140R2020B0007 Amendment 0002_0002.pdf
PDF 443 KB Posted
- Attached to
- Marble Bluff Coatings Phase II Federal contract opportunity
- Solicitation number
- 140R2020B0007
About this file
This document provides details for a federal solicitation seeking coatings rehabilitation services at the Marble Bluff Dam and Fish Passage Facility. The Bureau of Reclamation is soliciting proposals for Phase II of the Marble Bluff Coatings project, requiring removal and replacement of seals and metalwork, blasting and recoating of gates and metalwork with a vinyl coating system, installation of cathodic protection, removal and disposal of hazardous materials, and demolition and removal of obsolete fish handling equipment. Offerors must provide water control plans, submittal responses, and sequencing for gate rehabilitation work. The performance period is 470 days from notice to proceed. The total estimated cost range for this project is between $1,000,000 to $5,000,000. This requirement is restricted to small businesses with a NAICS code of 237990 and size standard of $39.5 million. Proposals are due by August 28, 2020.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140R2020B0007_Amd_0004.pdf | ||
| 140R2020B0007 Amendment 0004_0004.pdf | ||
| Sol_140R2020B0007_Amd_0003.pdf | ||
| 140R2020B0007 SF-30 Amendment 0003_0003.pdf | ||
| Sol_140R2020B0007_Amd_0002.pdf | ||
| Sol_140R2020B0007_Amd_0001.pdf | ||
| 140R2020B0007 - SF 30_0001.pdf | ||
| Solicitation 140R2020B0007 rev 7-28-20.pdf | ||
| Sol_140R2020B0007.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R2020B0007 x x
2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sacramento CA 95825-1898 2800 Cottage Way, Room E-1815
R20
Division of Acquisition Services Regional Office Mid-Pacific Region Bureau of Reclamation
07/29/20200002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/29/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
A. TITLE: Marble Bluff Coatings Phase II
B. PURPOSE: The purpose of this amendment is to incorporate the site visit agenda and the site visit attendance sheet.
C. DESCRIPTION: This amendment hereby incorporates the following:
New Incorporated Attachments:
Incorporate Site Visit Agenda, Section J Attachment 7
Incorporate Site Visit Attendance Sheet, Section J Attachment 8
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Erik M. Danger
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R2020B0007/0002
Remove Section J Table of Comments, Amendment
0001 and replace with Section J Table of
Contents, Amendment 0002
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Amendment 0002
Section J - Page 1 of 1
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
Attachment Number
List of Documents, Exhibits, and other Attachments
General Decision Number: NV20200040 Dated: 7-3-2020
Limitations on Subcontracting Worksheet
Offeror Responsibility Information
Construction Invoice Documents
DI-137 Release of Claims (See DIAR 1452.204-70)
Maintenance Exemption Letter
Site Visit Agenda
Site Visit Attendance Sheet
Attachment 7
Marble Bluff Dam and Fish Passage Facility Fish Lock Gate Rehabilitation
Solicitation No. 140R2020B0007
August 5, 2020 at 11:00 am PDT
AGENDA
I. Introductions:
CGB-3800 Erik Danger, Contracting Officer
Matt Thomas, Contract Specialist
WCO Roger (Jack) Worsley, Acting Regional Construction Engineer
Reynaldo E. (Henry) Garcia, Construction Manager
Kent Perkes, Office Engineering Division Chief
Todd Dooley, Project Resident Engineer
LBAO Steven Sprague, Project Manager
TSC Bobby Jo Merten, Design Engineer Lead
II. Communication Protocol:
All questions shall be emailed to the following individuals:
Todd Dooley (tdooley@usbr.gov)
Steven Sprague (ssprague@usbr.gov sassprague@usbr.gov)
Mathew Thomas (mthomas@usbr.gov )
ALL QUESTIONS WILL BE ASKED IN WRITING AND WILL BE ANSWERED IN
WRITING IN ORDER TO BECOME INTEGRAL TO THE CONTRACT. NOTHING
STATED OTHERWISE WILL BECOME PART OF THE CONTRACT.
The cut-off date and time for submittal of questions is 5:00 pm (PST) on Friday, August 14, 2020. Any questions received after this may not be responded to and therefore not included in an amendment.
The bid due date of is 1:00 pm (PST) on Friday, August 28, 2020, so it is imperative to submit all questions in writing as soon as practicable.
SF 1442:
Estimated Price Range: The estimated cost of this project is between $1,000,000 and
$5,000,000.
Set-Aside Information: This requirement is restricted to Total Small Business concerns using
NAICS 237990 and applicable size standard of $39.5 million.
Attachment 8 mailto:tdooley@usbr.gov mailto:ssprague@usbr.gov mailto:mthomas@usbr.gov
August 5, 2020 at 11:00 am PDT
III. Project Description:
The omission of discussing solicitation items/issues does not diminish their importance.
