140R2026Q0079__Amendment_0002_0002.pdf
PDF 593 KB Posted
- Attached to
- LB East Side Road Fence Repairs
- Solicitation number
- 140R2026Q0079
About this file
This is an Amendment to a Solicitation/Modification of Contract (Standard Form 30) for fence repair services at Lake Berryessa Field Office in California, issued by the Bureau of Reclamation's Mid-Pacific Region, Division of Acquisition Services. The amendment, effective June 24, 2026, modifies solicitation number 140R2026Q0079 and updates the attached Statement of Work regarding fence repairs damaged in the 2020 LNU Lightning Complex Fire.
The Statement of Work outlines a 90-day project to repair and replace approximately six miles of barbed-wire fencing along East Side Road using fire-resistant materials complying with NRCS standards. Primary deliverables include repairing or replacing damaged fence sections to match existing 4-strand or 5-strand configurations; maintaining 13 vehicular access gates; repairing one pedestrian chicane; replacing approximately 40 corner posts and 20 braces; correcting gaps at approximately 20 stream-crossings; and repairing seven miles of northeastern boundary fence. The contractor must supply approximately 1,850 posts and 185,000 feet of wire, clear vegetation for safe access, install quarter-mile interval signage, and provide a one-year warranty on all work. Work is scheduled at Lake Berryessa Field Office, 5520 Berryessa Knoxville Road, Napa, California 94558, with equipment staging at the Eticuera Day Use Area. Environmental protection requirements include Worker Environmental Awareness Training, pre-construction biological surveys for California red-legged frogs and Keck's checker-mallow, a 10-mile-per-hour speed limit, suspension of work during or 24 hours following rainfall events exceeding ¼-inch, and vehicle/equipment decontamination to prevent invasive species spread. The Government furnishes padlock keys for site access; the contractor supplies all other tools, materials, and transportation.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| ������������� | |
| � | ��������� |
| �� |
| ����� | ���������� |
| ���� | ������� |
| ����������� | � |
| ��� | ������ |
| ��� | �� | ��������� |
| �� |
| � | ||
