This document provides specifications for the Kachess Dam Modification Phase 3 project in Washington state. The Bureau of Reclamation is seeking construction services including concrete work, electrical systems, HVAC installation, and inspection well instrumentation. Bids are due by February 23, 2024 with award anticipated shortly after. The contractor will be responsible for worksite safety and environmental compliance, and will have access to an onsite power supply. The specifications cover submittal requirements, testing procedures, material standards, and construction details for tasks such as concrete forming, waterstop installation, coating application, and Parshall flume construction.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140R1024R0002_Amd_0003.pdf | ||
| Sol_140R1024R0002_Amd_0002.pdf | ||
| Sol_140R1024R0002_Amd_0001.pdf | ||
| Amendment_0001_Merged_Documents_0001.pdf | ||
| Sol_140R1024R0002.pdf | ||
| 140R1024R0002_Solicitation.pdf | ||
| J_2_Drawings_-_Pages_1-110.pdf | ||
| J_5_Bid_Bond.pdf | ||
| J_4_Geology_Drawings_Combined_-353_Pages.pdf | ||
| J_2a_Drawings_-_Pages_111-229.pdf | ||
| J_3_Permits-743_pages.pdf | ||
| J_6_Past_Performance_Questionnaire.pdf | ||
| J_1_Wage_Determination_WA20230049.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions Answers
5 Section 01 64 40 Para. 1.04B it states delivery dates are listed in Table 01 64 40A. No dates are listed.
Section -1 64 40 Paragraph 2A states products will be furnished upon notice to proceed. Government furnished products are anticipated to be delivered as early as
04/01/2024.
6 Please provide submittal drawings for the FRP pipe that show the lengths and type of joint.
Government furnished product data has not been approved/received by the Government. The data can be provided once the Government has approved/ received.
Section 33 46 40 Para 2.07.A.2 states access hatch of size shown on the drawings. No size is shown on the drawings.
Section 33 46 40 Para 2.07.A.2 updated from "Cover shall be an aluminum floor access hatch of size shown on drawings." to "Cover shall be an aluminum floor access hatch of size that approximately matches the centerline dimensions of the concrete walls of the flume enclosure shown on drawing 33-D-61451, allows for proper anchorage of the hatch assembly, and allows for installation and servicing of the Parshall flume and stilling well, and protects the interior of the enclosure from ingress of debris."
How many light fixtures and receptacles are required in each Auxiliary Drain and Inspection Well number 1 and 2? Interior or exterior?
For light fixtures refer to drawings 33-D-61467 and section 26 51 10 Part 3.01 D.
For receptacles refer to spec section 26 27 30 Part 3.01 C.
Are the 480-volt receptacles required in each Auxiliary Drain and Inspection Well number 1 and 2?
Yes one per location, refer to spec section 26 27 30 Part 1.04 A.
Is there a specific transition enclosure requested from the 2” RMC from Panel P1 to receptacles and lights in each Auxiliary Drain and Inspection Well?
Follow guidelines on National Electric Code for propper transition.
HVAC control panel is calling out for a NEMA 4X enclosure, panelboard and transformer load center in spec section 262216-2 calls out for NEMA 250, 3R. Please confirm.
Provide NEMA 4X enclosure for HVAC control panel, per Drawings 33-D-61602 and -61467
Is the equipment on one-line drawings 33-D-61462, 33-D-61463, 33- D-61464 existing?
The equipment mention on drawings 33-D-61462, -61463, and -61464 will be installed by Reclamation prior to construction and we will update the drawings to reflect as built conditions.
Is there any electrical scope in the Generator Building, Electrical Building, Gauging Station?
No
14 What is the estimated distance between the existing generator building to Auxiliary drain inspection well number 1?
Please refer to drawings 33-D-61767 and 33-D-61771 to estimate a distance between the existing generator building and Auxiliary drain inspection well No. 1.
Sheet 33-D-61462; note 5 contractor is to supply the conductors from P1-2 to Panel P2. Sheet 33-D-61465; note 1 wire and conduit. Please confirm which note we are to follow.
Drawing 33-D-61462, note 5 states that contractor should supply conductors from panel P1 breaker P1-2 to incoming power for panel P2 inside the ispection well.
Drawing 33-D-61465 states the conduit size for the remaining conduit run from
Contract 1, final conduit installation on drawing 33-D-61626 to contract 3, inspection well drawing 33-D-61466.
Are any of the inspection wells classified as hazardous locations? If so, what class?
The space will be considered a permit required confined space while construction work is occurring. Once all equipment has been installed and tested/commissioned, the space will not have a CS or PRCS designation because it has been designed for continuous human occupancy and all hazards have been mitigated for.
Please provide a detail, shape, thickness, etc. for the PVC waterstop.
Section 03 15 12 Para. 2.02.B mentions a Standard Drawing 40-D-
6463 that is not included in the drawing set.
Standard Drawing 40-D-6463 should have been included in the reference drawings.
All information required for details, shape, thickness is included in drawing 40-D-
6463.
CLIN 7 is for 6-inch Strip Waterstop. The Specification Section tied to it is for PVC waterstop, same as CLIN 6 – 6-inch PVC Waterstop.
Where is this material used at? Need details for it also.
Specification Section 03 15 17- Hydrophylic Strip Waterstop has been added. 03 15 12 PVC Waterstop has been amended. 01 33 00 Submittals has been amended.
Price Schedule CLIN 7 has been changed to 1-inch Hydrophylic Waterstop.
Dwg. 33-D-61445 shows 1” hydrophillic waterstop. No specification, size, is given for this material.
Specification Section 03 15 17 - Hydrophylic Strip Waterstop has been added to provide additional information for this material.
Dwg. 33-D-61616, Steel Transition Anchoring detail. Please provide the Bureau’s perceived sequence of installation of the transition parts as it relates to these anchors. Items to consider:
A.Are/do either of the anchor nuts get welded to the liner? If so, before or after the anchor is installed?
