140R2020B0007 SF-30 Amendment 0003_0003.pdf

PDF 2 MB Posted

Attached to
Marble Bluff Coatings Phase II Federal contract opportunity
Solicitation number
140R2020B0007
Issued by
Department of the Interior Bureau of Reclamation

About this file

This solicitation package requests bids for a federal contract to perform Marble Bluff Coatings Phase II work. The solicitation involves blast cleaning and recoating various gates, guides, and structures at the Marble Bluff Fish Passage Facility. Work includes surface preparation, application of a vinyl-type zinc rich primer and vinyl resin intermediate and topcoats, installation of cathodic protection systems, and other tasks. Bids are due by August 28, 2020. The contractor will be required to obtain various permits and comply with environmental regulations, and control water pollution during construction activities. The period of performance is from notice to proceed through December 31, 2021. Pricing is to be provided using the lump sum and unit price schedule included in the solicitation package.

View the file

Other files for this federal contract opportunity

Other files attached to Marble Bluff Coatings Phase II, newest first.
File Type Posted
Sol_140R2020B0007_Amd_0004.pdf PDF
140R2020B0007 Amendment 0004_0004.pdf PDF
Sol_140R2020B0007_Amd_0003.pdf PDF
Sol_140R2020B0007_Amd_0002.pdf PDF
140R2020B0007 Amendment 0002_0002.pdf PDF
Sol_140R2020B0007_Amd_0001.pdf PDF
140R2020B0007 - SF 30_0001.pdf PDF
Solicitation 140R2020B0007 rev 7-28-20.pdf PDF
Sol_140R2020B0007.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140R2020B0007 x x

2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Sacramento CA 95825-1898 2800 Cottage Way, Room E-1815

R20

Division of Acquisition Services Regional Office Mid-Pacific Region Bureau of Reclamation

07/29/20200003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/29/2020

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Legacy Doc #: BOR

A. TITLE: Marble Bluff Coatings Phase II

B. PURPOSE: The purpose of this amendment is to incorporate the questions and answers, a revised schedule B, a revised 09 97 02 of Section C, and the TERO Memorandum.

C. DESCRIPTION: This amendment hereby incorporates the following:

New Incorporated Attachments:

Incorporate Questions and Answers, Section J Attachment 9

Incorporate TERO Memorandum, Section J Attachment 10

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Erik M. Danger

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R2020B0007/0003

Remove Section B and replace with Section B, Amendment 0003

Remove Section C, part 09 97 02 and replace with

Section C, part 09 97 02 Amendment 0003

Remove Section J Table of Comments, Amendment

0002 and replace with Section J Table of

Contents, Amendment 0003

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

CONTINUATION OF

SECTION B – SUPPLIES OR SERVICES AND PRICES

Marble Bluff Dam and Fish Passage Facility

Fish Lock Gate Rehabilitation Washoe Project, Nevada – California

B.1 PRICE SCHEDULE

(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.

(b) Offers are subject to the terms and conditions of this solicitation.

(c) Quantities in the Price Schedule are estimated quantities for comparison of offers only.

Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns. The contract clause at FAR 52.211-18, Variation in Estimated Quantity, does not apply to lump sum items.

(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.

(e) Definitions:

(1) CLIN – Contract Line Item Number.

PRICE SCHEDULE

CLIN Section Supplies or Services Quantity and Unit

Unit Price Amount

1 WBR

1452.232-

Mobilization and Preparatory Work

For the lump sum of $

2 Section H Tribal Employment Rights Ordinance (TERO)

For the lump sum of $

3 01 31 30 Contract Document Management System

For the lump sum of $

4 02 41 10 Demolition For the lump sum of $

Amendment 0003

Quantity and Unit

Unit Price Amount

5 03 30 00 Concrete for Filling Abandoned Pipes Associated with Fish Sorting Table

7.5 cu yd $ $

6 03 30 00 Topping Off of Filled Abandoned Pipes Associated with Fish Sorting Table

2.5 cu ft $ $

7 09 97 02 Blast and Recoat Gate Nos.

1, 2, 3, 4, and 5

For the lump sum of $

8 09 97 02 Blast and Recoat Gate No. 15

For the lump sum of $

9 09 97 02 Blast and Recoat Gate No. 7

For the lump sum of $

10 09 97 02 Blast and Recoat Gate No. 6 (Wing Gate)

For the lump sum of $

11 09 97 02 Blast and Recoat Stop Log Guides

For the lump sum of $

12 09 97 02 Blast and Recoat Gate No. 8 (Weir Gate)

For the lump sum of $

13 09 97 02 Blast and Recoat Gate No. 9

For the lump sum of $

14 09 97 02 Blast and Recoat Fish Lock Guides

For the lump sum of $

15 09 97 02 Blast and Recoat Gate No. 14 (Bulkhead Gate)

For the lump sum of $

16 09 97 02 Blast and Recoat Radial Bar Grating

For the lump sum of $

17 26 42 10 Gate Nos. 1, 2, 3, 4, and 5 Galvanic Anode Cathodic Protection System

For the lump sum of $

Quantity and Unit

Unit Price Amount

18 26 42 10 Gate No. 6 (Wing Gate) Galvanic Anode Cathodic Protection System

For the lump sum of $

19 26 42 10 Gate No. 8 (Weir Gate) Galvanic Anode Cathodic Protection System

For the lump sum of $

20 26 42 10 Gate No. 14 (Bulkhead Gate) Galvanic Anode Cathodic Protection System

For the lump sum of $

21 26 42 10 Gate No. 15 Galvanic Anode Cathodic Protection System

For the lump sum of $

22 31 03 10 Diversion and Care of Stream During Construction

For the lump sum of $

23 31 03 33 Removal of Water For the lump sum of $

24 31 23 10 Removal and Disposal of Existing Silt and Sediment

140 cubic yards

25 35 21 15 Diffusers For the lump sum of $

26 35 21 18 False Wall Plates for Gate Nos. 9 and 10

For the lump sum of $

27 35 21 21 Gate Rehabilitation For the lump sum of $

28 35 21 21 Surface Defect Weld Repair

5 lbs $ $

TOTAL FOR PRICE SCHEDULE $_________________

END OF SECTION

This page intentionally left blank.

