E9_(2006-12)_3216B685_power_and_lighting_-_FIO_0001.pdf

PDF 262 KB Posted

Attached to
BGNDRF RESEARCH INTERNET UPGRADE
Solicitation number
140R4026Q0048
Issued by

About this file

This is an electrical site plan for Area 4 of the Tularosa Basin National Desalination Research Facility, prepared in December 2006 by Malcolm Pirnie, Inc., serving as the engineer/architect. The plan depicts the power and lighting infrastructure for the facility at a scale of 1 inch equals 30 feet, with the site plan noted as "For Information Only."

The document shows the existing electrical systems and infrastructure within the designated area, including communications manholes (marked with red circles) and an empty communications manhole. The plan identifies the approximate location of the Tularosa Basin Fiberoptic system. The drawing includes detailed callouts for existing utilities, lighting elements, analyzer equipment, and various site features. Additional notes reference existing elements, heavier lines indicating elements that are "lighter lines" for existing conditions, and references to tamper switch locations on FM backflow preventer connections. The plan also indicates areas designated for future expansion and large-scale testing, along with existing plumbing and analyzer systems. The document is a technical reference schematic for site infrastructure planning purposes rather than a procurement-related solicitation or contract document.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR INFORMATION ONLY

Communications manholes (red circles)

Empty communications manhole

Approximate location of Tularosa Basin Fiberoptic

Malynda Cappelle Oval

Malynda Cappelle Oval

Malynda Cappelle Oval

Malynda Cappelle Rectangle

File details come from the government source that posted it. Updated .