PWS_AMD0003_0003.pdf
PDF 158 KB Posted
- Attached to
- GC26 - MAINTENANCE OF THREE COPIERS
- Solicitation number
- 140R4026Q0121
About this file
This is a Performance Work Statement (PWS) for copier/printer preventative maintenance and repair services at the Glen Canyon Field Division facilities in Page, Arizona. The Government owns three Xerox multifunction devices (two VersaLink 7030 models and one VersaLink 7100) requiring annual on-site preventative maintenance, as-needed repair services, and full provision of OEM parts and consumables (excluding paper). The contract structure is firm-fixed-price per year with a 12-month Base Year plus four optional 12-month option years, exercisable at the Government's unilateral discretion.
The contractor must perform yearly preventative maintenance on each copier to improve/maintain performance, identify issues before failure, maintain OEM specifications, restore calibration and image quality, and ensure firmware updates are current. For repair services, the contractor must use OEM parts and restore performance to manufacturer specifications. Response-time requirements are strict: contractors must acknowledge service calls within 60 minutes and provide an estimated time of arrival. Critical repairs (device completely inoperable) require on-site technician arrival within 1 business day; routine repairs require arrival within 3 business days. All service occurs Monday–Friday, 8:00 a.m.–5:00 p.m., excluding Federal holidays. Each copier must maintain 95% minimum monthly uptime (excluding scheduled preventative maintenance, Government-caused delays, and facility outages). If repairs exceed 5 business days, the contractor must deliver a comparable loaner unit within 2 business days at no additional cost. Deliverables include detailed written service reports for each visit and yearly preventative maintenance confirmations. Invoicing is consolidated monthly and must reference the contract number, billing period, PM completion confirmation, and repair summaries.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140R4026Q0121_Amd_0003.pdf | ||
| QASP_AMD0003_0003.pdf | ||
| Sol_140R4026Q0121_Amd_0002.pdf | ||
| Sol_140R4026Q0121_Amd_0001.pdf | ||
| Wage_Determinations_Coconino_County__AZ.pdf | ||
| Combined_Synopsis-Solicitation.pdf | ||
| 13_QASP.pdf | ||
| PWS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
Glen Canyon Field Division Copier/Printer Preventative Maintenance and Repair Services Base Year + Four Option Years
1.0 Purpose
The purpose of this Performance Work Statement (PWS) is to establish the requirements for yearly inspection, preventative maintenance, and as-needed repair services for three Government-owned Xerox multifunction copier/printer devices located at the Glen Canyon Field Division facilities in Page, Arizona. The Contractor shall provide all necessary parts, labor, and Original Equipment Manufacturer (OEM) consumables (excluding paper) to ensure reliable equipment performance, sustained operational availability, and compliance with OEM standards.
2.0 Period of Performance
The anticipated period of performance is:
• Base Year: 12 months from date of award
• Option Year 1: 12 months
• Option Year 2: 12 months
• Option Year 3: 12 months
• Option Year 4: 12 months
Each option year may be exercised at the unilateral discretion of the Government in accordance with FAR 52.217-9.
3.0 Scope
The contractor shall furnish all personnel, tools, materials, equipment, transportation, OEM parts, OEM consumables, service reports, diagnostics, and management necessary to perform yearly preventative maintenance and on-site repair services for all covered equipment. All service shall be performed between 8:00 a.m. and 5:00 p.m., Monday through Friday, excluding Federal holidays.
4.0 Equipment Covered
The contractor shall provide full maintenance coverage for the following Government-owned equipment:
4.1 Xerox VersaLink 7030
Serial No. 9TX079983N Location: Glen Canyon Field Division — Warehouse Office, 805 Bureau Street, Page, AZ 86040
4.2 Xerox VersaLink 7030
Serial No. 9TX080549N Location: Glen Canyon Field Division — Security Office, 805 Bureau Street, Page, AZ 86040
4.3 Xerox VersaLink 7100
Serial No. QPH235195 Location: Glen Canyon Field Division — Visitor Center Admin, 10000 Highway 89, Page, AZ 86040
5.0 Performance Requirements
5.1 Yearly On-Site Preventative Maintenance (PM)
The contractor shall perform PM once 12 months for each copier. PM results must:
• Improve or maintain device performance
• Identify issues before failure
• Keep the device within OEM functional specifications
• Restore calibration and image quality
• Ensure firmware is up-to-date
PM shall include meter readings and a written service report (see Section 7.0).
