About this file

This is a Statement of Work (SOW) for the replacement of a high-head test facility pumping unit at the Bureau of Reclamation's Hydraulics Laboratory in Denver, Colorado. The project involves procuring, delivering, and installing a new 250 horsepower pumping unit (pump and motor) with a variable frequency drive (VFD), while removing and disposing of existing equipment that has exceeded its service life.

The work is organized into four Contract Line Item Numbers (CLINs): CLIN 010 covers removal and disposal of the existing equipment, including preparation of a safety plan and job hazard analysis; CLIN 020 requires furnishing a modern equivalent 250 hp vertical turbine pump meeting or exceeding the existing pump curve specifications, with recommended manufacturers including Goulds, Flowserve, and Ruhrpumpen, along with a 250 hp motor from manufacturers such as U.S. Motors, Baldor, or WEG; CLIN 030 requires furnishing one 250 hp VFD, specifically a Galt Model G540-03050UL-03 or approved equal; and CLIN 040 covers complete installation of the pumping unit and VFD with all necessary electrical connections, coordination with laboratory staff, and commissioning. The contractor must verify existing equipment dimensions prior to removal, coordinate a Job Hazard Analysis, and provide comprehensive documentation including installation plans, commissioning reports, pump riser calculations, and operations and maintenance manuals. An on-site information session is scheduled for July 28, 2026, at the Denver Federal Center, with attendance registration required by July 24, 2026. The period of performance is twelve months from award, with work performed at Building 56 during normal business hours (Monday-Friday, 7:30 a.m. to 4:00 p.m.), and all contractor personnel must comply with security procedures and complete badging requirements if on-site work exceeds five working days.

View the file

Other files for this federal contract opportunity

Other files attached to High Head Test Facility Equipment, newest first.
File Type Posted
Sol_140R4026Q0073_Amd_0003.pdf PDF
Site_Visit_Atendee_List_0003.pdf PDF
TSC_High_Head_Test_Facility_Equipment_Site_Visit_Questions_and_Answer_Session_0003.pdf PDF
Sol_140R4026Q0073_Amd_0002.pdf PDF
Vendor_Question_and_Answers_List_0001.pdf PDF
Sol_140R4026Q0073_Amd_0001.pdf PDF
Attachment_3_33_12_71_-_Vertical_Turbine_Pumping_Units_FINAL.pdf PDF
Attachment_2_SOW_High_Head_Facility_FINAL.pdf PDF
Sol_140R4026Q0073.pdf PDF
Attachment_1_Schedule_B.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

High Head Test Facility Pumping Unit Replacement

1. Introduction – The Bureau of Reclamation’s Hydraulics Laboratory utilizes a high-head test facility to conduct research experiments for dams and related structures and equipment. It is a unique facility that allows a wide range of real-world conditions of water speed and pressure to be applied within a laboratory experiment. Existing equipment has passed its expected service life and needs to be replaced. This project involves procuring, delivering, and installing a pump, motor, and variable speed drive along with uninstalling, removing, and disposing of existing equipment.

2. Definitions –

a. CLIN: Contract Line Item Number

b. Pumping Unit: Pump and Motor

c. TDH: Total Dynamic Head

d. VFD: Variable Frequency Drive

3. Background – The existing pump is a 7-stage vertical turbine pump, Allis-Chalmers Serial

No. 84014241T and Type 12 VTO. The existing motor is a 250 hp Allis-Chalmers Direct Current Serial No. 7-5314-32252-1-1, 3-phase (480V) with a rated speed of 1,750 rpm.

Variable speed motor control is currently conducted using a direct current drive system. A pump curve recently measured on the original pump is shown in Section 11, along with photos and dimensions of existing equipment.

Operational flexibility is the most important factor in providing a new pumping unit. It is recognized that the specified range of head and flow is wide and pushes the envelope of what is available. Pump efficiency is not an important consideration in this case as the unit will be used infrequently and for short periods of time. Typical operations are no more than 8 hours per day for only 10 weeks each year, approximately.