| ������ ��!"#$%&'��!�(�%&�")*+�,$'-./'+0�0���'�&')'#1'-�"0�02'�3$")'�-'4#.+"0'-�!�&�02'�&')'#30��!��!!'&4�3&#�&�0��02'�2�%&�"+-�-"0'�43')#!#'-�/"(�&'4%$0�#+�&'5')0#�+��!�(�%&��!!'& ��#�����6�� | ������ | ���� |
�����6������
| ��� | �� | ��������� |
| �� |
����������6��������� �� ������
78��9:;<=>?@>A� ���� � ���� �����B������� �������� �� ��������
?:7@C:7@>�<D�E<F9G9>?>9<@H:<C9D9G?>9<@�<D�G<@>=?G> � ��)�+0&")0�#-�)�-'I ��"/'+-/'+0J/�-#!#)"0#�+�+%/�'& K ��'!!')0#1'�-"0' L ��&'M%#4#0#�+J3%&)2"4'�&'M%#4#0#�+�+%/�'& � ��3&�5')0�+%/�'&�NOP�QRRSTUQVSWXY "-/#+#40'&'-��(�NOP�Z[\W]�[\Q̂�O[W_�̀X)�-'
E>?@C?=C�D<=:�ab�c=7d8�eeHfbegh�3�������������.4"�!"&��L��)!&���K ILK
!")#$#0(�)�-' �i" ��"/'+-/'+0��!�4�$#)#0"0#�+�+%/�'&i� ��-"0'-�Njkk�Olkm�nnX�o" ��/�-#!#)"0#�+��!�)�+0&")0J�&-'&�+%/�'&�o� ��-"0'-�Njkk�Olkm�npXee8��>q9E�9>7:�<@Fr�?;;F97E�><�?:7@C:7@>E�<D�E<F9G9>?>9<@E���������0��� ��6��
| ���� | ���� | ��� |
| �# | ����L ����s | � |
� ��s �
�I ��"))�%+0#+.�"+-�"33&�3&#"0#�+�-"0"�NOP�]WtuT]WvX ���������� ��� w��������
| ����������� | �������������� | ��wea8��>q9E�9>7:�?;;F97E�<@Fr�><�:<C9D9G?>9<@E�<D�G<@>=?G>EH<=C7=E8�9>�:<C9D97E�>q7�G<@>=?G>H<=C7=�@x:y7=�?E�C7EG=9y7C�9@�9>7:�ez8)2')*��+'" ��02#4�)2"+.'��&-'&�#4�#44%'-�3%&4%"+0�0����NjRWUTP{�Qu[\Z]T[{X�02'�)2"+.'4�4'0�!�&02�#+�#0'/��L�"&'�/"-'�#+�02'�)�+0&")0��&-'&���������+%/�'&�#+�#0'/��o" � ��02'�"��1'�+%/�'&'-�)�+0&")0J�&-'&�#4�/�-#!#'-�0��&'!$')0�02'�"-/#+#40&"0#1'�)2"+.'4�N|uU\�Q|�U\Q̂}W|�T̂�RQ{T̂}�ZPPTUW~�������QRR]ZR]TQ[TẐ�vQ[Q~�W[U���4'0�!�&02�#+�#0'/��L��3%&4%"+0�0��02'�"%02��(��!�!"&�LK �oK��� ) ��02#4�4%33$'/'+0"$�".&''/'+0�#4�'+0'&'-�#+0��3%&4%"+0�0��"%02��(��!�- ���02'&�NjRWUTP{�[{RW�ZP�_ZvTPTUQ[TẐ�Q̂v�Qu[\Z]T[{X |
| 's��� | � |
�����6����������
| �� | �� |
| ����� | ��������� |
| ������� |
| �# | ���i"�����o"�� |
| ������ | �������� |
������� ��) ��-"0'�4#.+'-��" ��+"/'�"+-�0#0$'��!�4#.+'&�Nl{RW�Z]�R]T̂[X ��) ��-"0'�4#.+'-��" ��+"/'�"+-�0#0$'��!�)�+0&")0#+.��!!#)'&�Nl{RW�Z]�R]T̂[X�L ��-'4)#�+��!�"/'+-/'+0J/�-#!#)"0#�+���]}Q̂T�Wv�V{�����|WU[TẐ�\WQvT̂}|~�T̂USuvT̂}�|ZSTUT[Q[TẐ�UẐ[]QU[�|uV�WU[�_Q[[W]��\W]W�PWQ|TVSW�X
3".'� ��#44%'-��( )�-' � ��+"/'�"+-�"--&'44��!�)�+0&")0�&�N�u_VW]~�|[]WW[~�UZû[{~�j[Q[W�Q̂v��O���ZvWX ���
��� ��)�+0&")0�&J�!!'&�&NjT}̂Q[u]W�ZP�RW]|Ẑ�Qu[\Z]T�Wv�[Z�|T}̂X ��� ��%+#0'-�40"0'4��!�"/'&#)"NjT}̂Q[u]W�ZP��Ẑ[]QU[T̂}��PPTUW]X�]W�TZu|�WvT[TẐ�ûu|QVSW
3".'4�!
