This document contains two price schedules for quarry and mining services at the Section 7 and Agnes Wilson Quarries. The schedules list estimated quantities and unit pricing for services including crushing material to gravel size, loading, hauling, and stockpiling gravel, and establishing or reestablishing access roads. The total estimated quantity of gravel to be delivered from Section 7 Quarry is 7,400 tons to two stockpile sites by December 2022. The total estimated quantity from Agnes Wilson Quarry is 7,500 tons to two stockpile sites between March 2023 and May 2023. The related federal contract opportunity is solicitation number 140R3022Q0064 from the Department of the Interior Bureau of Reclamation for quarry and mining services at the specified quarries. Pricing and delivery details are provided for required products and services.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140R3022Q0064/0003 – Attachment 3 Price Schedule
Section 7 and Agnes Wilson Quarries Price Schedule
Section 7 Quarry
Item
No.
Service
Estimated
Quantity
Unit
Unit Price
Total Cost
1-1
Standard move-in to designated quarry.
job
1-2
Crush 1- to 4-inch material to gravel size
7,400 tons
1-3 Load, weigh, haul, & stockpile gravel 111,000
66,600 ton-miles
1-4
Establishing or reestablishing access roads, and haul roads, that are heavily damaged that need excavation, material, blading, and watering. (Per miles)
3.2 mi.
1-5 Establishing or reestablishing roads inside the quarry that need routine blading and water. (Per miles)
2 mi.
1-6 Prepare, submit and implement Storm water Pollution Prevention Plan (SWPPP)
1 Ea.
1-7 Prepare and Submit NOI to EPA 1 Ea.
1-8 Provide qualified Biologist as project monitor for designated quarries
Del.
Order
Total of Cost
Contractor will deliver the gravel as indicated in CLNN’s 1-3 to stockpile site C253.8 and C248.7.
Performance shall be completed 90 Days After Award.
Stockpile site C253.8 will have a total of 3,700 ton delivered to it and Stockpile site C248.7 will have a total of 3,700 ton delivered to it.
Total tons of gravel delivered will be 7,400 tons out of the Section 7 Quarry.
140R3022Q0064/0003 – Attachment 3 Price Schedule
Agnes Wilson Quarry
Item
No.
Service
Estimated
Quantity
Unit
Unit Price
2-1
Standard move-in to designated quarry.
job
2-2 Crush 1- to 4-inch material to gravel size 7,500 tons
2-3
Load, weigh, haul, & stockpile gravel
157,500
70,500 ton-miles
2-4
Establishing or reestablishing access roads, and haul roads, that are heavily damaged that need excavation, material, blading, and watering. (Per miles)
1.5 mi.
2-5 Establishing or reestablishing roads inside the quarry that need routine blading and water. (Per miles)
1.5 mi.
2-6 Prepare, submit and implement Storm water Pollution Prevention Plan (SWPPP)
1 Ea.
2-7 Prepare and Submit NOI to EPA 1 Ea.
2-8 Provide qualified Biologist as project monitor for designated quarries
Del.
Order
Contractor will deliver the gravel as indicated in CLNN’s 2-3 to stockpile site A174.3 and A162.5.
Performance will commence on March 1, 2023 and be completed by May 30, 2023.
Stockpile site A174.3 will have a total of 2,640 3,000 ton delivered to it and Stockpile site A252.6 A162.5 will have a total of 3,960 4,500 ton delivered to it.
Total tons of gravel delivered will be 6,600 7,500 tons out of the Agnes Wilson Quarry.