SECTION 09 97 02

IMPACTED IMMERSION COATINGS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Blast and Recoat Each of Gate Nos. 1, 2, 3, 4, and 5:

1. Payment: Lump-sum price offered in the Price Schedule.

B. Blast and Recoat Gate No. 15:

1. Payment: Lump-sum price offered in the Price Schedule.

C. Blast and Recoat Gate No. 7:

1. Payment: Lump-sum price offered in the Price Schedule.

D. Blast and Recoat Gate No. 6 (Wing Gate):

1. Payment: Lump-sum price offered in the Price Schedule.

E. Blast and Recoat Stop Log Guides:

1. Payment: Lump-sum price offered in the Price Schedule.

F. Blast and Recoat Gate No. 8 (Weir Gate):

1. Payment: Lump-sum price offered in the Price Schedule.

G. Blast and Recoat Gate No. 9:

1. Payment: Lump-sum price offered in the Price Schedule.

H. Blast and Recoat Fish Lock Guides:

1. Payment: Lump-sum price offered in the Price Schedule.

I. Blast and Recoat Gate No. 14 (Bulkhead Gate):

1. Payment: Lump-sum price offered in the Price Schedule.

J. Blast and Recoat Radial Bar Grating:

1. Payment: Lump-sum price offered in the Price Schedule.

K. Cost:

1. Include cost of coating new Gate No. 6 (Wing Gate) leaf in the lump-sum price offered in the Price Schedule for Gate Rehabilitation.

2. Include cost of coating new diffusers in the lump-sum price offered in the Price Schedule for Diffusers.

3. Include cost of coating new false walls in the lump-sum price offered in the Price Schedule for False Wall.

1.02 REFERENCE STANDARDS

A. ASTM International (ASTM)

1. ASTM C920-18 Elastomeric Joint Sealants

2. ASTM D153-84(2014) Specific Gravity of Pigments

3. ASTM D281-12(2016) Oil Absorption of Pigments by Spatula Rub-

Out

4. ASTM D520-00(2019) Zinc Dust Pigment

5. ASTM D561-82(2014) Carbon Black Pigment for Paint

6. ASTM D740-11(2019) Methyl Ethyl Ketone

7. ASTM D841-17a Nitration Grade Toluene

8. ASTM D962-81(2014) Aluminum Powder and Paste Pigments for

Paints

9. ASTM D1045-14 Sampling and Testing Plasticizers Used in

Plastics

10. ASTM D1152-06(2012) Methanol (Methyl Alcohol)

11. ASTM D1153-12 Methyl Isobutyl Ketone 1, 2

12. ASTM D1200-10(2018) Viscosity by Ford Viscosity Cup

13. ASTM D1210-05(2014) Fineness of Dispersion of Pigment-Vehicle

Systems by Hegman-Type Gage

14. ASTM D2917-07(2013) Methyl Isoamyl Ketone

15. ASTM D3465-14 Purity of Monomeric Plasticizers by Gas

Chromatography

16. ASTM D4285-83(2018) Indicating Oil or Water in Compressed Air

17. ASTM D6677-18 Evaluating Adhesion by Knife

18. ASTM E1347-06(2015) Color and Color-Difference Measurement by Tristimulus Colorimetry

B. American Welding Society (AWS)

1. AWS D1.1/D1.1M:2015 Structural Welding Code – Steel

C. International Organization for Standardization (ISO)

1. ISO 8502-3:2017 Assessment of Dust on Steel Surface

Prepared for Painting (Pressure-Sensitive Tape Method)

D. National Association of Pipe Fabricators (NAPF)

1. NAPF 500-03-05-06 Abrasive Blast Cleaning of Cast Ductile Iron

Fittings

E. SAE International (SAE)

1. AMS-STD-595 Colors Used in Government Procurement

F. The Society for Protective Coatings (SSPC)/NACE International (NACE)

1. SSPC-AB1-15 Mineral and Slag Abrasives

2. SSPC-AB2-15 Cleanliness of Recycled Ferrous Metallic

Abrasives

3. SSPC-AB3-04 Newly Manufactured or Re-Manufactured

Steel Abrasives

4. SSPC Guide 15-05 Field Methods for Retrieval and Analysis of

Soluble Salts on Substrates and Other Nonporous Substrates

5. SSPC-PA2-15 Measurement of Dry Paint Thickness with Magnetic Gages

6. SSPC-QP1-12 Evaluating Painting Contractors (Field Application to Complex Industrial Structures)

7. SSPC-QP3-10 Evaluating the Qualification of Shop Painting Contractors

8. SSPC-SP1-15 Solvent Cleaning

9. SSPC-SP5/NACE 1-07 White Metal Blast Cleaning

10. SSPC-SP WJ-4/NACE WJ-4-12 Surface Preparation Standard – Waterjetting

Cleaning of Metals – Light Cleaning

11. SSPC-VIS1-02 Guide and Reference Photographs for Steel

Surfaces Prepared by Abrasive Blast Cleaning

12. SSPC-VIS3-04 Visual Standard for Power- and Hand-Tool Cleaned Steel

13. NACE RP0287-2002 Field Measurement of Surface Profile of Abrasive Blast Cleaned Steel Surfaces Using a Replica Tape

14. NACE SP0188-2006-SG Discontinuity (Holiday) Testing of New Protective Coatings on Conductive Substrates

1.03 SUBMITTALS

A. Submit in accordance with Section 01 33 00 - Submittals.

B. RSN 09 97 02-1, Approval Data:

1. For each coating material:

a. Manufacturer’s product data, application, and SDS sheets.

b. Include the following information:

1) Supplier’s name, address, and phone number.