SECTION C - Specifications/Appendices
Section 01 11 00 Summary of Work Part 1.02 Principle Components of Work
Principle components of work include:
1. Install cofferdam upstream of forebay gates to be recoated and downstream of bulkhead gate at entrance channel.
2. Remove and dispose of sediment and control water leakage into cofferdam during construction.
a. Sediment removed may contain hazardous substances.
b. Sample and analyze removed sediment prior to disposal.
3. Replace seals.
4. Remove and replace metalwork.
5. Blast and recoat gates and metalwork with vinyl coating system.
6. Furnish and install cathodic protection for gates.
7. Remove and dispose of coatings and equipment containing hazardous materials.
8. Demolition and removal of obsolete fish handling equipment.
9. Infilling of pipes and voids left by equipment removal.
Section 01 33 00, Submittals
1. 21-day government review of RSNs.
2. 64 RSNs.
3. Submit RSNs in accordance with specification requirements.
Section 02 41 10 Demolition, Table 01 41 10-1 Demolition List: Fish Handling Equipment
1. Table 01 41 10 lists components of Fish Sweep, Fish Basket, Fish Hoist, Fish Sorting Tables, Fish Slides, Fish Pen Separators.
Section 09 97 02 Impact Immersion Coatings Part 3.11 Coating Tabulations
1. Refer to coating tabulations for items to be coated with impact immersion coatings with approximate dimensions.
2. SP5/NACE 1 surface preparation for steel.
3. One primer double spray coat, 2.5 mils DFT of VZ-108D
4. Three intermediate double spray coats, V-766E
5. One double spay topcoat of V-766E
6. Total system thickness of 8 mil DFT min
Section 31 03 10, Diversion and Care of Stream During Construction
1. Refer to Section 01 57 30, Water Pollution Control for regulatory requirements. Also, see exemption of 404 permit requirements in Section J.
2. RSN 31 03 10-1, Water Control Pan includes designs for temporary diversions and proposed methods for diversion and care of stream.
3. Contractor to design for a forebay water surface elevation of 3857’ plus 12” of freeboard plus 6” of debris of water surface.
4. Contractor to design for afterbay water surface elevation 3821’ plus 12” of freeboard.
5. USGS records are solely for information to the Contractor. Section 51 35 24 includes reservoir modeling. Section 51 35 26 include reservoir elevation data.
Section 26 42 10, Galvanic Anode Cathodic Protection System and Immersed Gates
1. Galvanic Cathodic Protection Systems required for gates 1, 2, 3, 4, 5, 6, 8, 14 and 15.
2. See section 26 52 20 and drawings 320-D-60007 through 320-D-60010 requirements.
Section 31 23 10, Removal and disposal of Existing Silt and Sediment
1. Remove sediment between Contractor Cofferdam or Bulkhead and Marble Bluff Dam Structures for project needs such as coating project features.
2. Use non-motorized hand tools for removing silt and sediment.
Section 35 21 21 Gate Rehabilitation
1. The left Gate No. 6 (Wing Gate) bulges out approximately 2“. Provide one new left leaf for Gate
No. 6 Wing Gate.
2. See disassembly and other requirements for Gates 1-5 and 7 through 15.
3. Perform weld repairs in accordance with section 09 97 02. Repair defects exceeding 1/8” in depth as measured with a pit gauge.
4. See Operational Test, Dry Seal Test and Wet Seal Test requirements for gates.
IV. Sections F, H, I and J:
SECTION F –Commencement, Prosecution, and Completion of Work:
Start work within 7 calendar days of NTP and complete entire work ready for use not later than
470 calendar days after NTP.
Liquidated Damages: If the Contractor fails to complete the work within time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of
$2200.00 for each calendar day of delay until the work is completed or accepted.
SECTION H Special Contract Requirements
Work on in water structures may only be performed between July 1 and December 31.
SECTION I - Contract Clauses: Note that many clauses are only incorporated by reference, with the same force and effect as if they were given in full text. The full texts of clauses are available by accessing appropriate websites listed in Section I.
WBR 1452.232-80 Limitation of Funds (Fixed Price Contract)
Fiscal Year Funding Amount
FY2020 15%
FY2021 85%
SECTION J - List of Documents, Exhibits and Other Attachments: Davis-Bacon Wage Rates apply to this project.
PLEASE NOTE AND COMPLY WITH ALL INSTRUCTIONS OR YOUR BID MAY BE
DEEMED NON-RESPONSIVE.
V. Review Site Visit JHA
VI. Site Tour Sequence
1. Review list of major work items 1 through 12 shown on Drawing 320-D-60006.
2. Review Contractor Site Use Areas.