This is a Quality Assurance Surveillance Plan (QASP) for copier/printer preventative maintenance and repair services at Glen Canyon Field Division, covering a base year plus four option years.
The QASP establishes systematic monitoring methods to ensure contractor compliance with the Performance Work Statement (PWS). Government oversight is managed by the Contracting Officer (CO), who maintains overall contract administration and authority; the Contracting Officer's Representative (COR), who serves as the primary monitor for contractor performance; and Government Technical Points of Contact (POCs) at specific copier locations. Key performance objectives monitored include quarterly preventative maintenance, repair services, response times, equipment uptime, loaner equipment provision, and service reporting. The contractor must complete preventative maintenance every three months with 100% compliance and zero missed visits. Repair services must restore full device functionality using OEM components, with 95% of repairs completed without issue recurrence within 30 days. Critical repairs require on-site response within one business day (95% compliance), while routine repairs must be completed within three business days (95% compliance). The contractor must contact the POC within 60 minutes of service call placement (95% compliance). Equipment uptime must meet 95% per machine monthly, excluding approved downtimes. Loaner equipment must be delivered within two business days once the five-business-day repair threshold is reached, with 100% compliance required. Service reports must be submitted after every visit with 100% compliance. Surveillance methods include 100% inspection for PM compliance and loaner deadlines, random sampling for repair quality, customer feedback from POC reports, contractor self-reporting, and escort log verification. The COR maintains comprehensive documentation of all service reports, repair logs, uptime calculations, notification timestamps, escort logs, and corrective actions to support annual option-year evaluations and contractor performance reports. If performance falls below acceptable quality levels, the CO may require corrective action plans, reduce invoice payments, suspend payment approval, decline to exercise option years, issue cure notices, or terminate the contract for cause.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140R4026Q0121_Amd_0003.pdf | ||
| QASP_AMD0003_0003.pdf | ||
| PWS_AMD0003_0003.pdf | ||
| Sol_140R4026Q0121_Amd_0002.pdf | ||
| Sol_140R4026Q0121_Amd_0001.pdf | ||
| Wage_Determinations_Coconino_County__AZ.pdf | ||
| Combined_Synopsis-Solicitation.pdf | ||
| PWS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
For: Copier/Printer Preventative Maintenance and Repair Services Glen Canyon Field Division Base Year + Four Option Years
1.0 Purpose
The purpose of this Quality Assurance Surveillance Plan (QASP) is to outline the systematic methods that the Government will use to monitor and evaluate the contractor’s performance to ensure compliance with the Performance Work Statement (PWS). This QASP provides a framework but does not change or replace the PWS requirements.
2.0 Government Roles and Responsibilities
2.1 Contracting Officer (CO)
• Responsible for overall contract administration.
• Ensures compliance with contract terms and conditions.
• Has sole authority to modify the contract or issue formal notices of noncompliance.
2.2 Contracting Officer’s Representative (COR)
• Primary individual responsible for monitoring contractor performance.
• Receives reports, verifies services, and documents issues.
• Performs inspections and validates compliance with the QASP.
2.3 Government Technical POC(s)
• May be delegated to specific copier locations.
• Provides escort access and reports service issues to the contractor.
3.0 Performance Objectives
The contractor must meet the performance objectives defined in the PWS.
The Government will monitor the following key performance areas:
PWS Section Performance Objective
5.1 Quarterly Preventative Maintenance
5.2 Repair Services
5.3 Response Times
5.4 Uptime Standard
5.5 Loaner Equipment
7.0 Service Reporting
4.0 Performance Standards and Acceptable Quality Levels (AQLs)
4.1 Quarterly Preventative Maintenance
Standard: PM completed every 3 months per device.
AQL: 100% completion; zero missed PM visits.
Surveillance Method:
• COR reviews PM reports quarterly.
• COR confirms technician sign-in or escort logs.
4.2 Repair Services (Technical Quality)
Standard: Repairs fully restore device functionality using OEM components.
AQL: 95% of repairs completed without recurrence of the same issue within 30 days.
Surveillance Method:
• Review service reports
• Monitor device performance after repair
• POC feedback
4.3 Response Times
Critical Repairs
Standard: On-site within 1 business day (24 business hours).
AQL: 95% compliance.
Routine Repairs
Standard: On-site within 3 business days.
AQL: 95% compliance.
Surveillance Method:
• Timestamp comparison of service request and technician arrival
• COR review of service logs
• Verification with escort logs
4.4 POC Notification Requirement
Standard: Contractor contacts POC within 60 minutes of service call placement.
AQL: 95% compliance.
Surveillance Method: Email/phone records, time-stamped logs.
4.5 Equipment Uptime
Standard: 95% uptime per machine per month (excluding approved downtimes).
AQL: 95% compliance.
Surveillance Method:
• COR tracks outage reports
• Contractor reporting validated by user logs
4.6 Loaner Equipment
Standard: Loaner unit delivered within 2 business days of the 5-business-day repair threshold being reached; loaner is comparable in capability; contractor maintains and supplies consumables for the loaner; loaner retrieved within 2 business days of original unit's return to service.
AQL: 100% compliance.
Surveillance Method:
• Timeline verification (repair start vs. loaner delivery)
• Escort logs
• COR documentation
4.7 Service Reports
Standard: A complete service report submitted after every PM and repair visit.
AQL: 100% compliance.
Surveillance Method:
• Quarterly COR review
• Cross-check with escort records and user reports
5.0 Surveillance Methods
The Government may use any of the following, individually or in combination:
5.1 100% Inspection
Used for:
• PM schedule compliance
• Service report submission
• Loaner equipment deadlines
5.2 Random Sampling
Used occasionally for:
• Repair quality
• Uptime verification
5.3 Customer Feedback/POC Reports
Users at each copier location provide operational feedback on:
• Downtime
• Repair quality and timeliness
• Print quality
• Responsiveness
5.4 Contractor Self-Reporting
Service reports and PM logs submitted by the contractor.
5.5 Escort Log Verification
Federal escorts confirm:
• Technician arrival times
• Access
• Duration of service visits
6.0 Performance Evaluation and Remedies
6.1 Acceptable Performance
If the contractor meets or exceeds AQLs, performance is considered satisfactory.
6.2 Unacceptable Performance
If the contractor fails to meet the AQLs, the COR may:
• Document the deficiency
• Request corrective action
• Notify the CO of noncompliance
6.3 Contract Remedies
The CO may take any of the following actions:
• Require a formal corrective action plan
• Reduce invoice payments (if authorized by the contract)
• Suspend invoice approval until deficiencies are corrected
• Not exercise the next option year
• Issue a cure or show-cause notice
• Terminate for cause or default (in severe cases)
7.0 Documentation
The COR shall maintain:
• Quarterly PM service reports
• Repair reports and logs
• Records of uptime calculations
• Email/phone time stamps for POC notification
• Escort logs
• Corrective action documentation, if any
These documents will form the basis for:
• Annual option-year evaluation
• Contractor performance reports (CPARS, if applicable)