140R1026B0003_Q-A_Log_Final_7_26_26_0003.pdf

PDF 75 KB Posted

Attached to
Hungry Horse Power Plant Turbine Runner Cavitation
Solicitation number
140R1026B0003
Issued by

About this file

This is a Questions and Answers document for the Hungry Horse Cavitation Repair IDIQ contract (140R1026B0003). The document addresses ten contractor inquiries regarding project execution and contractual requirements.

Key questions addressed include: extension of access hours from four days at ten hours to six days at ten hours (to be addressed in forthcoming amendment); acceptability of Microsoft Projects as the scheduling program (refer to section 01 31 30 Contract Document Management System); applicability of full safety equipment requirements for previously repaired units (to be addressed in forthcoming amendment); onsite presence requirements for Safety Professionals (refer to section 01 35 30); cavitation repair duration windows (refer to section 01 14 00 Work Restrictions); working hours and seven-day-per-week scheduling during shutdown work (to be addressed in forthcoming amendment); and clarification on whether grinding is to be bid per man hour or per crew grinding time (to be addressed in forthcoming amendment). Three inquiries regarding photographic documentation—including scale of work area, owner-provided platforms, and dam electrical connections for welding power—were answered with references to Amendment 0003. This document does not establish pricing terms, response dates, or award information but rather clarifies specification requirements and outstanding issues pending resolution through future amendments.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

# Question Government Answer

Access Hours - Can the hours be extended from the 4 days 10 hours to a 6 day 10 hour? As of 6/10 schedule will increase the duration by 1.5x.

Will be addressed in amendment forthcoming

2 Is Microsoft Projects acceptable as the scheduling program?

Please refer to section 01 31 30 Contract Document Management System; section

1.05 of specification.

CIH-With the units already been repaired previous and technicians will be wearing full papa safety equipment is this still a requirement?

Will be addressed in amendment forthcoming

4 Is the Safety Professional required to be onsite every week or just the first week?

Please refer to section 01 35 30 Contractor's Onsite Safety Personnel; Part 1.06 of specification

5 What is the duration window for cavitation repairs? Please refer to section 01 14 00 Work Restrictions; Part 1.01 of specifications

During shutdown work, are the working hours as much as needed? Can work be done

7 days a week?

Will be addressed in amendment forthcoming

7 Are there any pictures showing scale in the area of work? Photos located in Amend 0003

8 Can you please show owner provided platforms? Photos located in Amend 0003

Per bid schedule the grinding is to be bid per hour. Is this per man hour or per grinding time of the crew?

Will be addressed in amendment forthcoming

Do you have any details or photographs on dam electrical connections for welding power?

Photos located in Amend 0003

140R1026B0003 Hungry Horse Cavitation Repair IDIQ

QUESTIONS AND ANSWERS