| � | |
| � | ��� |
0��������
| ����� | |
| � | ���������� |
| � |
¦§̈©ª§�«¬�©®̄ª°ª±²«³�µ́¶·̧¹ºµ»µº�¼½¾µ¿À�ÁÂÃÄÅÆÇÈ�ÉÊÊÄËÂ�ÌÍÎÍÏÍÐÑ�ÐÒ�ÓÔÕÖÍÏÍ×ÍÐÑ�ØÙÚÎÍÔÙÏ�ÛÜÝÝ�Þßààáâã�äáåæ�çßßè�éêëÜëì�íîïðîñòóôõ�ö������������� �
�"�����#�$�%&�''(� )*+,!��-./0.123�45��������� )+����!�67�889
����<6)9*98*86=*+9,<
>?@AB@BCD@@EFG@@@B� �
HIJ�KLMNONPQPNLR�ONPJS�NR�TMLOU�VW�QTLXJY�ZQUJ�[J\\]Ĵ Q̂�_Q̂P�KNSJ�̀LQS�aJROJ�̀JbQN\̂�N̂�IJ\JT]�QcJRSJSd�ef\bL̂Jg�HIJ�bf\bL̂J�Lh�PIN̂�QcJRScJRP�N̂�PL�NROL\bL\QPJ�PIJ�QPPQOIJS�\JXN̂JS�KPQPJcJRP�Lh�iL\UdHIJ�SQPJ�QRS�PNcJ�hL\�\JOJNbP�Lh�LhhJ\̂�N̂�IJ\JT]�jklmWkn_o�QRS�\JcQNR̂�pfM]�qY�qrqsY�QP�tqgrr�bdcd�HIJ�LhhJ\L\�cf̂P�QOURLuMJSvJ�PIN̂�QcJRScJRP�T]�f̂TcNPPNRv�Q�̂NvRJS�OLb]�Lh�PIN̂�Kawr�QMLRv�uNPI�PIJN\�b\LbL̂QMd xyz{�|�}~�|
Solicitation No.: 140R2026Q0079 – Amendment No. 0002
Lake Berryessa East Side Road Fence Repairs
Lake Berryessa Field Office - California
Statement of Work
1.0 Introduction
The Lake Berryessa Field Office has successfully applied for BIL-BAR 5-10 year Post Fire Recovery Funding in FY 25 and would like to use this funding to complete repairs of fence lines damaged in the 2020 fires. The fencing will aid in the definition of grazing plots and the recovery of riparian areas by implementing recommendations from a July 2008 Lake Berryessa East Side Grazing Management Plan.
2.0 Background
The Bureau of Reclamation created the reservoir of Lake Berryessa in the 1950’s as part of the Solano Project, authorized by the Reclamation Project Act of 1939 (53 Stat. 1187). Solano Irrigation District operates the Solano Project under an agreement with Reclamation, although the reservoir and surrounding land are federal lands managed by Reclamation. At capacity, Lake Berryessa stores 1.6 million acre-feet (af) of water and is one of the largest bodies of fresh water in California. The lake is 23 miles long by 3 miles wide and has 165 miles of shoreline.
In August of 2020, a series of spot fires ignited and converged to form the LNU Lightning Complex Fire which burned the northern-most, 400 acres of the former Lake Berryessa Wildlife Area as well as 60% of the Solano Project Lands around Lake Berryessa. The recovery resulted in several time-consuming employee and public safety projects. This workload, when combined with a sharp decline in field office staff post-pandemic and post-fire, meant that a project to address the rise in invasive plants, including black mustard, along the eastern shore of Lake Berryessa could not be addressed until now.
3.0 Scope
Contractor will repair or replace damaged fence sections to match the existing configuration, whether 4-strand or 5-strand. Repairs and replacements must restore the fence to the number of strands currently present at each location.
Contractor will maintain repair 13 vehicular access points by re-hanging gates and re-stringing wire where needed.
Contractor will repair one pedestrian chicane.
Contractor will replace failing or burned posts, corners (40) and braces (20) with fire-resistant materials.
Contractor will correct repair gaps in approximately 20 existing stream-crossings.
Contractor will repair and replace all remaining wood posts in seven miles of the barbed wire fence forming the northeastern boundary of the management parcels.
Contractor will clear vegetation as necessary to safely access the fence line and conduct repairs.
Contractor will install signage every quarter mile noting the U.S. Government property line. Every gate will feature a sign reminding guests of prohibited activities.
