Green Mountain Penstock Rehabilitation - Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GRN_MTN__amendment_4.pdf | ||
| Amendment_0003_DESCRIPTION_OF_CHANGES.pdf | ||
| Amendment_2.pdf | ||
| 16.__Solicitation_GRN_MTN__May__29__2018.pdf | ||
| FedConnect File | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R6018R0004 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Billings MT 59107
R60
PO Box 36900 Regional Office Great Plains Region Bureau of Reclamation
05/29/20180001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/29/2018
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Green Mountain Powerplant Penstock Rehabilitation, Colorado Big Thompson Project, Colorado
See Page 2 for changes incorporated in this amendment.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Paris Everson
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment 0001 Solicitation 140R6018R0004
____________________________________________________________________Page 2 of 5
I. DESCRIPTION OF CHANGES:
SECTION 52 00 00 – DRAWINGS:
a. Insert Drawing No. 245-D-60061
b. Remove duplicate Drawing No. 245-D-60060
II. SITE VISIT ATTENDEES:
The organized site visit was held on June 12, 2018 at Green Mountain Powerplant, approximately 20 miles northwest of Silverthorne, Colorado, in Summit County. The following individuals attended the site visit:
NAME COMPANY PHONE NUMBER EMAIL ADDRESS
Mark Hebener Weeke Electric 618-218-0614 mhebs2@hotmail.com Jeff Mitchell The Gateway Co. 801-532-2500 khouston@gatewaycompany.com Ron Hallquist HPM Inc. 720-618-4961 Ron.hallquist@hpmcontracting.com Scott Salmon TMI Coatings
Inc.
651-452-6100 ssalmon@tmicoatings.com
Bryan Miller BCI Const. USA 618-277-2858 bmiller@bciconusa.com Matt Huebener Hartman Walsh
Painting 714-443-7519 mhuebener@hartmanwalsh.com
David Riecuen R.L. Wadsworth 303-802-5808 driecken@wadsco.com Mike Kostenico F.D. Thomas Inc. 541-664-3010 Bids@FDThomas.com Gerry Granahan Gracon LLC 970-667-2203 ggranahan@graconllc.com Mike Sondag Alltech Eng. Corp 651-681-1103 msondag@alltechengineering.com Wayne Garner ASI Construction
LLC
719-248-0538 wgarner@asidams.com
George Brower ASI Construction
LLC
719-647-2821 gbrower@asidams.com
Richard Vasquez
Spiniello Companies
201-563-4027 rvasquez@spinielloco.com
III. QUESTIONS AND ANSWERS
Question 1.
According to the Scope of Work this project is calling for a Coating Quality Control Manager with a NACE Level III certification. My question is do you hire the third party coating inspector or is it up to the contractor?
mailto:mhebs2@hotmail.com mailto:khouston@gatewaycompany.com mailto:Ron.hallquist@hpmcontracting.com mailto:ssalmon@tmicoatings.com mailto:bmiller@bciconusa.com mailto:mhuebener@hartmanwalsh.com mailto:driecken@wadsco.com mailto:Bids@FDThomas.com mailto:ggranahan@graconllc.com mailto:msondag@alltechengineering.com mailto:wgarner@asidams.com mailto:gbrower@asidams.com mailto:rvasquez@spinielloco.com
____________________________________________________________________Page 3 of 5
Answer 1.
The contractor will provide the Quality Control Manager in accordance with specification paragraphs Coatings 09 96 20 1.03.D.3 and Impacted Immersion Coatings 09 97 02 1.03.D.3.
Question 2.
We got word of this project and have a couple of questions.
We have received our QP1 and QP2 certifications but have not done the QP3 yet. We do not have the CAS or PCAC certifications but we have been certified by International paint and other material manufacturers on Plural Component application. We have current Level 3 NACE coating inspectors on staff.
We are asking if we would be eligible to bid this project, we would like to send someone to the job showing if we could be considered as an approved contractor.
Answer 2.
Within the Solicitation are the specifications and requirements and is located on two Government official websites: www.fbo.gov and www.fedconnect.net. In regards to your question on QP3, CAS, PCAC and NACE, see Specification 09 96 20 Coatings and please read the entire solicitation to ensure your questions and concerns are addressed. At this time I cannot answer if your company is eligible or not. That is determined by the offerors proposal, if you choose to submit and after closing date and evaluation of the offerors proposal. The site visit location date and time are listed in the "Foreword" page of the solicitation and is advertised as Full and Open competition to anyone that is interested in providing a proposal on this project.
Question 3.
I am inquiring into the Green Mountain Penstock Rehab project and where I can obtain a copy of the project specification.
Answer 3.
The solicitation is advertised on the two Government Official websites: www.FBO.gov and www.fedconnect.net.
Question 4.
In the scope of work described in the project advertisement was the rehabilitating of existing penstock coatings. Company X manufactures Fiberglass Reinforced Mortar Pipe that is used to rehabilitate by sliplining method Penstocks and Pipelines in the diameter range of 24” thru 130”.
I was wondering if the US Bureau of Reclamation would consider the use of Company X to rehabilitate the Penstock instead of using coatings?
____________________________________________________________________Page 4 of 5
Answer 4.
The Government thanks you for your offer to provide an alternative method. However due to the circumstances of this particular project, our specified requirement is the best method.
Question 5.
Control Monitoring 25 00 01 Section 1.06.D says to install modules and program existing control system cabinet CCSA to communicate with Jet-flow Gate Remote I/O and flowmeters.
Question: It appears the I/O for the flowmeters has to go into the existing PLC racks in CCSA cabinet. According to the drawings, the PLC racks in the CCSA do not have any spare slots?
Please clarify
Answer 5.
There are currently 5 spaces in cabinet CCSE with an Ethernet Module communicating back to CCSA PLC controller. It is recommended to take advantage of these spaces. See drawing 125 from the solicitation package.
Question 6.
Control Monitoring 25 00 01 Question: According to drawing 36 provided, there is an existing SCADA and Operators Workstation. We know we have to update the existing PLC program to add new logic and interface for remote I/O and new OIT. Do we need to add programming/screen updates to the existing SCADA and Operators Workstation. If so, what is the software currently being used?
Answer 6.
Yes. Updates will be needed for the existing programming. See Section 25 00 01, Control and Monitoring, Article 1.05B, for software used on the workstation.
Question 7.
We would like to request an extension for proposal due date.
Answer 7.
The proposal due date is extended until July 19, 2018
Question 8.
Section L-21.4.2 requires submission of a schedule as part of our proposal. What date should we use as notice to proceed?
____________________________________________________________________Page 5 of 5
Answer 8.
The Notice to Proceed date is September 30, 2018.
IV. PROPOSAL DUE DATE:
The proposal due date is hereby extend from 3:00 pm MT, June 28, 2018 to 3:00 pm MT, July 19, 2018.
V. CUT-OFF DATE TO SUBMIT QUESTIONS:
The cut-off date & time to submit questions is 12:00 pm MT, July 6, 2018. The Government will not respond to questions submitted after this date and time.
A L W
A Y S
T H
I N
K
S A F E T Y
D
C
B
A
D
C
B
A
LAR M TA IOCE N
R el ea se d
245-D-60061 ShtNo: 30
File details come from the government source that posted it.