Amendment_1-_Clarifying_Questions_and_Answers_0001.pdf
PDF 70 KB Posted
- Attached to
- RG-AIS DECONTAMINATION PRESSURE WASHER Federal contract opportunity
- Solicitation number
- 140R4024Q0075
About this file
This document is an Amendment to a Solicitation, specifically Amendment 1 to Solicitation 140R4024Q0075 for a RG-AIS Decontamination Pressure Washer. The amendment clarifies questions and answers related to the solicitation. Key details:
The solicitation specifies the pressure washer is to be powered by a gasoline fueled engine, not a gasoline fueled generator. The government states only one unit is required, not two. The solicitation allows offerors to include technical sheets in addition to the completed Price Schedule (Attachment 2) as required by the Combined Synopsis. The procurement is being conducted by the Department of the Interior Bureau of Reclamation, a civilian federal agency. No other details about the specific product requirements, timeline, or pricing terms are provided in this amendment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_2-_Clarifying_Questions_and_Answers_2_0002.docx | DOCX document | |
| Sol_140R4024Q0075_Amd_0002.pdf | ||
| VERSION_3_Specifications_for_the_trailer-mounted_pressure_washer_with_tank_0002.docx | DOCX document | |
| Sol_140R4024Q0075_Amd_0001.pdf | ||
| Attachment_2-_Price_Schedule.docx | DOCX document | |
| Sol_140R4024Q0075.pdf | ||
| Attachment_1-_Technical_Specifications_Sheet.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 1- Clarifying Questions and Answers
140R4024Q0075 RG-AIS Decontamination Pressure Washer
Question 1: On the actual bid sheet (Attachment 2) you state: "The pressure washer is powered by a gasoline fueled generator, with a diesel heated burner." May we assume by gasoline fueled generator you mean a gasoline fueled engine?
Answer 1: Yes. Generator means engine in this case.
Question 2: Would it be ok to use 2 units for this bid? Reason being is it will bring costs down and lower maintenance required over time by not having to split the outgoing valves.
Answer 2: No, just the one unit.
Question 3: Is it acceptable to add a technical sheet to the price schedule?
Answer 3: Yes, it is acceptable to add technical sheets but please make sure to include a completed Attachment 2- Price Schedule as per the Combined Synopsis solicitation.