Drawings-AMD0002_0002.pdf
PDF 3 MB Posted
- Attached to
- Leadville Water Treatment Plant
- Solicitation number
- 140R4023R0011
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D ig ita lly s ig ne d by B ru ce
B ar ke y
D at e:
.0
6.
:2
0:
-0 6'
D ig ita lly s ig ne d by B ru ce
B ar ke y
D at e:
3.
.0
:1 9:
-0
6'
G G
G
E
E
E
E
E
E
E
E
E E
E
E
E
E
E
E
ST
ST
ST
ST
ST
ST
W
W
W
W
W
W
W
W
W
W
W
W
W
C om
C om
Com
Com
E
G
G
G
G
G
G
G
G G G G G G G G
G
G
G
G
G
G
G
G G
G
Com
Com
Com
Com Com
Com Com
Com Com
Com
Com
Com
Com
Com
Com Com
Com
ST
ST
ST
ST
ST
ST
ST
ST
ST
W
W
W
W
W
W
W
W
ST
ST
ST
ST
ST ST
S T
W
W
ST
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
W
E
F
F
F
F
F
Com Com Com Com
Com
Com
Com
W
W
Com
Com
E
E
E
W
W
W
ST
ST
ST
Existing River Road (CR91b)
WTP BUILDING
TO BE REMOVED Storage building to be removed
Ex ist ing
.0
0' ea se men t
N:1526341.45 E:2778384.74
Remove fence to the east N:1526208.31 E:2778482.45
Remove existing sanitary sewer to the east.
See Note 6 for sanitary removal to the north.
N:1526348.03 E:2778420.89
N:1526479.77 E:2778286.62
N:1526593.69 E:2778302.27
Remove fence to the east N:1526622.04 E:2778450.80
10000
10010
10015
10020
10010
59975 9980
10005
10010
10015
10020
10025
90 9995
21.00' Water easement
N:1526240.54 E:2778433.53
El. 9993.02
ALUM CAP STN7 TPS ELEV
N:1526636.70 E:2778403.65
El. 9971.78
BRASS CAP ISDI BOM 9967.12
DH-21-1
DH-21-2
Holding pond.
See (61299-61303) for pond improvements. See specifications for re-lining information.
Mine drainage tunnel entrance to remain
Pond pump house to be renovated RE: Structural & Mech
Property line
Gravel surfacing to remain
Gravel surfacing to be removed
See Note 1Concrete to be removed
Concrete to be removed
Gravel surfacing to be removed to the hatching extents shown
Concrete to be removed
Concrete spillway to remain
Gravel surfacing to remain
Gravel access road to remain
Gravel surfacing to remain
Remove gravel surfacing to the north
Remove gravel surfacing to the east
Gravel surfacing to remain
Gravel surfacing to be removed
Gravel/ unpaved drive to be removed
Remove gravel surfacing to the west
Road to remain
Road to remain
Overhead electric line to remain
Inlet to remain
Property Line
Fence to remain
Fence to be removed
Influent lines to remain
Storm inlet to be removed
Gas line to be relocated by Xcel
See Note 1
Gas line to be relocated by XCEL
Leach field to be removed
Sanitary wet well to be removed
Electric & communications line to be removed.
Re: Electrical
Remove 6" PVC foundation drain to the east
Emergency warning system to remain
Re: Elec for electrical connection
See specifications for influent line removal phasing
Existing septic tank, see Note 6
Emergency warning system to remain
Re: Elec for electrical connection
Power pole to remain
Swing gate to remain
Aspen trees to remain
Flag pole to be relocated
Fuel storage tank to be relocated
Container building to be relocated
Electrical equipment to be removed
Remove shed
Container building to be relocated
Communication box to be removed
Existing fiber optic line to remain
Grated manhole to remain
Inlet to remain
Existing storm sewer
Existing foundation drain outlet pipe
Existing effluent line
Existing dewatering manhole to remain, see
Note 8 & (60570)
Contractor to verify existing location and elevation of 6" PVC outfall prior to construction.
See storm plans for storm sewer removal limits
Power pole to remain
Existing signs to remain
Existing gate to be removed and replaced
Power pole to remain
Remove gravel surfacing to the east
Concrete to be removed
Gravel surfacing to be removed
NOTES
1. Existing grading and site layout information shown are based on plans for the early grading phase of the project.
Existing grades shown on the plan may vary from field conditions.
2. Contractor to verify existing grades and horizontal & vertical locations of utilities prior to the start of construction in accordance with the specifications. Notify Government of any conflicts or discrepancies immediately.