4. Scope of Work by CLIN –

a. CLIN 010 – Removal and Disposal

i. As-found conditions:

1. Contractor is responsible to verify all existing equipment and dimensions prior to removal and procurement of new equipment.

2. All measurements in this Statement of Work are approximate.

ii. Safety Plan:

1. Job Hazard Analysis.

2. Work area designations.

3. Safety barriers.

4. Personal Protective Equipment.

iii. Pumping Unit:

1. Contractor must uninstall, remove, and dispose of existing pumping unit.

b. CLIN 020 – Furnish Pumping Unit

i. One (1) 250 hp Pumping Unit

1. Pump:

a. Modern equivalent model of Allis-Chalmers Type 12 V/TO

Vertical Turbine Pump, meeting or exceeding the existing pump curve (Figure 1) and the requirements of 33 12 71 – Vertical Turbine Pumping Unit, or approved equal.

i. Recommended manufacturers:

1. Goulds;

2. Flowserve;

3. Ruhrpumpen;

4. or equivalent.

2. Motor:

a. Recommended manufacturers:

i. U.S. Motors;

ii. Baldor;

iii. WEG;

iv. or equivalent.

c. CLIN 030 – Furnish VFD

i. One (1) 250 hp VFD for the vertical high head pumping unit – Galt Model G540-03050UL-03 or approved equal.

ii. Refer to Attachment: 33 12 71 – Vertical Turbine Pumping Unit.

d. CLIN 040 – Installation

i. Contractor is responsible for installation of pumping unit and VFD per

Attachment 33 12 71 – Vertical Turbine Pumping Unit.

ii. Contractor is responsible for all electrical connections. Motor must be wired to the associated VFD.

iii. Contractor is responsible for all lifting and handling, including any equipment necessary to remove and install pumping unit.

iv. Contractor must coordinate with Hydraulics Laboratory staff on a Job

Hazard Analysis and provide safety barriers to restrict access to work areas.

v. Contractor must coordinate with the Hydraulics Laboratory staff to minimize disruption of ongoing work in the laboratory during removal and installation of the new pumping unit.

5. Deliverables –

a. Removal and Disposal Plan

b. Safety Plan

c. Existing Equipment Measurements and Verifications

d. Installation Plan, to include, but not limited to:

i. Pumping Unit: Refer to 33 12 71 – Vertical Turbine Pumping Unit

ii. VFD

iii. Electrical

e. Commissioning Plan and Report

i. Refer to 33 12 71 – Vertical Turbine Pumping Unit

f. Pumping Unit Documentation

i. Pump Riser Calculations and Drawing

ii. Manufacturer’s Technical Data

1. Pump and Motor Datasheets

iii. Variable Speed Pump Curves

g. VFD Documentation

i. Manufacturer’s Technical Data.

1. VFD Datasheets

ii. Schematic diagram, wiring diagram, equipment layout, nameplate list, and bill of materials.

h. Operations and Maintenance Manual

i. Pumping Unit: Refer to 33 12 71 – Vertical Turbine Pumping Unit

6. Information Sessions –

a. One 1-hour on-site visit will be held at Bureau of Reclamation’s Hydraulics

Laboratory at the Denver Federal Center in Denver, CO. This visit will provide vendors with the opportunity to see the site and equipment in person, take measurements as needed, and ask clarifying questions. This site visit will be scheduled on July 28, 2026, at 10:00 am MD.

b. Parties planning to attend the site visit must send the company name and name of attendee(s), phone number, and email addresses by email to: Aubrie Watson (Aubrielle_watson@ios.doi.gov) by COB on July 24, 2026.

Directions and information to the Hydraulics Laboratory:

• The Denver Federal Center is a secured campus and visitors will need to go through two security check points. The first will be at the Denver Federal Center Gate 1 Entrance in Denver, CO. Each individual will need a government issued photo ID (i.e., REAL ID driver license or passport). No weapons are permitted on campus.

• Visitors will continue to Building 56 on the Denver Federal Center.

o Continue on Main street o Turn right on 6th Street o Building 56 is on the right side of the street. Park anywhere near the building.

• Enter the lobby of Building 56 and show your ID to receive a visitors’ badge.