2) Manufacturer’s designated product name.

3) Identification of “Items to be coated” including sub-letter and sub-number listed in Coating Tabulations.

2. For each caulk material:

a. Manufacturer’s product data, application, and SDS sheets.

b. Include the following information:

1) Supplier’s name, address, and phone number.

2) Manufacturer’s designated product name.

3) Identification of “Items to be coated” including sub-letter and sub-number listed in Coating Tabulations.

C. RSN 09 97 02-2, Final Approval Data:

1. For each coating material:

a. Purchase orders. Include:

1) Supplier’s name, address, and phone number.

2) Purchase order number and date.

3) Manufacturer’s designated product name.

4) Batch number(s) for each material, except thinners.

5) Quantities ordered for each material, except thinners.

D. RSN 09 97 02-3, Qualifications:

1. Coating Contractor: Resume demonstrating compliance with qualifications specified herein, refer to Article 1.04.

2. Coating Applicator: Resume demonstrating compliance with qualifications specified herein, refer to Article 1.04.

3. Coating Quality Control Manager: Resume demonstrating compliance with qualifications specified herein, refer to Article 1.04.

4. Coating Inspector: Resume demonstrating compliance with qualifications specified herein, refer to Article 1.04.

E. RSN 09 97 02-4, Material Certification:

1. CERL Paint Laboratory Testing Report demonstrating an approved batch.

F. RSN 09 97 02-5, Contractor Quality Testing Reports:

1. Submit report after completion of coating item.

1.04 QUALIFICATIONS

A. Coating Contractor:

1. Current SSPC-QP1 and SSPC-QP2 certified for field coating operations and field application to complex industrial structures.

2. Current SSPC-QP3 certification for shop coating operations.

3. References showing coating contractor has previous successful experience applying vinyl resin coating systems. Include list of not less than 32 jobs applying vinyl coatings to structures of similar size and complexity, including owner’s name, address, and telephone number.

B. Coating Applicator:

1. Current SSPC certified Level 2 Coating Application Specialist (CAS).

2. References showing coating applicator has previous successful experience applying vinyl resin coating systems. Include list of not less than 32 jobs applying vinyl coatings to structures of similar size and complexity, including owner’s name, address, and telephone number.

C. Coating Quality Control Manager:

1. Current NACE certified Level 3 Coatings Inspector (CIP) or SSPC certified Level

3 Protective Coatings Inspector (PCI).

2. References showing Coating Quality Control Manager has previous successful experience in jobs applying vinyl resin coating systems. Include list of not less than 5 years of jobs applying vinyl coatings of similar size and complexity, including owner’s name, address, and telephone number.

D. Coating Inspector:

1. Current NACE certified Level 2 minimum CIP or SSPC certified Level 2 minimum PCI.

2. References showing coating inspector has previous successful experience inspecting vinyl resin coating systems. Include list of not less than 2 years of jobs applying vinyl coatings of similar size and complexity, including owner’s name, address, and telephone number.

1.05 DELIVERY, STORAGE, HANDLING

A. Deliver materials to jobsite in original, undamaged, unopened containers labeled with manufacturer’s name, designated product name, batch number, date of manufacture, color, and any special instructions.

B. Deliver materials in containers not larger than 5 gallons as packaged by manufacturer unless suitable equipment is provided at jobsite to handle and thoroughly mix materials in larger containers.

C. Store coatings and thinners in accordance with manufacturer's written directions, and as a minimum, store off the ground, under cover, with sufficient ventilation to prevent buildup of flammable vapors, and at temperatures between 50 to 95 degrees F.

D. Do not expose to direct sunlight during storage.

E. Do not use coating material which has exceeded manufacturer’s specified storage stability period (shelf life).

1.06 AMBIENT CONDITIONS

A. Do not apply coatings under the following environmental conditions:

1. Substrate surface temperature less than 5 degrees Fahrenheit above dewpoint.

2. Temperatures of ambient air or receiving surface are less than 35 degrees

Fahrenheit.

3. Temperature of receiving surface is higher than 125 degrees Fahrenheit.

4. Ambient air temperature, substrate surface temperature, or humidity are outside of manufacturer’s recommended range.

B. Do not perform surface preparation or apply coatings when environmental conditions are not expected to meet specified requirements during surface preparation, coating application, and curing period.

C. Maintain environmental conditions to meet specified requirements during coating application and curing period. Provide heating or cooling, and dehumidification required to maintain temperature and humidity. Maintain environmental conditions in accordance with the recommendations of the coating material manufacturer. Complete curing before placing the coating systems into service.

1.07 PROJECT CONDITIONS

A. Existing coatings may contain hazardous materials.

B. There may be mill scale present on existing steel.

C. Gates require removal for recoating. Remove debris, sediment, equipment, and hardware as required to access gates. Refer to Section 01 57 30 - Water Pollution Control and Section 31 03 33 - Removal of Water.

