure, repair defective or damaged coated areas in accordance with the following:

1. For metal substrate:

a. SSPC-SP10/NACE 2.

b. SSPC-SP11 where abrasive blasting is impractical.

2. For surrounding intact coating (nominal 2 to 4 inch margin):

a. SSPC-SP1.

Revised 09 96 20 - 13

b. Feather abrupt edges and around repair area by hand or power tool with non-woven pad into adjacent tightly bonded coatings.

c. Roughen or abrade surface in accordance with manufacturer’s recommendations to achieve matted or lusterless finish.

d. SSPC-SP1.

C. Repair damaged equipment or surfaces as requested by the COR.

3.09 PROTECTION OF NEWLY COATED SURFACES

A. Do not walk on, subject to abrading action, or move items until coats are hardened sufficiently to resist damage.

3.10 COATING TABULATIONS

Tabulation No. 1

Items to be coated – atmospheric service:

a. Unit 1 and Unit 2: Blast and recoat exterior coated surfaces of penstocks in penstock gallery, including manhole exterior covers, associated metalwork, supporting rings, and walkway supports. There is approximately 42,000 square feet total.

b. Unit 1 and Unit 2: Blast and recoat exterior surfaces of scroll case and draft tube man-doors. There is approximately 30 square feet per unit.

Notes:

1. Water drains along penstock gallery floor and concrete surfaces may be damp or dripping. Refer to Section 01 57 30 – Water Pollution Control and Section 02 70 10

– Removal and Control of Water.

2. Do not coat bearing contact surfaces, or surfaces which would be impaired by paint.

Coating materials Moisture-cured urethanes

Number and thickness of coats

Surface preparation method

Prime coat:

Corothane I Mio-zinc, Sherwin Williams Company

MC-Miozinc 2.8 or 100, Wasser Corporation

1 or more coats.

Apply at 3 to 5 mils DFT, per coat, plus stripe coats.

SSPC-SP1 followed by:

SSPC-SP10

Revised 09 96 20 - 14

Tabulation No. 1

Intermediate and finish coats:

Corothane I Ironox B, Sherwin Williams Company

MC Ferrox B 2.8 or 100, Wasser Corporation

Color: Manufacturer’s standard light color and gloss

2 or more coats.

Apply at 3 to 5 mils DFT, per coat.

Total system, excluding stripe coats:

9-mil DFT, minimum 15-mil DFT, maximum

Follow manufacturer’s surface preparation and application instructions to apply subsequent coats.

PERFORMANCE REQUIREMENTS:

Testing Protocol Acceptance Criteria

Abrasion resistance, ASTM D4060, CS-17 wheel, 1,000 cycles, 1-kg load:

100 milligram loss or less

Direct impact, ASTM D2794 100 inch-pounds

Pulloff adhesion, ASTM D4541, annex A2, type II tester:

800 psi or greater

Cyclic testing salt fog/UV, ASTMD 5894:

1/4 inch or less undercutting at 3000 hrs

Tab AE-08.DOC

Revised 09 96 20 - 15

Tabulation No. 2

Items to coated: Painting galvanizing

a. Prepare surface and coat interior and exterior surfaces of new 3-inch diameter piping, including fittings and associated equipment. There is approximately 234 linear feet of 3-inch diameter pipe.

b. Prepare surface and coat new air vent piping supports, including anchor bolt heads.

There are approximately 63 pipe supports.

Notes:

1. Stabilizing or storage treatments, if present on galvanized surfaces, shall be removed by

(a) SSPC-SP1 and sweep blast or (b) manufacturer’s compatible wash treatment.

Coating materials – Option 1 Solvent Borne Epoxy

Number and thickness of coats

Surface preparation method

Prime and finish coat for galvanized surfaces:

Amerlock 400 or Amerlock 2, PPG Protective & Marine Coatings

Macropoxy 646 or Duraplate 235, Sherwin Williams Company

Hi-Build Epoxoline II Series 69N, Tnemec Company

Carboguard 691, Carboline Company

Interzone 954, International Paint

2 or more coats.

Apply at 4 to 8 mils DFT, per coat, plus stripe coats.

Total system, excluding stripe coats:

8-mil DFT, minimum 16-mil DFT, maximum

SSPC-SP7, SSPC-SP3, or manufacturer’s chemical treatment

Coating materials – Option 2 Moisture-cured urethane

Number and thickness of coats

Surface preparation method

Revised 09 96 20 - 16

Prime coat for galvanized surfaces:

Corothane I Mio-zinc, Sherwin Williams Company

MC-Miozinc 2.8 or 100, Wasser Corporation

1 or more coats.

Apply at 3 to 5 mils DFT, per coat, plus stripe coats.