• Erin Connor, Contracting Officer’s Representative and/or Josh Mortensen, Technical

Point of Contact, will meet vendors in the lobby of Building 56.

https://www.google.com/maps/place/Denver+Federal+Center+(Gate+1)/@39.7155676,-105.1117809,477m/data=!3m2!1e3!4b1!4m17!1m10!4m9!1m3!2m2!1d-105.113277!2d39.7165007!1m3!2m2!1d-105.1225655!2d39.7226545!3e0!3m5!1s0x876b8167f63663f9:0xce9dcaf78730e99a!8m2!3d39.7155664!4d-105.1110154!16s%2Fg%2F11fp8950qm?entry=ttu https://www.google.com/maps/place/Denver+Federal+Center+(Gate+1)/@39.7179171,-105.1210541,1134m/data=!3m1!1e3!4m17!1m10!4m9!1m3!2m2!1d-105.113277!2d39.7165007!1m3!2m2!1d-105.1225655!2d39.7226545!3e0!3m5!1s0x876b8167f63663f9:0xce9dcaf78730e99a!8m2!3d39.7155664!4d-105.1110154!16s%2Fg%2F11fp8950qm?entry=ttu

• Visitors should plan on arriving a few minutes early as we will start promptly at the designated times.

7. Place of Performance –

Bureau of Reclamation Denver Federal Center (6th Avenue and Kipling Street) Building 56 – Hydraulics Laboratory Denver, CO 80225

8. Period of Performance – Twelve (12) months after award.

9. Work Hours – Normal work hours are Monday through Friday (except federal holidays) 7:30 a.m. to 4:00 p.m. Hours outside of this window, or overtime, are not permitted without the express written consent of the Contracting Officer.

10. Security – All service locations under this contract are within secured areas. The Contracting

Officers Representative (COR) shall arrange for Contractor’s entry into such areas and inform Contractor of security procedures. Contractor shall comply with all security procedures. Contractor shall supply Reclamation with the legal names of all employees who will be working under this contract. Reclamation reserves the right to perform security checks on such employees. If, in the judgment of Reclamation, any employee fails to meet minimum security requirements or proves to be detrimental to the security of Reclamation’s facilities, Contractor, upon request, shall remove such employee from any work under this contract. If on-site work is expected to extend beyond 5 working days, the contractor must promptly begin the badging process at the time of notice to proceed including a background investigation and fingerprinting. Please allow a minimum of 30 days to complete the badging process. Extensions will be granted for unforeseen conditions and other factors outside of the contractor’s control at the Contracting Officer’s discretion.

11. Photos and Drawings of Existing Equipment –

Figure 1. The pump curve of total dynamic head (ft) and flow (gpm) of the existing pump.

Figure 2. Nameplate of the existing 7-stage vertical turbine pump to be replaced.

Figure 3. Nameplate of the existing 250 hp motor to be replaced.

Figure 4. Photograph of the existing pump and motor to be replaced.

Figure 5. Photograph of pump and motor to be replaced. Discharge line is to the left.

Figure 6. Photograph of the existing multi-stage column of the turbine beneath the grating and frame that holds the pump and motor above the sump.

Figure 7. Photograph of the existing multi-stage column of the turbine beneath the grating and frame that holds the pump and motor above the sump.

Figure 8. Photograph of the existing multi-stage column of the turbine with basket on the intake.

Figure 9. I-Beam frame that supports the pump base plate, pump riser, and pumping unit (looking south).

Figure 10. I-Beam frame that supports the pump, pump riser, and pumping unit (looking east).

Figure 11. I-Beam frame that supports the pump, pump riser, and pumping unit (looking north).

Figure 12. Profile view of the existing pump and motor relative to the laboratory sump. Note: Placement of pump and motor will require machinery with an approximate 8.5 ft reach over metal grating to the installation location.

Figure 13. Profile view of the existing pump and motor relative to the frame.

Figure 14. Plan view of the existing pump and motor relative to the base plate.

Figure 15. Plan view of the existing pump and motor relative to the frame.

File details come from the government source that posted it. Updated .