B.Are the anchors installed before or after the liner is in place?
C.If the anchors are installed prior to the liner pieces being set, the anchors will not be parallel to each other due to the radius of the inside of the existing conduit and liner pieces. This prevents the liner pieces from being able to slip directly over the anchors.
D.The nut on the exterior side of the liner will not be accessible once the liner is set in place.
E.How is the anchor to be torqued per Section 35 21 95 Para 3.01.M? The interior side nut is basically flush with the liner surface per the anchor detail. A socket cannot be engaged.
F.Which nut is considered the primary nut, and which is the secondary as mentioned in Para. 3.01.M.10.g?
G.What is the finish requirement on the interior side of the lining at the anchor?
H.Torque values are to be designed in RSN 35 21 95-4 per 35 21 95 Para. 3.01.M.10b. What are the design considerations and at what point are they torqued?
A. Neither nut is welded B. They can be installed before or after the transition plates are in place
C. We agree with the observation. The intent of the design is to permit flexibility for the Contractor to set the transition, obtain the proper surfaces for weldments, and achieve a smooth fluidway.
D. We believe there is access from the downstream side of the transition
(sequencing of installation, tool extensions to access nuts, etc.).
E. Standoff nuts do not require the same amount of torque as clamping nuts, and a full torque wrench socket may not be needed for installation F. This language applies to the deflector plate anchors, not the steel transition.
G. Surface finish of interior of transition to meet requirements for coatings per
Section 09 96 20 Paragraph 3.09 Tabulation No.1. There is not a metal fabrication finish tolerance specified.
H. The torque values need to be sufficient to allow for installation of the steel transition plates when considering the weight of the plates and grouting pressure in the installed condition. Contractor is to follow adhesive anchor manufacturer's recommendations. The sequencing is determined by the Contractor.
Note: These responses are means and methods, we defer to the Contractor for the most effective method of installation
Does CLIN 9 – Concrete include all concrete shown for the project except the Mudmat?
Correct. The volume of concrete shown in CLIN 9 reflects the Cast-in-Place concrete required as shown in the final QEW for the following structures: Collar, Conduit, Headwall Outlet transition/channels and the parshall flume structure.
22 What material is to be included in CLIN 10 - Cementitious Material?
CLIN 10 can be removed because the contractor is responsible for mix designs.
Paragraph 1.01.B in Specification Section 03 30 00 has been deleted.
Please provide shop drawings for the steel pipe liner so locations and type of stulling (wood or steel) that will be furnished in the pipe can be known.
Government furnished product data has not been approved/received by the Government. The data can be provided once the Government has approved/ received.
Due to the amount of engineering and technical proposal requirements for specific work activities, plans and design we request a 4-week extension for bid submission.
The government will not be providing a 4 week extension for bid submission at this time, however the government will provide a 2 week proposal submission due date of February 23rd 2024.
Table 01 64 40A Government Furnished Products provides basic information, is there specific product / submittal information available for all Government furnished materials and can this be made available to the contractor prior to bid submission?
Government furnished product data has not been approved/received by the Government. The data can be provided once the Government has approved/ received.
Are there photos available of the outlet works structures?
Yes. Photos are provided in Specification Section 51 00 90 - Existing Conditions Within Outlet Works.
27 On-site safety Representative, can this person perform other duties?
No. Specification Section 01 35 30 - Contractor's Onsite Safety Personnel, Article
1.05, Paragraph B.12. has been deleted to clarify this question.
Document entitled “J_3_Permits-743_pages” (Page 37 of 743) has the snippet below. It states that a New Generator would be installed in a New Generator Building. Please confirm if these are to be built and installed. There is no mention of a New Generator in the drawings or the specifications.
New generator will already be installed in new generator building.
29 Please provide information regarding the FRP pipe type/manufacturer, joint type, joint length, pressure rating, temperature range, etc. JH
Government furnished product data has not been approved/received by the Government. The data can be provided once the Government has approved/ received.
Please confirm that all steel pipe liner joints have steel backing plates similar to the “Steel Transition to Steel Liner Backing Plate” Detail on Sheet 33-D-61615? Will the steel pipe liner be fabricated with the steel backing plates welded in-place?
The detail shown on 33-D-61615 is only for the connection from the Steel Transition to the first liner piece. See FIO DWG. 33-D-61609 for typical steel pipe liner joints. The steel pipe liner will be fabricated with backing plates welded on.
Please confirm that the 30 CFS bypass flows will be available within the “Reservoir pumping limit area” on Sheet 33-D-61773 for bypass pumping when Kachess Reservoir is fully drawn down during fall/winter period.
Yes. The reservoir will inundate a portion of the reservoir pumping limit area shown on Dwg 33-D-61773. The contractor is responsible for water diversion in accordance with the specifications. Water surface elevations fluctuate depending on the water year. 30 cfs is always passed during current operation for fish flows even during major drawdown.
Please provide clarification for what scope CLIN 4 Bid Item Interior Preparation/Cleaning covers. Section 01 74 00 does not provide details regarding cleaning or preparation of the tunnel interior.
01 74 00 has been updated to be a cost item.
Please provide clarification for what CLIN 10 Cementitious Material is for. Paragraph 1.01 B Measurement and payment for this items states volume, while CLIN 10 unit is per ton. The specification does not provide details for the scope of work for CLIN 10
CLIN 10 can be removed because the contractor is responsible for mix designs.
Paragraph 1.01.B in Specification Section 03 30 00 has been deleted.
Section 01 51 00 Temporary Utilities Paragraph 1.05.A provides for a 460V 50 Amp plug for Contractor’s use. Is this all available 460V 3- Phase power? Can the Government provide the contact information for the electric utility provider in Phase 2 so that an estimate can be provided for additional temporary power.
