This document contains two price schedules for quarry and mining services at the Section 7 and Agnes Wilson Quarries. The schedules include line items for standard move-in costs, crushing material to gravel size, loading, weighing, hauling and stockpiling gravel, establishing and maintaining access and haul roads, preparing and implementing stormwater pollution prevention plans, providing qualified biological monitors, and other services. The schedules specify the estimated quantities of each line item, unit prices, and total costs. For the Section 7 Quarry, the contractor will deliver a total of 7,400 tons of gravel to two specified stockpile sites within 90 days of the notice to proceed. For the Agnes Wilson Quarry, the contractor will deliver a total of 7,500 tons of gravel to two specified stockpile sites between March 1, 2023 and May 30, 2023. The related federal contract opportunity is solicitation number 140R3022Q0064 from the Department of the Interior Bureau of Reclamation for quarry and mining services at the Section 7 and Agnes Wilson Quarries.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140R3022Q0064/0004 – Attachment 3 Price Schedule

Section 7 and Agnes Wilson Quarries Price Schedule

Section 7 Quarry

Item

No.

Service

Estimated

Quantity

Unit

Unit Price

Total Cost

1-1

Standard move-in to designated quarry.

job

1-2

Crush 1- to 4-inch material to gravel size

7,400 tons

1-3 Load, weigh, haul, & stockpile gravel 66,600 ton-miles

1-4

Establishing or reestablishing Maintaining access roads, and haul roads, that are heavily damaged that need excavation, material, blading, and watering. (Per miles)

3.2 mi.

1-5 Establishing or reestablishing Maintaining roads inside the quarry that need routine blading and water. (Per miles) 2 mi.

1-6 Prepare, submit and implement Storm water Pollution Prevention Plan (SWPPP)

1 Ea.

1-7 Prepare and Submit NOI to EPA 1 Ea.

1-8 Provide qualified Biologist as project monitor for designated quarries

Del.

Order

Total of Cost

Contractor will deliver the gravel as indicated in CLNN’s 1-3 to stockpile site C253.8 and C248.7.

Performance shall be completed 90 Days After Notice to Proceed Award.

Stockpile site C253.8 will have a total of 3,700 ton delivered to it and Stockpile site C248.7 will have a total of 3,700 ton delivered to it.

Total tons of gravel delivered will be 7,400 tons out of the Section 7 Quarry.

140R3022Q0064/0004 – Attachment 3 Price Schedule

Agnes Wilson Quarry

Item

No.

Service

Estimated

Quantity

Unit

Unit Price

2-1

Standard move-in to designated quarry.

job

2-2 Crush 1- to 4-inch material to gravel size 7,500 tons

2-3

Load, weigh, haul, & stockpile gravel 70,500 ton-miles

2-4

Establishing or reestablishing Maintaining access roads, and haul roads, that are heavily damaged that need excavation, material, blading, and watering. (Per miles)

1.5 mi.

2-5 Establishing or reestablishing Maintaining roads inside the quarry that need routine blading and water. (Per miles)

1.5 mi.

2-6 Prepare, submit and implement Storm water Pollution Prevention Plan (SWPPP)

1 Ea.

2-7 Prepare and Submit NOI to EPA 1 Ea.

2-8 Provide qualified Biologist as project monitor for designated quarries

Del.

Order

Contractor will deliver the gravel as indicated in CLNN’s 2-3 to stockpile site A174.3 and A162.5.

Performance will commence on March 1, 2023 and be completed by May 30, 2023.

Stockpile site A174.3 will have a total of 3,000 ton delivered to it and Stockpile site A162.5 will have a total of 4,500 ton delivered to it.

Total tons of gravel delivered will be 7,500 tons out of the Agnes Wilson Quarry.