D. Photographs of existing equipment are provided in Section 51 00 20 - Photographs.

PART 2 PRODUCTS

2.01 ABRASIVES

A. Mineral and Slag Abrasives: Meets SSPC-AB1, type I (natural minerals) and type II (slags), class A.

B. SSPC-AB2 for recycled cleanliness.

C. SSPC-AB3 Class I (steel) or II (iron) for angular shaped grit.

D. Use commercially available processes to render hazardous waste stream non-hazardous.

E. Do not exceed toxicity threshold limit for hazardous materials.

2.02 COATINGS

A. Line metal containers with coating resistant to coating solvent and capable of effectively isolating coating from contact with metal container.

B. Coating shall show proper proportions of specified materials when analyzed by chromatographic or spectrophotometric methods.

C. Viscosity of coating using ASTM D1200 and a No. 4 Ford cup: Between 60 and 90 seconds.

D. Coating Formulations:

1. Formula V-766E, Vinyl-Type (White or Gray) Impacted Immersion Coating:

Formula V-766E, Vinyl-Type (White or Gray) Impacted

Immersion Coating

INGREDIENTS PERCENT BY MASS

Vinyl Resin, Type 3 5.6

Vinyl Resin Type 4 11.6

Pigments - Titanium Dioxide or Carbon Black (for Gray)

13.0

Diisodecyl Phthalate 2.9

Methyl Isobutyl Ketone 32.0

Toluene 34.7

Ortho-Phosphoric Acid 0.2

TOTAL 100.0

a. Titanium dioxide or carbon black pigments:

1) Dispersed to fineness of grind of not less than 7 on Hegman scale in accordance with ASTM D1210.

2) Free from seeding, gelling, and other deleterious effects.

3) Grinding aids, antisettling agents, or other materials are not permitted.

b. Ortho-phosphoric acid:

1) Measured accurately and diluted with at least four parts of ketone to one part of acid.

2) Slowly incorporate into finished coating with constant and thorough agitation.

2. Formula VZ-108D, Vinyl-Type Zinc Rich Impacted Immersion Coating:

Formula VZ-108D, Vinyl-Type Zinc Rich Impacted Immersion Coating

INGREDIENTS PERCENT BY

MASS

POUNDS GALLONS

COMPONENT A

Vinyl Resin, Type 3 16.6 109.2 9.65

Methyl Isobutyl Ketone 80.6 528.9 79.30

Suspending Agent E 0.7 4.6 0.28

Suspending Agent F 0.4 2.7 0.19

Methanol 0.5 3.3 0.50

Synthetic Iron Oxide (Red)

1.2 7.9 0.19

TOTAL PART A 100.0 656.6 90.11

COMPONENT B

Silane B 100.0 4.1 0.47

COMPONENT C

Zinc Dust 100.0 550.0 9.42

Total Volume 100.00

a. Iron oxide and suspending agents:

1) Dispersed into vehicle (Component A) to fineness of grind of not less than 4 on Hegman scale in accordance with ASTM D1210.

2) Grinding in steel-lined containers or using steel-grinding media not permitted.

3) Sole purpose of iron oxide pigment is to produce a contrasting color.

4) Red iron oxide-type 3 vinyl resin vehicle paste may be used in place of dry iron oxide provided compensating adjustments are made to Vinyl Resin, Type 3 and methyl isobutyl ketone.

b. Finished product with zinc dust added shall produce a coating which has a red tone upon drying and a reflectance of not more than 16 in accordance with ASTM E1347.

c. Supply VZ-108D coating as a kit consisting of:

1) Component A: 4.5 gallons (33.1 pounds) in a 5-gallon lug closure type pail.

2) Component B: 3 fluid ounces packaged in a glass bottle with a polyethylene lined cap. Place bottle of silane in the pail of zinc dust.

3) Component C: 27.5 pounds packaged in a 1-gallon plastic pail.

4) In addition to standard labeling requirements, properly identify each container of each component as to component type.

5) Each container label of Component A shall carry instruction similar to the following:

MIXING AND APPLICATION INSTRUCTIONS

1. Remove bottle Component B (silane) from Component C (zinc dust) container and add to base coating Component A with thorough stirring.

WARNING

THIS COATING WILL NOT ADHERE TO STEEL SURFACES

UNLESS COMPONENT B IS ADDED.

2. Sift zinc dust into base coating while it is being vigorously agitated with a power-driven stirrer and continue stirring until zinc dust has been dispersed.

3. Strain mixed coating through a 30-60 mesh screen to prevent zinc dust slugs from reaching spray gun nozzle.

4. Stir coating continuously during application at a rate that will prevent settling.

5. If spraying is interrupted for longer than 15 minutes, immediately before restarting spraying vigorously whip entire length of application hose to redisperse zinc. If spraying is interrupted for more than 1 hour, empty application hose by blowing coating back into paint pot.

6. Thinning will not normally be required when ambient temperatures are below 80 degrees F. When ambient and steel temperatures are higher, methyl isoamyl ketone (MIAK) or methyl isobutyl ketone (MIBK) should be used.

7. If coating is kept covered, pot life will be about 8 days.

E. Ingredients for Coating Formulas:

1. Pigments and Suspending Agents:

a. Aluminum Powder: ASTM D962, Type 1, Class B.

b. Carbon Black: ASTM D561, Type I or II.

c. Zinc Dust Pigment: ASTM D520, Type II.

d. Iron Oxide, Synthetic Red: ASTM D3721, plus the following:

1) Oil absorption, maximum, ASTM D281: 24.

2) Specific gravity, ASTM D153, Method A: 4.90 to 5.20.