Yes. As indicated in paragraph 1.05.A., "Single-phase (120/240 Volt) electrical service power (with 4-prong twist-lock plug) and three-phase power (460 Volt, 50 Amp, 3 phase) at spare breaker of panelboard will be made available on site at new generator building shown on drawings."
Puget Sound Energy (PSE) contact - Dan Swan, 425-457-6485. Reclamation will pay for power use in accordance with Specification Section 01 51 00 - Temporary
Utilities.
Please confirm that the Government will pay for all temporary power use charges from the utility company with the exception of setup costs.
Correct. As indicated in paragraph 1.05.A. and 1.05.B of Specification Section 01 51 00 - Temporary Utilities, no charges will be made for power obtained from new generator building shown on drawings or from a location selected by Contractor. In accordance with paragraph 1.05.B., the establishment/setup of power at a location selected by Contractor (not at new generator building) will be at Contractor's expense.
Will a cofferdam outside the footprint of the lined outlet works channel be necessary to complete the concrete channel underdrain and relining work?
No. Note 8 on drawing 33-D-61411 indicates "Cofferdam may be located anywhere within the outlet works discharge channel downstream of the excavation limits."
Will the Government allow a two week bid extension to February 23rd to allow for sufficient time for proposal preparation?
Yes,proposal submission due date has been extended to February 23rd 2024
TECHNICAL SERVICE CENTER
WRITTEN SPECIFICATIONS SIGNATURE SHEET
Specifications Title:
Project Title:
Region:
Prepared: P.E.
Technical Approval: P.E.
Certified: P.E.
Kachess Dam Modification Phase 3
Update 1-30-24
Yakima Project, Washington
CPN
GERALD HORTON
Digitally signed by GERALD
HORTON
Date: 2024.01.29 08:51:48 -07'00'
Digitally signed by JUSTIN
CRUMMETT
Date: 2024.01.29 09:24:09 -07'00'
ROBERT CARLSON
Digitally signed by ROBERT
CARLSON
Date: 2024.01.30 13:51:21 -07'00'
Yakima Project, Washington Amendment No. 0003
Price Schedule (Revised) B - 1
CONTINUATION OF
SECTION B – SUPPLIES OR SERVICES AND PRICES
KACHESS DAM MODIFICATION PHASE 3
YAKIMA PROJECT, WASHINGTON
B.1 PRICE SCHEDULE
(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedules.
(b) Offers are subject to the terms and conditions of this solicitation.
(c) The Government will award Price Schedule A. Price Schedule B and C are optional price schedules that the Government is not required to exercise.
(d) Quantities in the Price Schedule are estimated quantities for comparison of offers only.
Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns. The contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.
(e) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.
(f) Definitions:
(1) CLIN – Contract Line Item Number
PRICE SCHEDULE A
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
1 WBR
1452.232 -81
Mobilization and Preparatory Work
For the lump sum of $
2 01 31 30 Contract Document Management System
For the lump sum of $
3 01 33 26 Complete Electrical System For the lump sum of $
4 01 74 00 Deleted
Price Schedule (Revised) B - 2
PRICE SCHEDULE A
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
5 02 41 07 Removal and Disposal of Existing Features
For the lump sum of $
6 03 15 12 6-inch PVC Waterstops 630 LF $ $
7 03 15 17 1-inch Hydrophilic Strip Waterstop
54 LF $ $
8 03 20 00 Concrete Reinforcing 200,000 lbs $ $
9 03 30 00 Concrete 690 yd3 $ $
10 03 30 00 Deleted
11 03 30 00 Mudmat 24 yd3 $ $
12 03 60 10 Backfill Grouting For the lump sum of $
13 03 81 10 Saw Cutting Existing Concrete, Full Depth
54 LF $ $
14 03 81 10 Saw Cutting Existing Concrete, 2-inch Depth
72 LF $ $
15 03 81 10 Concrete Removal 210 yd3 $ $
16 05 50 00 Miscellaneous Metalwork For the lump sum of $
17 22 09 23 Electromagnetic Flowmeter Systems
For the lump sum of $
18 22 14 30 Sump Pumping Systems For the lump sum of $
19 23 00 00 Heating, Ventilating, and Air Conditioning (HVAC) System
For the lump sum of $
20 26 05 02 Complete Electrical System For the lump sum of $
Table of Contents (Revised)
00 01 10 - 1
SECTION C - DESCRIPTION / SPECIFICATIONS
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 14 10 Use of Site 01 14 12 Work Restrictions and Limitations 01 14 20 Reservoir Operations 01 31 19 Project Management and Coordination 01 31 30 Contract Document Management System 01 32 10 Construction Program (New Version) 01 33 00 Submittals 01 33 26 Electrical Drawings and Data 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 30 Contractor’s Onsite Safety Personnel 01 35 50 Site Security 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 46 20 Testing Agency Services 01 51 00 Temporary Utilities 01 52 10 Field Office 01 55 00 Vehicular Access and Parking 01 55 20 Traffic Control 01 56 12 Protection of Existing Infrastructure 01 56 20 Existing Fences 01 56 32 Temporary Safety Fence 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 57 50 Tree and Plant Protection 01 57 60 Protected Species 01 57 90 Preservation of Historical and Archeological Data 01 60 00 Product Requirements 01 64 40 Government Furnished Products 01 71 20 Surveying 01 74 00 Cleaning and Waste Management 01 78 30 Project Record Documents
DIVISION 02 - EXISTING CONDITIONS
02 41 07 Removal and Disposal of Existing Features
DIVISION 03 - CONCRETE
00 01 10 - 2
03 11 10 Concrete Forming 03 15 12 PVC Waterstops 03 15 17 Hydrophylic Strip Waterstop 03 20 00 Concrete Reinforcing 03 30 00 Cast-In-Place Concrete 03 60 10 Backfill Grouting 03 62 20 Nonshrink Grout for Equipment and Metalwork 03 81 10 Concrete Removal