5.2 Repair Services (As Needed)
The contractor shall perform repairs necessary to restore devices to full functionality. All repair work shall:
• Use OEM parts and components
• Restore performance to manufacturer specifications
• Be fully documented
• Prevent recurrence of the same issue
5.3 Response-Time Requirements
5.3.1 Acknowledgment of Service Call
Contractor shall contact the Government POC within 60 minutes of service call placement to confirm receipt and provide an ETA.
5.3.2 On-Site Arrival Requirements
For purposes of this PWS, repairs are categorized as follows:
• Critical Repair: A malfunction that renders the copier completely inoperable (e.g., the device will not power on, or is otherwise fully unable to produce output).
• Routine Repair: A malfunction that degrades performance or produces an error condition but does not render the device fully inoperable (e.g., an error code displayed on the device screen, print quality issues, paper jams).
• Critical Repairs: Technician on-site within 1 business day (24 business hours).
• Routine Repairs: Technician on-site within 3 business days.
All service must occur Monday–Friday, 8:00 a.m.–5:00 p.m., excluding Federal holidays.
5.4 Uptime Performance Standard
Each copier shall maintain a minimum 95% uptime each month, excluding:
• Scheduled PM
• Government-caused delays
• Facility power/network outages
Contractor must take corrective action when uptime falls below the threshold.
5.5 Loaner Equipment Requirement
If a copier repair is not completed within 5 business days of the initial service call, the contractor shall deliver a comparable loaner unit (equivalent in output speed and multifunction print/scan/copy capability) no later than 2 business days thereafter, at no additional cost to the
Government. The contractor is responsible for all maintenance, service, and OEM consumables for the loaner unit for the duration of its use. Upon completion of repairs to the original device, the contractor shall retrieve the loaner unit within 2 business days
6.0 Contractor-Furnished Parts and Consumables
The contractor shall furnish all OEM parts and supplies, including but not limited to:
• Toner
• Imaging units
• Drums
• Transfer belts
• Fusers
• Rollers/feed assemblies
• Waste toner containers
• OEM maintenance kits
• Firmware/software updates
The Government furnishes paper only.
7.0 Deliverables
7.1 Service Reports
For every preventative maintenance or repair visit, contractor shall provide a written service report that includes:
• Device serial number and location
• Date/time of service
• Work performed
• Parts replaced
• Meter readings
• Firmware version
• Recommendations or recurring issues
7.2 Monthly PM Confirmation
Contractor shall provide a yearly confirmation listing:
• PM completion date
• Device condition summary
• Noted risks or upcoming maintenance needs
8.0 Government Responsibilities
• Provide escorts to access all locations
• Ensure equipment is available for servicing
• Provide power, network, and workspace
• Supply paper
• Submit service calls to contractor through designated channels
9.0 Security and Access
Contractor personnel shall be escorted at all times while inside Government facilities.
No special security access, clearance, or additional background checks are required to perform work under this PWS.
10.0 Quality Assurance
The Government will monitor contractor performance through:
• Review of service reports
• Uptime tracking
• Timeliness of response
• Compliance with PM schedule
• Contractor communication
The Government may document deficiencies and require corrective action.
11.0 Invoicing
• Contract is firm-fixed-price per year (Base + each Option Year).
• The Contractor may invoice after completing service calls, but shall submit only one consolidated invoice per calendar month.
• Invoices must reference:
o Contract number o Billing period o Confirmation PM was completed o Summary of repairs that month
File details come from the government source that posted it. Updated .