All work and materials will be covered by a 1 year warranty.
4.0 Applicable Documents
- Paddock Map
- 382A – Fence (standard wire), Conservation Practice Joh Sheet, NRCS
382ajs.doc (live.com)
- Accessible Gates Chicanes, USFS, G:\REV-STD-Standard Trail Plan
Drawings\pdfsetup\STD_942-50-01_Accessible_Chicanes Model (1) (usda.gov)
5.0 Tasks
5.1 Fence Repair and Replacement: Using NRCS standards or better, Contractor shall maintain repair existing 4-strand and 5-strand, barbed-wire fencing with fire resistant materials. It is estimated that the vendor will need to supply approximately 1850 posts and 185,000 feet of wire. NRCS standards include:
Steel Posts: Steele line posts shall be the “T”, “U”, or “Y” type with welded or riveted anchor plate near the bottom (minimum 18 inches square area) and have suitable corrugations, knobs, studs or grooves for fastening the wire. Line posts shall weigh at least 1.33 pounds per linear foot of length and shall be a minimum of
5.5 feet long.
Steel Pipe Posts: Steel pipe corner, gate, or brace posts shall be a minimum diameter of 2 inches, Schedule 40 (3.375-inch O.D.) and at least 7 feet long.
Bracing shall be a minimum of 1-1/2 inch nominal diameter, Schedule 40 pipe.
Brace fittings and clamps shall be galvanized.
Barbed Wire: Barbed wire shall be a single steel wire of 9-guage or heavier, two wrapped strands of 12.5-guage or heavier wire or 12.5-guage or heavier hi-tensile wire. Wire shall have a minimum tensile strength of 45,000 psi.
Stays: Wire stays shall be 9.5-guage or heavier, zinc coated, twisted wire. The length shall be at least two inches longer than the distance between the top and the bottom strands of the fence.
Post Depth: Line steel posts shall be set at a minimum depth of 1.5 feet and a maximum depth of 3 feet. Gate, corner, and brace posts shall be set to a minimum maximum depth of 3 feet, unless otherwise specified. Steel pipe and angle section posts shall be embedded in a 12-inch circular or square concrete pier, except when set in firm rock.
Post Spacing: The maximum post spacing interval shall be 20 feet.
Line Bracing: Line brace assemblies shall be located at all corners, gates, and abrupt changes in vertical topography (generally considered 15 degrees). On straight reaches of fencing line braces shall be installed at a spacing of no more than 1300 feet.
Wire Spacing: When measured from the groundline, a 5-strand fence will locate wires at 5 inches, 12 inches, 20 inches, 30 inches, and between 42-45 inches.
Where existing fencing is 4-strand, wire spacing must follow the existing layout and conform to NRCS standards for 4-strand designs.
Wire Fasteners: Fasteners on steel posts shall be snug enough to prevent vertical movement of the wire on the post.
5.2 Drainageways: In crossing drainageways or depressions, a weight or https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fefotg.sc.egov.usda.gov%2Freferences%2FDelete%2F2005-12-3%2F382ajs.doc&wdOrigin=BROWSELINK https://www.fs.usda.gov/recreation/programs/trail-management/documents/plans/trail_pdfs/STD_942-50-01_Accessible_Chicanes.pdf https://www.fs.usda.gov/recreation/programs/trail-management/documents/plans/trail_pdfs/STD_942-50-01_Accessible_Chicanes.pdf https://www.fs.usda.gov/recreation/programs/trail-management/documents/plans/trail_pdfs/STD_942-50-01_Accessible_Chicanes.pdf deadman anchor shall be fastened to the fence to maintain the required spacing interval or additional wires shall be added to maintain the required minimum wire height from the ground.
5.3 Replacement of Wooden Structural Posts As wood corner, gate, or brace pipes burn or rot in the existing fence line, Contractor shall replace wooden structural posts (corners, gates, or brace pipes) with steel pipes meeting the NRCS standards specified above.