DIVISION 05 - METALS
05 50 00 Metal Fabrications
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 50 Spray-Applied Polyurethane Foam Insulation 07 92 00 Joint Sealants
DIVISION 08 - OPENINGS
08 31 20 Floor Access Hatches
DIVISION 09 - FINISHES
09 96 20 Coatings
DIVISION 22 - PLUMBING
22 09 23 Flowmeter Systems 22 14 30 Sump Pumping Systems
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 00 00 Heating, Ventilating, and Air Conditioning 23 31 00 HVAC Ducts and Castings 23 33 00 Air Duct Accessories 23 34 00 HVAC Fans 23 37 00 Air Outlets and Inlets 23 54 13 Electric Resistance Duct Heater 23 82 39 Electric Heat Units
DIVISION 26 - ELECTRICAL
26 05 02 Basic Electrical Materials and Methods 26 05 10 Conductors and Cables 26 05 20 Grounding and Bonding 26 05 33 Raceway and Boxes
00 01 10 - 3
26 22 16 Transformer Load Center 26 24 24 Distribution Panelboards 26 27 30 Wiring Devices 26 51 10 Interior Luminaires
DIVISION 31 - EARTHWORK
31 02 10 Water for Dust Abatement 31 03 10 Diversion and Care of Reservoir Releases During Construction 31 03 20 Cofferdam Construction 31 03 33 Removal and Control of Water 31 09 10 Abandoning and Removing Existing Instrumentation 31 09 20 Inspection Well Instrumentation 31 09 22 Protecting Existing Instrumentation 31 09 25 Vibrating Wire and Fiber Optic Piezometers 31 11 00 Clearing and Grubbing 31 14 10 Stripping 31 23 02 Compacting Earth Materials 31 23 12 Earthwork for Electrical Trench 31 23 16 Existing Embankment and Foundation Excavation 31 23 19 Use of On-site Stockpiled Material 31 23 39 Disposal of Excavated Material 31 24 10 Embankment Construction 31 24 12 Zone 3 - Sand Filter Material 31 24 13 Zone 4 - Gravel Drain Material 31 24 14 Zone 5 - Compacted Backfill Material 31 24 15 Zone 3A - 50/50 Sand Filter Material/Gravel Drain Material Mix 31 25 10 Erosion Control 31 32 32 Geotextile 31 37 00 Outlet Works Channel Reconstruction 31 37 10 Zone 6 – Cobble Slope Protection
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 15 04 Remove Existing Gravel Surfacing 32 15 10 Gravel Surfacing 32 91 20 Placing Topsoil 32 91 60 Topsoil Erosion Control Matting 32 92 20 Seeding
DIVISION 33 - UTILITIES
33 09 12 Inspection Wells 33 42 50 Reinforced Concrete Pipe Culvert 33 46 36 HDPE Drain Pipe 33 46 40 Parshall Flum
00 01 10 - 4
DIVISION 34 - TRANSPORTATION
34 71 10 W-Beam Guardrail
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 21 94 Steel Transition and Steel Deflector Plates 35 21 95 Installation of Steel Transition, Steel Deflector Plates, and Government Furnished
Pipe 35 22 15 Installation of Government Furnished Pluger Valves
FDIVISION 51 - INFORMATION AVAILABLE TO OFFERORS
51 00 00 Information Available to Offerors 51 00 10 Climatological Data 51 00 20 Reservoir Time History and Forecasted Reservoir Operations During
Construction 51 00 30 Evaluation of Potential Filter Sand Sources 51 00 35 Friable Particle Count Method 51 00 50 Electronic Media Release 51 00 60 Instrumentation Data 51 00 70 Geotechnical Laboratory Testing Results 51 00 80 Water Quality Monitoring Plan 51 00 90 Existing Conditions Within Outlet Works
DIVISION 52 - DRAWINGS
52 00 00 Drawings
DIVISION 53 - GEOLOGIC INVESTIGATIONS AND RECORDS
53 10 00 Geologic Investigations 53 20 00 Records of Geologic and Subsurface Investigations
END OF CONTENTS
Submittals (Revised)
01 33 00 - 9
Table 01 33 00A - List of Submittals
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 -
Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Type
CP
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
10 Security Requirements
(WBR 1452.237-
80)
Security Program Submitted and approved before mobilization
A COR CDMS
01 14 10-1 Use of Site Land Use and Landscape Rehabilitation Plan
Submitted and approved at least 28 days before mobilization
A COR CDMS
01 14 10-2 Use of Site Site Security Plan Submitted and approved at least 28 days before mobilization
A COR CDMS
01 14 10-3 Use of Site Finished Grading Plan
Submitted and approved at least 28 days before mobilization
A COR CDMS
01 14 12-1 Work Restriction and Limitations
Construction Sequencing Plan
Submitted and approved at least 28 days before mobilization
A COR CDMS
01 31 19-1 Project Management and Coordination
Weekly Coordination Meeting Documentation
Submitted at least 24 hours before meeting
I COR CDMS
01 31 30-1 Contract Document Management System
Approval Data Within 10 calendar days after award
A COR CDMS
01 31 30-2 Contract Document Management System
Final Data Within 14 days after completing work.
A COR CDMS
01 32 10-1 Construction Program
Representative Information
Within 10 days of
NTP
A COR CDMS
01 32 10-2 Construction Program
Baseline Schedule Within 10 Days of
NTP
A COR CDMS
01 32 10-3 Construction Program
Updated Schedule Reports
Submitted monthly A COR CDMS
01 32 10-4 Construction Program
Time Impact Analysis
With appropriate changes or as requested by the
CO
A COR CDMS
01 33 00 - 10
Table 01 33 00A - List of Submittals
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 -
Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Type
CP
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
01 35 10-1 Safety Data Sheets
Complete LHM and SDS
Submitted and approved at least 28 days before mobilization
A COR CDMS
01 35 10-2 Safety Data Sheets
Updated LHM and
SDS
At least 28 days before jobsite delivery of hazardous material not previously listed
A COR CDMS
01 35 20-1 Safety and Health
Safety and Health Program.