3) When pigment is dispersed into specified vinyl coating formulation, coating shall have color approximating AMS-STD- 595 color 10076 (dark red coating) and shall show no evidence of incompatibility or reaction between pigment and other components after 6 months storage.

e. Titanium Dioxide: Kronos 2160 or 2101, Kronos, Inc.; or Ti-Pure R-960, E.I. Dupont DeNemours and Co., Inc.

f. Suspending Agent E: M-P-A-14, produced by Elementis Specialties; or equal with the following essential characteristics:

1) Organic derivative of magnesium aluminum silicate mineral capable of minimizing tendency of zinc dust to settle hard without increasing viscosity of coating appreciably.

2) Light cream-colored, finely divided powder.

3) Specific Gravity: 2 to 2.3.

g. Suspending Agent F: Bentone 27, produced by Elementis Specialties; or equal with the following essential characteristics:

1) Organic derivative of a special montmorillonite (trialkylaryl ammonium hectorite).

2) Light cream-colored, finely divided powder.

3) Specific Gravity: Approximately 1.8.

2. Resins, Plasticizer, and Catalyst:

a. Vinyl resin, Type 3: Vinnol H 15/50, as manufactured by Wacker Chemie

AG, or equal with the following essential characteristics:

1) Vinyl chloride-acetate copolymer of medium average molecular weight produced by a solution polymerization process.

2) Contain (by weight) 85 percent vinyl chloride and 15 percent vinyl acetate.

3) Produce equal film-forming properties in specified formulations.

b. Vinyl resin, Type 4: Vinnol H 15/45 M, as manufactured by Wacker Chemie AG; or equal with the following essential characteristics:

1) Tripolymer of the vinyl chloride-acetate and dicarbonic acid type produced by a solution polymerization process.

2) Contain (by weight) 1 percent interpolymerized dicarbonic acid, 84 percent vinyl chloride, and 15 percent vinyl acetate.

3) Produce equal film-forming properties in specified formulations.

c. Plasticizer: Either Di 2-propyl Heptyl Phthalate (DPHP) or Diisodecyl

Phthalate (DIDP):

1) DPHP:

a) Ester content, ASTM D3465: Not less than 99.5 percent.

b) Water content: Not more than 0.1 percent.

c) Acid number, ASTM D1045: Not more than 0.07.

2) DIDP:

a) Ester content, ASTM D3465: Not less than 99.0 percent.

b) Water content: Not more than 0.1 percent.

c) Acid number, ASTM D1045: Not more than 0.10.

d. Ortho-phosphoric acid: Chemically pure 85 percent grade.

3. Solvent and Thinners:

a. Methanol (methyl alcohol): ASTM D1152.

b. Methyl ethyl ketone (MEK): ASTM D740.

c. Methyl isobutyl ketone (MIBK): ASTM D1153.

d. Methyl isoamyl ketone (MIAK): ASTM D2917.

e. Toluene: ASTM D841.

4. Silane B: N-beta-(aminoethyl)-gammaaminopropyltrimethoxy silane. Silquest A-1120, produced by Momentive Performance Materials Inc.; Silane Z-6020, produced by Dow Corning Corporation; or equal.

2.03 CAULKS

A. Caulks:

1. Coating manufacturer’s standard or compatible caulk material.

2. Polyurethane, silicone, or silicone acrylic caulk material: Meets or exceeds

ASTM C920 type S or M, grade NS, class 25, suitable for water immersion service.

3. Apply caulks after coating application and assembly.

2.04 MISCELLANEOUS MATERIALS

A. Soluble Salt Removal Materials:

1. Deionized water.

2. CHLOR*RID as manufactured by Chlor-Rid International Inc., PO Box 908 Chandler AZ 85244, 480-821-0039, www.chlor-rid.com, or equal, with following essential characteristics:

a. Water soluble.

b. Biodegradable.

c. Zero volatile organic compounds.

PART 3 EXECUTION

3.01 PROTECTION OF ADJACENT SURFACES, EQUIPMENT

A. Protect items or surfaces not to be coated from contamination and damage during cleaning and coating operations:

1. Protect from abrasive blast particles and airborne coating particles.

2. Includes surfaces and equipment in physical contact and in the vicinity of cleaning and coating operations.

3. Examples Include: Mating and machined surfaces, mechanical and electrical equipment (open or enclosed); instruction and similar plates; and wet and newly coated surfaces.

3.02 REPAIR OF CONTRACTOR DAMAGED SURFACES

A. Repair items, equipment, or surfaces which are damaged or contaminated by Contractor operations, or as a result of transportation or installation as determined by the COR:

1. Repair damaged items and restore manufacturer coated equipment to original condition and appearance.

2. Before coating damaged coated surfaces, re-clean exposed surfaces and apply coating materials in accordance with the coating manufacturer’s instructions.

3.03 COATING OF METALWORK EMBEDDED IN CONCRETE

A. Caulk or seal gaps between metal and concrete at exposed faces. Follow manufacturer’s instructions to apply caulking material with maximum thickness of 1/2-inch.

B. Coat ferrous surfaces in direct contact with concrete or grout overlapping concrete surfaces by 2 inches. Examples include: Sill or anchor plates for impacted immersion.

3.04 SURFACE PREPARATION

A. Remove or repair surface irregularities before specified surface preparation.

1. Welds:

a. Welds: Smooth and continuous.

b. Weld spatter, buckshot, laminations, and slivers: Remove and grind smooth.

c. Undercuts and pinholes: Fill with weld metal and grind smooth.

d. Projections, sharp edges, high points, fillets and corners: Grind smooth to radius of at least 1/16-inch.