3. The engineer assumes no responsibility for buried utilities. The contractor is responsible for locating and protecting all utilities prior to and during construction.
4. Limits of removal are approximate.
5. Trees and natural foliage are not shown.
6. Location of the existing septic tank has not been field verified. Remove the existing septic tank and service line to the north once the new water treatment plant's sanitary sewer facilities are operational.
7. See specifications for additional demolition information.
8. Adjust manhole rims, inlet grates, valve boxes, and electrical boxes to final finished grade unless otherwise specified, see specifications for information.
9. All material that is demolished shall be legally disposed of off-site.
10. See specifications for sequencing of the existing water treatment plant and utility demolition.
11. Refer to specification Section 02 41 00 - Demolition.
12. Existing bollards to be removed unless otherwise specified.
13. Work inside of this perimeter to use Building wage determination rates. All other areas of work to use Heavy Civil wage determination rates.
PLAN - EXISTING CONDITIONS AND DEMOLITION
SCALE: 1"=30'
A
LW
A
YS
T H
IN
K
S A
FE
TY
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
0S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
-E X
IS
TI
N
G C
O N
D
IT
IO
N
S A
N D
D
EM
O
LI
TI
O
N P
LA
N
_2
4.
D
W G
LA
S T
S A V
ED
D A
TE
-0 8-
LA
S T
S A V
ED
B Y
B Z O
O K
LE
A D
V
IL
LE
M
IN
E
D R A
IN
A G
E
TU
N N
EL
LE
A D
V
IL
LE
C O
LE
A D
V
IL
LE
M
IN
E
TR
EA
TM
EN
T
PL
A N
T A N
D F
A C
IL
IT
IE
S W
A
TE
R T
R
EA
TM
EN
T
PL
A N
T R
EP
LA
C
EM
EN
T
CIVIL
DENVER, CO 2022-08-26
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -Plant Structures Group
David Kresin, P.E.
Sterling Westfall, P.E.
EXISTING CONDITIONS
AND DEMOLITION PLAN
1335-D-60558 0 60'30'
Fence
LEGEND
Gas Line
SS
ST
W
G
Electric Line
Sanitary Sewer
Storm Sewer
Influent/Effluent Water
Com F Fiber Optic Line
Communication Line
Overhead Electric Cable
SS
ST
W
G
Com
F
Existing Demolition
Easement Property Line
E
OC OC
E
.0
0'
Wage Determination, see note 13
R
EV
N O
S
TA
D
-0 6-
B
Z O
O K
P.
E.
A dd ed W ag e
D et er m in at io n
B ou nd ar y
BR
IA
N
Z O
O K
D ig ita lly s ig ne d by B
RI
A
N
ZO
O
K D at e:
3.
.0
:0
0:
-0
6'
| 001_1335-D-60553_Rev2 |
| 002_1335-D-60554_Rev2 |
| 006_1335-D-60558_Rev2 |
| 133_1335-D-60629_Rev2 |
| 136_1335-D-60632_Rev2 |
| 137_1335-D-60633_Rev1 |
| 139_1335-D-60635_Rev2 |
| 140_1335-D-60636_Rev1 |
| 141_1335-D-60637_Rev1 |
| 142_1335-D-60638_Rev1 |
| 149_1335-D-60645_Rev1 |
| 155_1335-D-60651_Rev1 |
| 158_1335-D-60654_Rev1 |
| 159_1335-D-60655_Rev1 |
| 160_1335-D-60656_Rev1 |
| 162_1335-D-60658_Rev2 |
| 1335-D-60553 ShtNo Rev2: 1 |
| 1335-D-60554 ShtNo Rev2: 2 |
| 1335-D-60558 ShtNo Rev2: 6 |
| 1335-D-60629 ShtNo Rev2: 133 |
| 1335-D-60632 ShtNo Rev2: 136 |
| 1335-D-60633 ShtNo Rev1: 137 |
| 1335-D-60635 ShtNo Rev2: 139 |
| 1335-D-60636 ShtNo Rev1: 140 |
| 1335-D-60637 ShtNo Rev1: 141 |
| 1335-D-60638 ShtNo Rev1: 142 |
| 1335-D-60645 ShtNo Rev1: 149 |
| 1335-D-60651 ShtNo Rev1: 155 |
| 1335-D-60654 ShtNo Rev1: 158 |
| 1335-D-60655 ShtNo Rev1: 159 |
| 1335-D-60656 ShtNo Rev1: 160 |
| 1335-D-60658 ShtNo Rev2: 162 |