Within 30 days of NTP and at least 28 days before mobilization
A COR CDMS
01 35 20-2 Safety and Health
Monthly Accident Summary Report
At least 28 days before the start of the specified construction activities
A COR CDMS
01 35 20-3 Safety and Health
Respirator User Documentation
At least 28 days before the start of the specified construction activities
A COR CDMS
01 35 20-4 Safety and Health
Crane Operation Certificates
At least 28 days before the start of the specified construction activities
A COR CDMS
01 35 20-5 Safety and Health
Other Training Certificates
At least 28 days before the start of the specified construction activities
A COR CDMS
01 35 30-1 Contractor’s On-site Safety Personnel
Qualifications Submitted and accepted at least 28 days prior to mobilization
A COR CDMS
01 35 30-2 Contractor’s On-site Safety Personnel
Safety Inspection Reports
Monthly I COR CDMS
01 33 00 - 11
Table 01 33 00A - List of Submittals
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 -
Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Type
CP
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
01 46 00-1 Quality Procedures
Contractor Quality Control Plan (QC)
Submitted and approved at least 28 days prior to mobilization
A COR CDMS
01 46 00-2 Quality Procedures
Contractor’s Daily Report
Weekly I COR CDMS
01 46 00-3 Quality Procedures
Quality Control Supervisor (QCS) Resume
Submitted and approved at least 28 days prior to mobilization
A COR CDMS
01 46 00-4 Quality Procedures
Contractor’s Quality Testing Plan
Submitted and approved at least 28 days prior to mobilization
A COR CDMS
01 46 00-5 Quality Procedures
Summary of Monthly Test Results
Monthly I COR CDMS
01 46 20-1 Testing agency Services
Testing Agency Services Plan
Submitted and approved at least 28 days prior to mobilization
A COR CDMS
01 51 00-1 Temporary Utilities
Temporary Water Access Plan
Submitted and approved at least 28 days prior to mobilization
A COR CDMS
01 51 00-2 Temporary Utilities
Temporary Electrical Power Plan
Submitted and approved at least 28 days prior to mobilization
A COR CDMS
01 55 00-1 Vehicular Access and Parking
Initial Digital Photographic Record
Submitted and approved at least 28 days prior to mobilization
A COR CDMS
01 55 00-2 Vehicular Access and Parking
Post Construction Digital Photographic Record
At least 2 days before demobilization
I COR CDMS
01 55 00-3 Vehicular Access and Parking
Post Repair Digital Photographic Record
Within 14 days of making repairs
01 33 00 - 12
Table 01 33 00A - List of Submittals
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 -
Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Type
CP
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
01 55 00-4 Vehicular Access and Parking
Use of Dam Crest for Hauling Operations
Submitted and approved at least 28 days prior to mobilization
A COR CDMS
01 55 00-5 Vehicular Access and Parking
Use of Outlet Works Conduit Crossing for Hauling Operations
Submitted and approved at least 28 days prior to mobilization
A COR CDMS
01 55 20-1 Traffic Control Traffic Control Plan
Submitted and approved at least 28 days prior to mobilization
A COR CDMS
01 56 12-1 Protection of Existing Infrastructure
Plan for Protecting Existing Infrastructure
Submitted and approved at least 28 days prior to mobilization
A COR CDMS
01 57 20-1 Environmental Controls
Copy of Applicable Air Quality Permit
Submitted and approved at least 28 days prior to mobilization
A COR CDMS
01 57 20-2 Environmental Controls
Noise Monitoring Plan
Submitted and approved at least 28 days prior to mobilization
A COR CDMS
01 57 20-3 Environmental Controls
Noise Monitoring Reports
Submit daily and week batches
A COR CDMS
01 57 30-1 Water Pollution Control
Pollution Prevention Plan
Submitted and approved at least 28 days prior to mobilization
A COR CDMS
01 57 30-2 Water Pollution Control
Water Quality Monitoring Plan
Submitted and approved at least 28 days prior to mobilization
A COR CDMS
01 57 30-3 Water Pollution Control
Spill Prevention, Control, and Countermeasure (SPCC) Plan
Submitted and approved at least 28 days before delivery or storage of oil
A COR CDMS
01 57 30-4 Water Pollution Control
Sedimentation Control Plan
Submitted and approved at least 28 days prior to mobilization
A
COR CDMS
01 33 00 - 13
Table 01 33 00A - List of Submittals
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 -
Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Type
CP
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
01 57 30-5 Water Pollution Control
Water Quality Monitoring Reports
Submit daily and weekly summary results
01 57 30-6 Water Pollution Control
Straw Wattle Certification
Submitted and approved at least 28 days prior to
01 57 50-1 Tree and Plant Protection
Protection Plan Submitted and approved at least 28 days prior to mobilization
A COR CDMS
01 57 90-1 Preservation of Historical and Archaeological Data
Request for Additional Areas of Disturbance
At least 45 days before the start of any additional disturbance activities proposed
A COR CDMS
01 64 40-1 Government Furnished Products
Shortage Report At least 28 days before starting onsite work
A COR CDMS
01 71 20-1 Surveying Surveying Plan At least 28 days before beginning survey work
A COR CDMS
01 71 20-2 Surveying Resumes At least 28 days before beginning survey work; At least 28 days before personnel change
A COR CDMS
01 71 20-3 Surveying Accuracy Check Results
At least 14 days before beginning survey work
A COR CDMS
01 71 20-4 Surveying Completed and Reduced Survey Notes
Within 2 days of completing each set of survey notes
I COR CDMS
01 71 20-5 Surveying Quantity Survey Notes and Computations
Submitted and approved for progress payments
A COR CDMS
01 74 00-1 Cleaning and Waste Management
Hazardous Waste Management Plan