5.4 Gate Repair: Contractor shall repair 13 vehicular access gates so that all gates swing freely and there are no gaps in in the adjacent fencing.
5.5 Pedestrian Access Chicane: Contractor shall repair a pedestrian access point with an accessible “U” chicanes using non-combustible materials adjacent to gate E1.
5.6 Contractor shall clear vegetation as necessary to safely access the fenceline and conduct repairs. Vegetation removal must comply with NEPA requirements for minimal ground disturbance, with grass cut just above the ground level and limited soil disturbance permitted.
6.0 Environmental Protection Requirements
This contract will need to enact conservation measures to protect the California red-legged frog (FRLF). Temporary ground disturbance could crush or injure individuals if CRLF occupies upland refugia or moist areas along fencelines.
Increased worker presence and equipment movement could temporarily displace frogs from movement corridors. Installing or repairing fence lines presents potential for direct effects to CRLF may include injury or death by being struck by equipment or entombed in burrows from soil disturbance. Most fenceline work would occur in upland areas less frequently used by CRLF except during wet season dispersal.
Project implementation would occur during dry season conditions to reduce the likelihood that CRLF will be present in the Project area.
Minimal ground disturbance (surface-level vegetation cutting; no soil disturbance except post holes).
6.1 Worker Environmental Awareness Training (WEAT)
Worker Environmental Awareness Training: Prior to the commencement of Project work, all Project personnel will attend an environmental awareness training coordinated and given by Reclamation staff. It will include; species descriptions and habitat needs, species status and protection under the Endangered Species Act, definition of take, reporting requirements, conservation measures to reduce project impacts, and instructions for encountering California Red-legged Frog (CRLF) and Keck’s checker-mallow in areas where take could occur.
Employees will sign a form stating that they received and understand the training.
Reclamation will maintain a list of personnel receiving the training.
6.2 Pre-Construction Biological Surveys
Prior to any ground disturbing activities, pre-construction biological surveys will be conducted by a Reclamation biologist in the action area for CRLF and Keck’s checker-mallow. Surveys will be conducted by a qualified biologist within 14 days prior to commencement of the work.
6.3 Wildlife Protection During Work
To reduce the potential for Project vehicles striking CRLF, a 10-mile-per-hour speed limit will be enforced at the site.
No work will occur during or 24-hours following a rain event. A rain event is to be considered precipitation of ¼-inch or more within a 24-hour period.
All Project personnel will be informed of the Action Area boundaries for Project activities. If necessary, flagging and/or staking may be used to define the Project area limits.
6.4 Vehicle and Equipment Decontamination
To prevent spread of invasive species, disease, or contaminants:
All equipment and vehicles shall be fully decontaminated prior to arriving on site.
Decontamination steps must be approved by Reclamation personnel.
7.0 Government Furnished Equipment
The Government will supply a copy of a padlock key so that the contractor may access the paddocks along East Side Road and Eticuera Day Use Area during the duration of the contract.
The Contractor will purchase the supplies needed to complete the work.
Contractor will supply all tools and transportation needed to complete the work.
8.0 Period of Performance
Period of Performance is 90 days from issuance of notice to proceed. All work is to be performed during the work week Monday through Friday exclusive of holidays.
9.0 Place of Performance
Contract is scheduled to occur at:
Lake Berryessa Field Office 5520 Berryessa Knoxville Road Napa, CA 94558
The contractor may stage equipment and supplies on the hardened surfaces of:
Eticuera Day Use Area 8600 Berryessa Knoxville Road Napa, CA 94558
The work will take place along six miles of East Side Road from its intersection with Berryessa Knoxville Road just north of Eticuera Day Use Area extending south to the southern extent of the 2020 LNU Lightning Complex Fire Burn Scar (38.632185835028, -122.23397247869522).