SSPC-SP7, SSPC-SP3, or manufacturer’s chemical treatment

Finish coat:

Corothane Coal Tar, Sherwin Williams Company

MC-Tar, Wasser Corporation

1 or more compatible manufacturer’s finish coats.

Apply at 5 to 7 mils DFT, per coat.

Total system, excluding stripe coats:

8-mil DFT, minimum 12-mil DFT, maximum

Follow manufacturer’s surface preparation and application instructions to apply subsequent coats.

Coating materials – Option 3 100% solids epoxy

Number and thickness of coats

Surface preparation method

All coats:

376F-60LT; Akzo Nobel Enviroline

NSP 120HB High Performance Epoxy; NSP Specialty Products

Color: Manufacturer’s standard light color and gloss

1 or 2 base coats.

Total system measured to steel substrate, excluding stripe coats:

40-mil DFT, minimum 60-mil DFT, maximum

SSPC-SP1 followed by:

SSPC-SP10

Follow manufacturer’s surface preparation and application instructions to apply subsequent coats.

PERFORMANCE REQUIREMENTS:

Testing Protocol Acceptance Criteria

Abrasion resistance, ASTM D 4060, CS-17 wheel, 1,000 cycles, 1-kg load:

100 milligram loss or less

Direct impact, ASTM D2794 Solvent Borne Epoxy: 30 inch-pounds MC Urethanes, 100% Solids Epoxy: 100 inch-pounds

Pulloff adhesion, ASTM D4541, annex A2, type II tester:

500 psi or greater

Revised 09 96 20 - 17

Cyclic testing salt fog/UV, ASTMD 5894:

1/4 inch or less undercutting at 3000 hrs

Tab AE-03.DOC

Tabulation No. 3

Items to be coated – equipment in atmospheric service:

a. Motor operator and appurtenant equipment for 40-inch jet-flow gate, including unexposed surfaces that require coatings, such as interior of cabinets, enclosures, and equipment.

b. Air valve assembly and drain valves, except valve interiors and surfaces not intended to be painted.

c. Equipment and materials for complete electrical system.

Coating materials Factory coating system

Number and thickness of coats

Surface preparation method

Factory's standard surface preparation and permanent coating system.

Color and gloss: Factory's standard.

Tabulation No. 4

Items to be coated – galvanizing repair:

a. Galvanized surfaces of miscellaneous metalwork.

b. Damaged galvanized surfaces not otherwise tabulated.

Coating materials

Number and thickness of coats

Surface preparation method

Repair damaged galvanized surfaces in accordance with ASTM A780, except repair materials containing cadmium and lead are not permitted.

099CT_35.DOC

Revised 09 96 20 - 18

Tabulation No. 5

Items not to be coated and to receive a uniform passivation layer:

a. Stainless steel gate leaf.

b. Stainless steel clad surfaces not otherwise tabulated herein.

Note: Do not coat stainless steel items listed above. New stainless steel surfaces to receive uniform passivation at point of manufacture. Clean and restored uniform passivation layer of damaged, contaminated, or depassivated stainless steel surfaces by methods listed below.

Coating materials Number and thickness of coats

Surface preparation method

Do not coat unless specifically listed elsewhere in these tabulations.

ASTM A380

Repassivation Methods and Inspection Procedures of Contaminated Stainless Steel Surfaces

Degree of surface contamination

ASTM A 380* Surface preparation method**

ASTM A 380* Surface preparation method**

Locally heavy surface contaminated areas:

Contaminated by free iron, oxide scale, or rust related contaminates caused by field welding or cutting.

Method 5. - "Descaling", General

Method 5.3 - "Mechanical Descaling" by grinding and/or Method 6.3 - "Cleaning of Welds and Weld-Joint Areas"

Method 7.2 - "Gross Inspection"

Methods 7.2.5 - "Tests for Free Iron: Gross Indications"

General surface contaminated areas:

Contaminated by free iron, oxide scale, or rust related contaminates.

Method 5. - "Descaling," General

Method 5.2 - "Chemical Descaling"

Method 5.2.2.(1) - "Chemical Descaling" by swab or spray wetting the surfaces and/or Method 5.3 - "Mechanical Descaling" by grinding

Method 7.2 – “Gross Inspection”

Method 7.2.5 – Tests for Free Iron: Gross Indication

Revised 09 96 20 - 19

Tabulation No. 5

General surface contaminated areas:

Contaminated by grease, oil, residual chemical films, or other non-free iron related contaminates.

Method 6.2.10 - "Water Jetting" and/or

Method 6.4 - "Final Cleaning, or Passivation, or Both", wiping with a clean, solvent-moistened cloth

Method 7.2 - "Gross Inspection"

Method 7.2.2 - "Wipe Tests"

Where films are not detectable under white light conditions, use

Method 7.3 - "Precision Inspection"

Method 7.3.2 - "Black Light Inspection"

* Other ASTM A 380 methods may be used instead of above specified surface preparation methods and inspection procedures.