Submitted and approved at least 28 days prior to
01 33 00 - 14
Table 01 33 00A - List of Submittals
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 -
Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Type
CP
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
01 74 00-2 Cleaning and Waste Management
Waste Production and Disposal Plan
Submitted and approved at least 28 days prior to mobilization
A COR CDMS
01 74 00-3 Cleaning and Waste Management
Waste Production and Disposal Records
Within 7 days of waste disposal
I COR CDMS
01 74 00-4 Cleaning and Waste Management
Environmental Site Assessment and Environmental Consultant Resume
At least 28 days before beginning environmental assessment
A COR CDMS
01 78 30-1 Project Record Documents
Final As-built Drawings
Within 28 days of completion of work
A COR CDMS
01 78 30-2 Project Record Documents
AutoCAD Set of Final As-built Drawings
Within 28 days of completion of work
A COR CDMS
02 41 07-1 Removal and Disposal of Existing Features
Removal of Existing Features Plan
At least 28 days before starting onsite work
A COR CDMS
03 11 10-1 Concrete Forming
Formwork Design and Drawings
At least 28 days before starting onsite work
A COR CDMS
03 15 12-1 PVC Waterstops Purchase Orders At least 28 days before starting onsite work
A COR CDMS
03 15 12-2 PVC Waterstops Samples At least 28 days before starting onsite work
A COR CDMS
03 15 12-3 PVC Waterstops Certificates At least 28 days before starting onsite work
A COR CDMS
03 15 12-4 PVC Waterstops Drawings At least 28 days before starting onsite work
A COR CDMS
03 15 12-5 PVC Waterstops Instructions At least 28 days before starting onsite work
A COR CDMS
03 15 17-1 Hydrophilic Strip Waterstop
Product Data At least 28 days before starting onsite work
01 33 00 - 15
Table 01 33 00A - List of Submittals
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 -
Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Type
CP
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
03 15 17-2 Hydrophilic Strip Waterstop
Certification At least 28 days before starting onsite work
A COR CDMS
03 15 17-3 Hydrophilic Strip Waterstop
Instructions At least 28 days before starting onsite work
A COR CDMS
03 20 00-1 Concrete Reinforcing
Reinforcement Diagrams and Lists
At least 28 days before starting onsite work
A COR CDMS
03 30 00-1 Cast-in Place Concrete
Approval Data At least 28 days before starting onsite work
A COR CDMS
03 30 00-2 Cast-in Place Concrete
Concrete Placement Drawings
At least 28 days before starting onsite work
A COR CDMS
03 30 00-3 Cast-in Place Concrete
Concrete Placement Schedule
At least 28 days before starting onsite work
A COR CDMS
03 30 00-4 Cast-in Place Concrete
RSMC
Temperature Control Plan
At least 28 days before starting onsite work
A COR CDMS
03 30 00-5 Cast-in Place Concrete
Certifications At least 28 days before starting onsite work
A COR CDMS
03 30 00-6 Cast-in Place Concrete
Test Reports Within 7 days after test
I COR CDMS
03 60 10-1 Backfill Grouting Approval Data At least 28 days before starting onsite work
A COR CDMS
03 60 10-2 Backfill Grouting Grouting Plan At least 28 days before starting onsite work
A COR CDMS
03 60 10-3 Backfill Grouting Test Reports Within 7 days after test
A COR CDMS
03 60 10-4 Backfill Grouting Resume At least 28 days before starting onsite work
A COR CDMS
03 81 10-1 Concrete Removal
Concrete Removal Plan
At least 28 days before starting
01 33 00 - 16
Table 01 33 00A - List of Submittals
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 -
Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Type
CP
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
07 21 50-1 Sprayed-applied Polyurethane Foam Insulation
Approval Data At least 28 days before starting onsite work
A COR CDMS
07 92 00-1 Joint Sealants Approval Data At least 28 days before starting onsite work
A COR CDMS
07 92 00-2 Joint Sealants Certifications At least 28 days before starting onsite work
A COR CDMS
07 92 00-3 Joint Sealants Instructions At least 28 days before starting onsite work
A COR CDMS
07 92 00-4 Joint Sealants Contractors Field Quality Verification Report
Within 7 days after completing work
I COR CDMS
08 31 20-1 Floor Access Hatches
Product Data At least 28 days before starting onsite work
A COR CDMS
09 96 20-1 Coatings Approval Data At least 28 days before starting onsite work
A COR CDMS
09 96 20-2 Coatings Final Approval Data
Within 14 days after completing work
I COR CDMS
09 96 20-3 Coatings Paint Chip Samples
At least 28 days before starting onsite work
A COR CDMS
09 96 20-4 Coatings Qualifications At least 28 days before starting onsite work
A COR CDMS
09 96 20-5 Coatings Quality Control Plan
At least 28 days before starting onsite work
A COR CDMS
09 96 20-6 Coatings Contractor Quality Testing Final Report
Within 7 days after test
I COR CDMS
22 09 23-1 Flowmeter System
Approval Data At least 28 days before starting
01 33 00 - 17
Table 01 33 00A - List of Submittals
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 -
Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Type
CP
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
22 09 23-2 Flowmeter System
Final Data At least 14 days after completing onsite work
A COR CDMS
22 14 30-1 Sump Pumping Systems
Approval Data At least 28 days before fabricating or procuring sump pumping systems
A COR CDMS
22 14 30-2 Sump Pumping Systems
Test Plan At least 28 days before starting onsite work
A COR CDMS
22 14 30-3 Sump Pumping Systems
Final Data Within 14 days after test
I COR CDMS
23 00 00-1 Heating, Ventilating, and Air-Conditioning (HVAC) Systems
Approval Drawings
At least 28 days before beginning installation of heating, ventilating, and air-conditioning (HVAC) system components
A COR CDMS