2. Pitting, gouges, scratches, porosity, and similar defects:

a. Grind smooth.

b. Repair defects exceeding 1/8-inch in depth as measured with a pit gauge by welding in accordance with Section 35 21 21 – Gate Rehabilitation Paragraph 1.05.A and AWS D1.1 and as approved by the OGR.

3. Slag burrs, and laminations: Remove and grind smooth.

B. Grind full length of free edges and corners to 1/16-inch chamfer before specified surface preparation.

C. Surface preparation method and surface profile: Refer to Coating Tabulations.

D. Soluble Salt for Surfaces Coated:

1. Test substrate surface after preparation to include corrosion pits. Perform two tests per 250 square feet minimum plus one test for each additional 250 square feet or part thereof.

2. Perform tests in accordance with soluble salt inspection procedures specified.

E. Re-clean or perform additional surface preparation of completed metallic or coated surfaces that become contaminated before coating application.

F. Prepare surface free of moisture, frost, and ice. Heat substrate surface which is not thoroughly dry to remove moisture before coating application.

G. Heat cast iron components to between 140 and 180 degrees Fahrenheit for 2 hours minimum to evaporate moisture in crystalline matrix.

3.05 APPLICATION EQUIPMENT

A. Apply vinyl resin coating using conventional spray application equipment, except areas inaccessible to spraying.

B. Air Compressor and Spray Application Equipment:

1. Provide appropriate type equipment, adequately sized, and in proper operating order.

2. Equip spray equipment with traps and separators; and where appropriate, mechanical agitators, pressure gauges, pressure regulators, and screens or filters.

3. Keep air supply lines free of oil and moisture.

a. Inspect air supply lines on air compressors for oil and moisture in accordance with ASTM D4285. Remove oil or water before proceeding with work.

C. Keep fluid and atomization pressures as low as practicable and consistent with good spraying results.

3.06 MIXING AND THINNING

A. Vinyl coatings require thinning for spray application, except zinc rich vinyl coating (Formula VZ-108D) which normally requires thinning only under certain weather conditions.

B. Thinners for vinyl coatings shall be as follows:

Approximate Ambient Air Temperature (Degrees Fahrenheit)

Below 50 MEK

Between 50 and 70 MIBK

Above 70 MIAK

C. Vary amount of thinner to produce a wet spray that prevents deposition of semi-dry particles on surface.

1. Thin vinyl coatings as necessary up to approximately 25 percent (1 quart/gallon of base coating) with appropriate thinner. Elevated ambient and steel temperatures may require up to 40 percent thinning for satisfactory application.

3.07 COATING APPLICATION

A. Apply number of coats and coating thickness specified in Coating Tabulations.

B. After surface preparation and cleaning, apply stripe coat and primer coat before rust bloom (flash rust) occurs or the same day, whichever is sooner. Re-clean surface areas not receiving stripe coats and primer coat within this period.

C. Spray coating, except areas inaccessible to spray may be applied by brush.

D. Stripe Coats:

1. Apply extra spray pass.

2. Apply to edges, corners, interior angles, pits, seams, crevices, junctions of joining members, rivets, nuts, threads, bolts, washers, weld lines, and similar surfaces before applying double spray coat.

E. Spray Application of Vinyl Resin Coating Using Double Spray Coats:

1. Apply spray passes at same coverage rate.

2. Apply spray in half-lapped passes.

3. After first spray pass dries to at least a near tack-free condition, follow by second spray pass applied where practicable at right angles to the first.

4. Rivets, bolts, and similar surface projections: Spray coating from every direction to ensure complete coverage of faces.

5. Unless otherwise specified, do not apply more than 2.0 mils average DFT per double spray coat.

F. Pits, Cracks, and Crevices:

1. Fill with coating insofar as practicable.

2. Ensure pit surfaces are thoroughly covered and cracks and crevices are sealed off against entrance of moisture.

G. Except where otherwise indicated, an undercoat of vinyl-type coating may receive the next coat after the undercoat is tack-free and firm to the touch, provided that no speed-up or delay in recoating schedule shall cause film defects such as sags, runs, air bubbles, air craters, or poor intercoat adhesion.

H. Re-clean surfaces which become contaminated between application of coating and applying next coat.

I. Apply even film of uniform thickness tightly bonded to substrate or previous coats:

1. Coats shall be smooth, free from defects such as skips, runs, sags, drips, pinholes, laps, brush marks, voids, or similar defects.

2. Coatings edges shall be sharply cut to lines.

J. Primer Coat: Cover peaks of surface profile by specified dry film thickness.

K. Alternate coat colors to differentiate between coats.

L. Prevent over spray or dry spray. When such conditions occur, clean surface of over spray or dry spray prior to application of succeeding coat.

M. Zinc Rich Vinyl Primer:

1. Field mix components A, B, and C in accordance with label instructions. After mixing, keep coating covered to avoid contamination. Apply within 8 days after mixing.

2. When ambient or steel temperature is below 80 degrees Fahrenheit, coating will not normally require thinning; however, the paint shall at all times contain sufficient volatiles (thinners) to permit it to be satisfactorily atomized, to provide a wet spray, and to avoid deposition of particles that are semi-dry when they reach the surface.

3. Continuously stir coating during application at rate that will prevent zinc dust from settling.

4. Interruptions:

a. When spraying is resumed after interruption of longer than 15 minutes, vigorously whip entire length of material hose until settled zinc is redispersed.

b. Avoid long periods of permitting coating to remain stagnant in hose by emptying hoses whenever coating operation is suspended for more than 1 hour.

5. Keep material hoses as short as practicable, preferably not more than 50 feet in length.

6. Do not use equipment used for spraying zinc rich vinyl primer for spraying other vinyl coatings without first thoroughly cleaning, since other coatings will not tolerate zinc contamination.