** Do not damage attached parts, adjacent parts, or materials by field cleaning and passivation methods of stainless steel.

099CT_41.DOC

END OF SECTION

Impacted Immersion Coatings

Revised 09 97 02 - 1

SECTION 09 97 02

IMPACTED IMMERSION COATINGS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. General:

1. Payment for various items to be recoated or spot repaired includes the following costs:

a. Containment, safety, and health activities for coatings work.

b. Coating removal, handling, and disposal, including abrasive disposal.

c. Surface preparation, such as abrasive blasting, cleaning, and grinding.

d. Coating application and remedial work.

B. Blast and Recoat Interior Surfaces of Penstock and Outlet Tube, including Embedded Pipe Appurtenances for Unit 1:

1. Measurement: Surface area blasted and recoated.

2. Payment: Square foot price offered in the Price Schedule.

C. Blast and Recoat Interior Surfaces of Penstock and Outlet Tube, including Embedded Pipe Appurtenances for Unit 2:

1. Measurement: Surface area blasted and recoated.

2. Payment: Square foot price offered in the Price Schedule.

D. Blast and Recoat Interior Surfaces of Scroll Case for Unit 1:

1. Measurement: Surface area blasted and recoated.

2. Payment: Square foot price offered in the Price Schedule.

E. Blast and Recoat Interior Surfaces of Scroll Case for Unit 2:

1. Measurement: Surface area blasted and recoated.

2. Payment: Square foot price offered in the Price Schedule.

F. Spot Repair Turbine Runner for Unit 1:

1. Measurement: Surface area delineated as repair area.

a. No single repair area will be measured as less than 1 square foot.

1) Delineation of each repair area to be determined by COR.

2) Each repair area may contain multiple spot repairs.

Revised 09 97 02 - 2

2. Payment: Square foot price offered in the Price Schedule.

G. Spot Repair Turbine Runner for Unit 2:

1. Measurement: Surface area delineated as repair area.

a. No single repair area will be measured as less than 1 square foot.

1) Delineation of each repair area to be determined by COR.

2) Each repair area may contain multiple spot repairs.

2. Payment: Square foot price offered in the Price Schedule.

H. Blast and Recoat Draft Tube Steel Lining for Unit 1:

1. Measurement: Surface area blasted and recoated.

2. Payment: Square foot price offered in the Price Schedule.

I. Blast and Recoat Draft Tube Steel Lining for Unit 2:

1. Measurement: Surface area blasted and recoated.

2. Payment: Square foot price offered in the Price Schedule

J. Blast and Recoat Draft Tube Pier Nose and Pier Grating for Unit 1:

1. Measurement: Surface area blasted and recoated.

2. Payment: Square foot price offered in the Price Schedule.

K. Blast and Recoat Draft Tube Pier Nose and Pier Grating for Unit 2:

1. Measurement: Surface area blasted and recoated.

2. Payment: Square foot price offered in the Price Schedule.

L. Weld Repair during Surface Preparation of Penstock, Outlet Tube, Scroll Case, and Draft Tube for Unit 1:

1. Measurement: Surface area delineated as weld repair

a. No single repair area will be measured as less than 1 square inch.

b. Delineation of each repair area to be determined by COR.

2. Payment: Square inch price offered in the Price Schedule.

a. Does not include runner repair. Refer to Section 48 13 10 – Vertical Francis Turbine Runner Repair.

M. Weld Repair during Surface Preparation of Penstock, Outlet Tube, Scroll Case, and Draft Tube for Unit 2:

1. Measurement: Surface area delineated as weld repair.

a. No single repair area will be measured as less than 1 square inch.

Revised 09 97 02 - 3

b. Delineation of each repair area to be determined by COR.

2. Payment: Square inch price offered in the Price Schedule.

a. Does not include runner repair. Refer to Section 48 13 10 – Vertical Francis Turbine Runner Repair.

N. Cost:

1. Include cost of coating new stoplogs and lifting beam in the lump sum price offered in the Price Schedule for Furnish, Deliver, and Test Coated Stoplogs.

2. Include cost of coating interior and exterior ferrous surfaces of new 40-inch jet-flow gates in applicable lump sum prices offered in the Price Schedule for Jet- Flow Gate for Unit 1 and Jet-Flow Gate for Unit 2.

3. Include cost of coating interior and exterior surfaces of new 14-inch diameter steel vent piping in applicable linear foot prices offered in the Price Schedule for Furnish and Install Lined and Coated 14-Inch Steel Vent Piping for Unit 1 and Furnish and Install Lined and Coated 14-Inch Steel Vent Piping for Unit 2.