23 00 00-2 Heating, Ventilating, and Air-Conditioning (HVAC) Systems
Final Drawings Within 14 days after completing installation of heating, ventilating, and air conditioning (HVAC) system components
A COR CDMS
23 31 00-1 HVAC Ducts and Castings
Approval Data At least 28 days before fabricating or procuring ducts –
HVAC
A COR CDMS
23 33 00-1 Air Duct Accessories
Approval Data At least 28 days before fabricating or procuring air duct accessories
A COR CDMS
23 33 00-2 Air Duct Accessories
Final Data Within 14 days after installation of air duct accessories
A COR CDMS
23 34 00-1 HVAC Fans Approval Data At least 28 days before fabricating or procuring fans -
HVAC
01 33 00 - 18
Table 01 33 00A - List of Submittals
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 -
Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Type
CP
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
23 34 00-2 HVAC Fans Final Data Within 14 days after installation of fans - HVAC
I COR CDMS
23 37 00-1 Air Inlets and Outlets
Approval Data At least 28 days before fabricating or procuring air inlets and outlets
A COR CDMS
23 54 13-1 Electrical Resistance Duct Heater
Approval Data, Drawings, and Test Plan
At least 28 days before fabricating or procuring air inlets and outlets
A COR CDMS
23 54 13-2 Electrical Resistance Duct Heater
Final Drawings and Data
Within 14 days after completing installation of heating, ventilating, and air conditioning (HVAC) system components
A COR CDMS
23 82 39-1 Electrical Heat Units
Approval Drawings and Data
At least 28 days before beginning installation of heating, ventilating, and air-conditioning (HVAC) system components
A COR CDMS
23 82 39-2 Electrical Heat Units
Final Drawings and Data
Within 14 days after completing installation of heating, ventilating, and air-conditioning (HVAC) system components
A COR CDMS
26 05 10-1 Conductors and Cables
Approval Data At least 28 days before starting onsite work
A COR CDMS
26 05 10-2 Conductors and Cables
Field Test Reports Within 14 days after test
I COR CDMS
26 05 20-1 Grounding and Bonding
Approval Data At least 28 days before starting onsite work
A COR CDMS
26 05 20-2 Grounding and Bonding
As-built Drawings Within 14 days after completing work
01 33 00 - 19
Table 01 33 00A - List of Submittals
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 -
Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Type
CP
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
26 05 20-3 Grounding and Bonding
Test Reports Within 14 days after test
I COR CDMS
26 05 33-1 Raceways and Boxes
As-built Drawings Within 14 days after completing work
A COR CDMS
26 22 16-1 Transformer Load Center
Approval Data At least 28 days before starting onsite work
A COR CDMS
26 22 16-2 Transformer Load Center
Approval Drawings
At least 28 days before starting onsite work
A COR CDMS
26 22 16-3 Transformer Load Center
Operation and Maintenance Instruction Book
Within 14 days after completing work
A COR CDMS
26 24 24-1 Distribution Panelboards
Approval Data At least 28 days before starting onsite work
A COR CDMS
26 24 24-2 Distribution Panelboards
Factory Test Reports
Within 14 days after test
I COR CDMS
26 24 24-3 Distribution Panelboards
Operation and Maintenance Instruction Book
Within 14 days after completing work
A COR CDMS
26 24 24-4 Distribution Panelboards
Final Drawings and Data
Within 14 days after completing work
A COR CDMS
26 24 24-5 Distribution Panelboards
Field Test Reports Within 7 days after test
I COR CDMS
26 27 30-1 Wiring Devices Approval Data At least 28 days before starting onsite work
A COR CDMS
26 51 10-1 Interior Luminaires
Approval Data At least 28 days before starting onsite work
A COR CDMS
31 02 10-1 Water for Dust Abatement
Dust Abatement Plan
At least 28 days before starting onsite work
A COR CDMS
31 03 10-1 Diversion and Care of Reservoir Releases During Construction
Qualifications At least 28 days before starting
01 33 00 - 20
Table 01 33 00A - List of Submittals
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 -
Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Type
CP
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
31 03 10-2 Diversion and Care of Reservoir Releases During Construction
Diversion Plan At least 28 days before starting onsite work
A COR CDMS
31 03 20-1 Cofferdam Construction
Cofferdam Design At least 28 days before starting onsite work
A COR CDMS
31 03 20-2 Cofferdam Construction
Cofferdam Construction Plan
At least 28 days before starting onsite work
A COR CDMS
31 03 20-3 Cofferdam Construction
Certification and Quality Assurance Documentation
At least 28 days before starting onsite work
A COR CDMS
31 03 33-1 Removal and Control of Water
Unwatering Plan At least 28 days before starting onsite work
A COR CDMS
31 03 33-2 Removal and Control of Water
Qualifications At least 28 days before starting onsite work
A COR CDMS
31 03 33-3 Removal and Control of Water
Unwatering Reports
Submit weekly reports
A COR CDMS
31 03 33-4 Removal and Control of Water
Primary and Standby Power for Unwatering Systems
At least 28 days before starting onsite work
A COR CDMS
31 03 33-5 Removal and Control of Water
Abandonment Plan
At least 28 days before starting onsite work
A COR CDMS
31 09 10-1 Abandoning and Removing Existing Instrumentation
Abandoning and Removing Existing Instrumentation Plan
At least 28 days before starting onsite work
A COR CDMS
31 09 10-2 Abandoning and Removing Existing Instrumentation
Instrument Abandonment Closeout
Within 14 days after completing work
A COR CDMS
31 09 20-1 Inspection Well Instrumentation
Approval Data At least 28 days before starting
01 33 00 - 21
Table 01 33 00A - List of Submittals
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 -
Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Type
CP