7. An average dry film thickness of up to 2.5 mils may be applied in one double-spray coat.

8. Unless specifically authorized, not more than 8 days shall elapse after application of VZ-108D zinc rich coat before succeeding coat is applied.

3.08 REPAIR OF DEFECTIVE OR DAMAGED COATED SURFACES

A. Repair defective or damaged coatings as approved by COR:

1. Where repair of defective or damaged areas of coatings requires partial removal of coating, test adhesion of remaining coating with a knife blade applied under the edge of remaining coating. Remove coatings which lift.

2. Physically repair pinholes, blisters, air bubbles, or dry spray by scrubbing with a brush or rag wet with ketone solvent before applying succeeding coat.

3. If corrosion is present, spot repair defective area. Prepare area using specified surface preparation method. Scrub remaining coating with ketone.

3.09 PROTECTION OF NEWLY COATED SURFACES

A. Do not walk on, subject to abrading action, or move items until coats are hardened sufficiently to resist damage.

3.10 CONTRACTOR FIELD QUALITY TESTING

A. Inspection Devices:

1. Furnish inspection devices in good working condition for detection of holidays and measurement of dry film thickness of coating.

2. Use calibration plates or plastic shims to calibrate thickness gauge prior to every use.

B. Perform tests in presence of the OGR. Tests performed in absence of the OGR will not be accepted and subject coating shall be retested in the OGR’s presence.

C. Complete the following quality control tests, and prepare and submit reports of results:

1. Soluble Salt:

a. Measure chloride soluble salt ion or chloride specific ion on substrate surfaces by one of procedures in SSPC Guide 15.

b. Procedure shall have lower measurement threshold limit of 1 microgram per square centimeter.

c. Acceptance Criteria: Do not exceed 3 micrograms per square centimeter.

2. Surface Profile: Inspect surface profile in accordance with NACE RP 0287 for compliance with specified requirements. Use replica tape suitable for surface profile depth range.

3. Visual Comparison of Prepared Surfaces:

a. Compare prepared steel surfaces to following visual reference photographs for allowable visible contaminants and stains:

1) SSPC-VIS1 for abrasive blast cleaning.

2) SSPC-VIS3 for power and hand tool cleaning.

4. Assessment of Dust on Newly Prepared Metal Surfaces:

a. Visually inspect and clear tape test method in accordance with ISO 8502-3 at a minimum of three random tests per each blasted section per shift.

b. Test shall meet cleanliness Class 2 grade.

5. Compressed Air Quality: ASTM D4285.

6. Post Cure Evaluation:

a. Dry Film Thickness (DFT):

1) After each coat, inspect hardened coating system for DFT compliance in accordance with SSPC-PA2.

2) Acceptance Criteria: No single spot measurement less than specified minimum.

b. Discontinuity (Holiday) Testing:

1) Inspect in accordance with NACE SP 0188:

a) Use maximum test voltage for DFT as recommended by coating manufacturer to prevent coating damage.

b) Use of detergent wetting solution is not permitted.

c) Subtract thickness of zinc rich primer from applied coating systems to determine test voltage.

c. Adhesion Test:

1) Perform when and where required by COR. COR will require performance of this test when inadequate procedures are suspected.

2) Test Procedure: ASTM D6677.

D. Reports:

1. Prepare report for each shift performing coating work, including surface preparation. Report shall be complete for coating work performed on the shift.

Make reports available for ongoing review by Government personnel.

2. Report shall be signed by Coating Quality Control Manager and Coating Inspector.

3. Include the following in report:

a. Date of work.

b. Description of areas and work performed.

c. Surface preparation.

d. Surface cleanliness (visible contaminants).

e. Surface profile.

f. Substrate soluble salt concentration.

g. Ambient conditions.

h. Dry film thickness after each coat.

i. Coating adhesion testing (when requested by COR).

j. Holiday testing.

k. Coating batch numbers.

l. List of personnel performing work during each shift.

3.11 COATING TABULATIONS

Tabulation No. 1 - Impacted Immersion

Forebay structure:

1. Blast and recoat cast iron 24-inch by 24-inch slide (sluice) Gate Nos. 1, 2, 3, 4, and 5 leaf and frame. Coat approximately 40 square feet per gate assembly.

2. Blast and recoat cast iron 96-inch by 84-inch slide (heavy duty sluice) Gate No. 15 leaf, frame, wall thimble, and guides. There is approximately 350 square feet to be coated.

Fish lock exit channel:

3. Blast and recoat undamaged 2.5-foot by 15-foot Gate No. 6 (Wing Gate) leaf and frame, guides, base plate, guide angle, bottom clamp bar, and side clamp bar (Parts 1, 2, 3, 4, 5, 10, 11R, 12, and 14 on Information Drawing 949-D-213, 949-D-214, 949-D- 215, and 949-D-216). Coat approximately 210 square feet.

4. Blast and coat new 2.5-foot by 15-foot Gate No. 6 (Wing Gate) leaf (Part 11L on Information Drawing 949-D-213). There is approximately 75 square feet to be coated.

5. Blast and recoat stoplog guides, except diffuser grating. There are 3 sets of stoplog guides; coat approximately 195 square feet each.

6. Blast and coat new diffuser gratings (Parts 20 and 20A on Information Drawing 949- D-1264). Fabricate in accordance with Section 35 21 15 – Diffusers.

7. Blast and recoat cast iron 24-inch by 24-inch slide (sluice) Gate No. 7 leaf and frame.

Coat approximately 40 square feet.