4. Include cost of coating interior and exterior surfaces of steel pipe for air valve assembly and drain valves in lump sum price offered in the Price Schedule for Furnish Steel Pipe for Air Valve Assembly and Drain Valves.

1.02 REFERENCE STANDARDS

A. ASTM International (ASTM)

1. ASTM D153-84(2014) Specific Gravity of Pigments

2. ASTM D281-12 Oil Absorption of Pigments by Spatula Rub-out

3. ASTM D520-00(2011) Zinc Dust Pigment

4. ASTM D561-82(2014) Carbon Black Pigment for Paint

5. ASTM D740-11 Methyl Ethyl Ketone

6. ASTM D841-13 Nitration Grade Toluene

7. ASTM D1045-14 Sampling and Testing Plasticizers Used in Plastics

8. ASTM D1152-06(2012) Methanol (Methyl Alcohol)

9. ASTM D1153-12 Methyl Isobutyl Ketone 1, 2

10. ASTM D1200-10(2014) Viscosity by Ford Viscosity Cup

11. ASTM D1210-05(2014) Fineness of Dispersion of Pigment-Vehicle Systems by Hegman-Type Gage

12. ASTM D2917-07(2013) Methyl Isoamyl Ketone

13. ASTM D3465-14 Purity of Monomeric Plasticizers by Gas Chromatography

Revised 09 97 02 - 4

14. ASTM D3721-05(2011) Synthetic Red Iron Oxide Pigment

15. ASTM D4285-83(2012) Indicating Oil or Water in Compressed Air

16. ASTM D6677-07(2012) Evaluating Adhesion by Knife

17. ASTM E1347-06(2011) Color and Color-Difference Measurement by Tristimulus Colorimetry

B. American Welding Society (AWS)

1. AWS D1.1/D1.1M - 15 Structural Welding Code

C. American Water Works Association (AWWA)

1. AWWA C206-11 Field Welding of Steel Water Pipe

D. Federal Standards (Fed Std)

1. Fed Std 595C(1)-08 Colors Used in Government Procurement

E. International Organization For Standardization (ISO)

1. ISO 8502-3-1992 Assessment of Dust on Steel Surface Prepared for Painting (Pressure-Sensitive Tape Method)

F. The Society for Protective Coatings (SSPC)/NACE International (NACE)

1. SSPC-AB1-15 Mineral and Slag Abrasives

2. SSPC-AB2-15 Cleanliness of Recycled Ferrous Metallic Abrasives

3. SSPC-AB3-04 Newly Manufactured or Re-Manufactured Steel Abrasives

4. SSPC-Guide 15-05 Field Methods for Retrieval and Analysis of Soluble Salts on Substrates and Other Nonporous Substrates

5. SSPC-PA2-15 Measurement of Dry Paint Thickness with Magnetic Gages

6. SSPC-QP1-12 Evaluating Painting Contractors (Field Application to Complex Industrial Structures)

7. SSPC-QP2-09 Evaluating Painting Contractors (Field Removal of Hazardous Coatings From Complex Industrial Structures)

8. SSPC-QP3-10 Evaluating the Qualification of Shop Painting Contractors

9. SSPC-SP1-15 Solvent Cleaning

Revised 09 97 02 - 5

10. SSPC-SP5/NACE 1-07 White Metal Blast Cleaning

11. SSPC-SP WJ-1/NACE WJ-1-12 Surface Preparation Standard – Waterjetting Cleaning of Metals – Clean To Bare Substrate

12. SSPC-VIS1-02 Guide and Reference Photographs for Steel Surfaces Prepared by Abrasive Blast Cleaning

13. SSPC-VIS3-04 Visual Standard for Power- and Hand-Tool Cleaned Steel

14. NACE RP 0287-02 Field Measurement of Surface Profile of Abrasive Blast Cleaned Steel Surfaces Using a Replica Tape

15. NACE SP 0188-06 Discontinuity (Holiday) Testing of New Protective Coatings on Conductive Substrates

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

1. Include the following information with each set of data or certification:

a. Applicable tabulation number from Coating Tabulations.

b. Identification of “Items to be coated” including sub-letter and sub-number listed in Coating Tabulations.

B. RSN 09 97 02-1, Approval Data:

1. For each coating material:

a. Manufacturer’s product data, application, and SDS sheets.

b. Supplier’s name, address, and phone number.

c. Identification of “Items to be coated” including sub-letter and sub-number listed in Coating Tabulations.

2. For each caulk and filler:

a. Manufacturer’s product data, application, and SDS sheets.

b. Supplier’s name, address, and phone number.

c. Identification of areas of use including sub-letter and sub-number listed in Coating Tabulations.

C. RSN 09 97 02-2, Final Approval Data:

1. For each coating material and thinner:

Revised 09 97 02 - 6

a. Purchase orders including order number,…