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
31 09 20-2 Inspection Well Instrumentation
Final Data Within 14 days after completing work
A COR CDMS
31 09 22-1 Protecting Existing Instrumentation
Protecting Existing Instrumentation Plan
At least 28 days before starting onsite work
A COR CDMS
31 09 22-2 Protecting Existing Instrumentation
Post-Modification Inspection
At least 28 days before starting onsite work
A COR CDMS
31 09 25-1 Vibrating Wire and Fiber Optic Piezometers
Installation Plan At least 28 days before starting onsite work
A COR CDMS
31 09 25-2 Vibrating Wire and Fiber Optic Piezometers
As-built Reports and Drawings
Within 14 days after completing work
A COR CDMS
31 09 25-3 Vibrating Wire and Fiber Optic Piezometers
Fiber Optic Splicing Method and Personnel
At least 28 days before starting onsite work
A COR CDMS
31 23 02-1 Compacting Earth Materials
Test Results Within 7 days after test
I COR CDMS
31 23 16-1 Existing Embankment and Foundation Excavation
Excavation of Existing Dam Embankment and Foundation Plan
At least 28 days before starting onsite work
A COR CDMS
31 23 16-2 Existing Embankment and Foundation Excavation
Temporary Slope Protection/Erosion Control Plan
At least 28 days before starting onsite work
A COR CDMS
31 23 16-3 Existing Embankment and Foundation Excavation
Temporary Dam Crest Measurement Points and Monitoring
At least 28 days before starting onsite work
A COR CDMS
31 23 16-4 Existing Embankment and Foundation Excavation
Excavation for New Auxiliary Drain Plan
At least 28 days before starting onsite work
A COR CDMS
31 24 10-1 Embankment Construction
Embankment Construction Plan
At least 28 days before starting
01 33 00 - 22
Table 01 33 00A - List of Submittals
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 -
Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Type
CP
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
31 24 12-1 Zone 3 - Sand Filter Material
Certification and Laboratory Test Results
At least 28 days before starting onsite work
A COR CDMS
31 24 13-1 Zone 4 - Gravel Drain Material
Certification and Laboratory Test Results
At least 28 days before starting onsite work
A COR CDMS
31 24 15-1 Zone 3A - 50/50 Sand Filter Material/Gravel Drain Material Mix
Material Processing Plan
At least 28 days before starting onsite work
A COR CDMS
31 24 15-2 Zone 3A - 50/50 Sand Filter Material/Gravel Drain Material Mix
Certification and Laboratory Test Results
Within 7 days after completing work
A COR CDMS
31 25 10-1 Erosion Control Erosion Control Plan
At least 28 days before starting onsite work
A COR CDMS
31 25 10-2 Erosion Control Straw Certifications
At least 28 days before starting onsite work
A COR CDMS
31 32 32-1 Geotextile Manufacturer's Certification
At least 28 days before starting onsite work
A COR CDMS
31 32 32-2 Geotextile Protection Method At least 28 days before starting onsite work
A COR CDMS
31 37 00-1 Outlet Works Channel Reconstruction
Outlet Works Channel Reconstruction Plan
At least 28 days before starting onsite work
A COR CDMS
32 15 10-1 Gravel Surfacing Certification and Laboratory Test Results
At least 28 days before starting onsite work
A COR CDMS
32 91 60-1 Topsoil Erosion Control Matting
Manufacturer’s Information
At least 28 days before starting onsite work
A COR CDMS
32 91 60-2 Topsoil Erosion Control Matting
Installation Plan At least 28 days before starting
01 33 00 - 23
Table 01 33 00A - List of Submittals
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 -
Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Type
CP
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
32 92 20-1 Seeding Seeding Plan At least 28 days before starting onsite work
A COR CDMS
32 92 20-1 Seeding Statement of Qualifications
At least 28 days before starting onsite work
A COR CDMS
33 09 12-1 Inspection Wells Certifications At least 28 days before starting onsite work
A COR CDMS
33 09 12-2 Inspection Wells Shop Drawings At least 28 days before starting onsite work
A COR CDMS
33 09 12-3 Inspection Wells Product Data and Test Reports
At least 28 days before starting onsite work
A COR CDMS
33 42 50-1 Reinforced Concrete Pipe Culvert
Approval Data At least 28 days before starting onsite work
A COR CDMS
33 46 36-1 HDPE Drain Pipe
Approval Data At least 28 days before starting onsite work
A COR CDMS
33 46 36-2 HDPE Drain Pipe
Certifications At least 28 days before starting onsite work
A COR CDMS
33 46 36-3 HDPE Drain Pipe
Final Inspection Video
Within 14 days after completing work
A COR CDMS
33 46 40-1 Parshall Flume Flume Installation Plan
At least 28 days before starting onsite work
A COR CDMS
34 71 10-1 W-Beam Guardrail
Certifications At least 28 days before starting onsite work
A COR CDMS
35 21 94-1 Steel Transition and Steel Deflector Plates
Shop Drawings At least 42 days prior to beginning fabrication
A COR CDMS
35 21 94-2 Steel Transition and Steel Deflector Plates
Certification and Requirements for Steel Transition and Steel Deflector Plates
At least 28 days prior to beginning fabrication
01 33 00 - 24
Table 01 33 00A - List of Submittals
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 -
Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Type
CP
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
35 21 94-3 Steel Transition and Steel Deflector Plates
Instructions for Transporting, and Handling
At least 28 days before transporting
A COR CDMS
35 21 94-4 Steel Transition and Steel Deflector Plates
Shipping Inspection Reports
Within 14 days after arrival onsite
A COR CDMS
35 21 95-1 Installation of Steel Transition, Steel Deflector Plates, and Government Furnished Pipe
Certifications and Requirements for Installation and Inspection of Government Furnished Pipe
At least 28 days before starting onsite work
A COR CDMS
35…