Fish lock exit:

8. Blast and recoat 15-foot by 3-foot 9-inch Gate No. 8 (Weir Gate) and guides (Parts 8, 8B, and 8C on Information Drawing 949-D-1261). Coat approximately 300 square feet.

Fish lock:

9. Blast and recoat cast iron 60-inch by 60-inch slide (sluice) Gate No. 9, steel covers, wall thimbles, guides (including downstream guides), and cover brackets (Parts 23B, 24E, and 24H on Information Drawing 949-D-1274). Coat approximately 400 square feet.

10. Blast and recoat fish lock guides. Refer to Section 51 00 20 – Photographs, Photo 17.

Coat approximately 200 square feet.

11. Blast and coat new false walls, drain water grating and modified diffuser grating (Parts 7, 22, 23A, 24A, 24B, 24C, and 24D on Information Drawing 949-D-245, 949-D- 1273, and 949-D-1274). Fabricate in accordance with Section 35 21 18 – False Walls.

Fish lock entrance channel:

12. Blast and recoat Gate No. 14 (Bulkhead Gate), guides, bottom seat, and seal clamps (Parts 14, 14A, 14B, 14C, 14K and 14L on Information Drawing 949-D-1257 and 949-D-1259). Coat approximately 340 square feet.

13. Blast and recoat radial bar grating and grating seats (Parts 20B and 20C on Information Drawing 949-D-1264). Coat approximately 620 square feet.

14. Blast and coat new diffuser (Part 25 on Information Drawing 949-D-1264). Fabricate in accordance with Section 35 21 15 – Diffusers.

Notes:

1. Control water upstream of forebay trashracks and downstream of fish lock entrance channel. Refer to Section 01 57 30 – Water Pollution Control, Section 31 03 10 - Diversion and Care of Stream During Construction, and Section 31 03 33 – Removal of Water.

2. Refer to Section 51 35 21 – Slide Gate Manual for manufacturer-provided manual and field verify.

3. Remove and dispose of damaged Gate No. 6 (Wing Gate) leaf in accordance with Section 02 83 35 – Removal and Disposal of Materials Containing Regulated Metals and Section 35 21 21 – Bulkhead Gate and Wing Gate Rehabilitation.

4. Provide government access to fish lock exit 15-foot by 3-foot 9-inch Gate No. 8 (Weir Gate) after removal and prior to reinstallation and notify OGR 2 days prior to each activity. Government will disassemble existing flashboard from gate and assemble new flashboard after recoating is complete.

5. Existing coatings may contain hazardous materials.

6. Do not coat aluminum-brass, brass, and stainless steel metalwork and seals.

7. Do not coat bolt threads, seals, and machined surfaces where coating could interfere with proper operation or fit.

8. Coat all fasteners and hardware after assembly.

Coating materials Number and thickness of coats

Surface preparation method

Primer: VZ-108D

Intermediate coats: V-766E

Topcoat: V-766E gray

Color (approximate):

AMS-STD-595

26231 gray 27875 white (alternating color)

1 primer double spray coat,

2.5 mils average DFT, plus stripe coats.

3 intermediate double spray coats, with stripe coats

1 double spray topcoat, with stripe coats

Total system thickness, excluding stripe coats:

Average: 8.0-mil DFT, minimum; with no single spot less than 6.5-mil DFT

SSPC-SP WJ-4

Light cleaning to remove surface contaminants

SSPC-SP1

for cast-iron:

NAPF 500-03-05 Blast

Clean No. 4 for steel:

SSPC-SP5/NACE 1

1.5-2.0 mil angular surface profile

Tab IE-04.DOC

END OF SECTION

This page intentionally left blank.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

Attachment Number

List of Documents, Exhibits, and other Attachments

General Decision Number: NV20200040 Dated: 7-3-2020

Limitations on Subcontracting Worksheet

Offeror Responsibility Information

Construction Invoice Documents

DI-137 Release of Claims (See DIAR 1452.204-70)

Maintenance Exemption Letter

Site Visit Agenda

Site Visit Attendance Sheet

Questions and Answers

TERO Memorandum

Attachment 9

Questions and Answers

1. Spec. section 09 97 02 Impacted Immersion Coatings, Part 1.04 A 3: If we supply at-least two projects (for vinyl coating systems) will we be considered qualified?

Yes, see the revised section 09 97 02 Impact Immersion Coatings section which allows for at-least two projects.

2. Spec. section 09 97 02 Impacted Immersion Coatings, Part 1.04 B 2: If we supply at-least two projects (for vinyl coating systems) will (the Coating Application Specialist) be considered qualified?

Yes, see the revised section 09 97 02 Impact Immersion Coatings section which allows for at-least two projects.

3. Is another site visit going to be scheduled?

No, another site visit is not scheduled.

4. Can a Contractor visit the site without Reclamation present to become familiar with the work?

No, a Contractor may not visit the site without Reclamation present. Due to COVID-19, the entire facility is closed to the public until further notice.

5. Can the work that takes place in the Fish Handling Building (demolition and removal of obsolete fish handling equipment & infilling of pipes and voids left by equipment removal) take place outside of the July 1 to December 31 dates?

Yes.

6. CLIN 2 (TERO) of the price schedule references section H. Section H Item H.2 states to see Section J for TERO preference law and compliance plan. Please provide this information along with the tribal tax requirements and any other tribal fees.

See the Tribal Employment Rights Ordinance (TERO) added to Section J.

7. Which CLIN item should we add the cost for the demolition work shown in section 02 41 10?

See the revised Section B with an added CLIN 4 for Demolition.

8. Do you anticipate the bid due date will be extended?

The bid due date is not being extended and remains August 28, 2020 at 1300.

Attachment 10