Price_Schedule_B-AMD0002_0002.pdf

PDF 136 KB Posted

Attached to
Leadville Water Treatment Plant
Solicitation number
140R4023R0011
Issued by

View the file

Other files

File Type Posted
2_-_LMDT-WTP_Field_Investigation_Travel_Report_0003.pdf PDF
DB-_Building_0003.pdf PDF
1_-_Geotechnical_Recommendations_2022__7-6-2022_FINAL_0003.pdf PDF
Summary_of_changes_-_0003_0003.pdf PDF
4_-_Test_Pits_at_LMDT_WTP_Leadville__CO_Travel_Report_0003.pdf PDF
3_-_Leadville_Mine_Drainage_Tunnel-Preconstruction_Geologic_Design_Data_Water_Treatment_Plant_0003.pdf PDF
DB-_Heavy_0003.pdf PDF
5_-_TM-85-832000-2020-15_PhaseII_SRT-ERT_Leadville-WTP_FINAL-RDM_0003.pdf PDF
Sol_140R4023R0011_Amd_0003.pdf PDF
140R4023R0011_RFP_27June23_0003.pdf PDF
Amendment_0002_Description_of_changes_0002.pdf PDF
Drawings-AMD0002_0002.pdf PDF
Questions_11_Amendment_0002_0002.pdf PDF
Specs-AMD0002_0002.pdf PDF
Sol_140R4023R0011_Amd_0002.pdf PDF
Leadville_WTP_Visit_Information_(1)_0001.pdf PDF
Sol_140R4023R0011_Amd_0001.pdf PDF
Pre-bid_Site_Visit_LMDT_WTP_Prebid_Presentation_-_TSC_0001.pptx PPTX presentation
Sign-in_Sheet_0001.pdf PDF
140R4023R0011-_Questions_1-10_Amendment_1_0001.pdf PDF
Attachment_21_-_00_00_02_Drawings_1261-1307_11x17_LeadvilleWTP_09-16-2022_0001.pdf PDF
Attachment 15_Dwgs-Info_1001-1100_11x17_Set5_091622.pdf PDF
Attachment___2_Specifications2.pdf PDF
RFP_17APR23.pdf PDF
Attachment 7 Specifications.pdf PDF
Attachment__10_Drawings_401-678_11x17_040323.pdf PDF
Attachment__17_-_Past_Performance_Questionnaire.pdf PDF
Attachment___3_Specifications3.pdf PDF
Attachment 9_Drawings_201-400_11x17_040323.pdf PDF
Attachment___20_-_Wage_Determination.pdf PDF
Sol_140R4023R0011.pdf PDF
Attachment 13_Dwgs-Info_801-875_11x17_Set3_091622zip.pdf PDF
Attachment 8_Drawings_001-200_11x17_040323.pdf PDF
Attachment___1_Specifications1.pdf PDF
Attachment__18_-_Project_Experience_Form.docx DOCX document
Attachment 14_Dwgs-Info_876-900_11x17_Set4_091622zip.pdf PDF
Attachment__5_Specification5.pdf PDF
Attachment 11_Dwgs-Info_679-745_11x17_Set1_091622.pdf PDF
Attachment___4_Specifications4.pdf PDF
Attachment 12_Dwgs-Info_746-800_11x17_Set2_091622zip.pdf PDF
Attachment 16_Dwgs-Info_1101-1260_11x17_Set6_091622.pdf PDF
Attachment__19_-_Subcontracting_Plan_Template.docx DOCX document
Attachment 6 Specifications6.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Leadville Mine Treatment Plant and Facilities Water Treatment Plant Replacement Amendment No. 0002 Leadville Mine Drainage Tunnel Project, Colorado Solicitation No. 140R4023R0011

Price Schedule Revised B - 1

SECTION B – SUPPLIES OR SERVICES AND PRICES

LEADVILLE MINE TREATMENT PLANT AND FACILITIES

WATER TREATMENT PLANT REPLACEMENT

LEADVILLE MINE DRAINAGE TUNNEL PROJECT, COLORADO

B.1 PRICE SCHEDULES

(a) Offers will be considered for award on the following Price Schedules, but no offer will be considered for award on only part of the Price Schedules:

(1) Offerors shall complete Price Schedules 1 and 2. Offers for less than the total of Schedules 1 and 2 will be considered nonresponsive and will not be evaluated for award.

(2) Government will award Price Schedule 1. Price Schedule 2 will be awarded depending on available funds.

(b) Offers are subject to terms and conditions of this solicitation.

(c) Quantities in the Price Schedules are estimated quantities for comparison of offers only.

Except as provided in contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against Government for overruns or underruns. Contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump-sum items.

(d) See contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.

(e) Definitions:

(1) CLIN – Contract Line-Item Number

PRICE SCHEDULE 1

CLIN Section Supplies or Services Quantity and Unit

Unit Price

Amount

1-1 WBR

1452.232 -81

Mobilization and Preparatory Work

For the lump-sum of $

1-2 01 64 40 Government-Furnished Products – Solids Contact Clarifier Equipment

For the lump-sum of $

1-3 01 64 40 Government-Furnished Products – Membrane Filtration System

For the lump-sum of $

Revised B - 2

PRICE SCHEDULE 1

CLIN Section Supplies or Services Quantity and Unit

Unit Price

Amount

1-4 01 64 40 Government-Furnished Products – Filter Presses

2 Ea $ $

1-5 02 41 00 Demolition of Existing Installations

For the lump-sum of $

1-6 05 12 10 Water Treatment Plant (WTP) Facility and Appurtenant Works

For the lump-sum of $

1-7 07 41 13 Pre-Insulated Metal Roof Panels Warranties

For the lump-sum of $

1-8 08 71 00 Door Hardware Heavy-Duty Electric Strikes Warranty

For the lump-sum of $

1-9 23 09 23 Direct Digital Control (DDC) System – HVAC Warranty

For the lump-sum of

1-10 23 52 00 Heating Boilers Warranty For the lump-sum of

1-11 31 23 10 Excavation 36,000 yd3 $ $

1-12 31 23 10 Compacted Backfill 11,000 yd3 $ $

1-13 31 23 10 Gravel Fill 4,800 yd3 $ $

1-14 31 23 10 Type L Riprap 64 yd3 $ $

1-15 31 23 10 Gravel Surfacing 325 yd3 $ $

1-16 31 23 10 Base Course 430 yd3 $ $

1-17 31 25 10 Erosion Control Blanket 2,800 yd2 $ $

1-18 32 32 00 Retaining Wall Monitoring Plan

For the lump-sum of $

1-19 32 92 20 Hydromulch Seed Mix 4,100 yd2 $ $

1-20 33 05 21 Bored Utility Crossing For the lump-sum of $

1-21 33 11 14 Reinforced Concrete Pressure Pipe

For the lump-sum of $

1-22 33 11 17 PVC Gravity Drain 1,934 lin ft $ $

1-23 33 11 18 8-inch Line Pipe 980 lin ft $ $

Revised B - 3

TOTAL FOR PRICE SCHEDULE 1 $_________________

OPTIONAL PRICE SCHEDULE 2 – Holding Pond Relining

CLIN Section Supplies or Services Quantity and Unit

Unit Price

Amount

2-1 31 32 30 Liner System Preparation For the lump-sum of $

2-2 31 32 30 Liner System 3,200 yd2 $ $

TOTAL FOR OPTIONAL PRICE SCHEDULE 2 $_________________

END OF SUPPLIES OR SERVICES AND PRICES

Revised B - 4

This page intentionally left blank.

File details come from the government source that posted it. Updated .