C06_01_Amend_5_-_24B0001-0005_(RELEASED)_7-22-24_0005.pdf

PDF 414 KB Posted

Attached to
Amendment 0006 -- HH Potable H20 Conveyance System Federal contract opportunity
Solicitation number
140R1024B0001
Issued by
Department of the Interior Bureau of Reclamation

About this file

This document is Amendment 5 to Solicitation 140R1024B0001 for the Hungry Horse Potable Water Conveyance System project. The amendment provides the following key information:

  1. A full list of government responses to questions from the 5/29/2024 pre-bid site visit. The responses address various technical, security, and logistical aspects of the project.
  2. The bid opening date remains unchanged at Wednesday, 7/31/2024 at 2:00 PM MST.
  3. All 5 solicitation amendments must be acknowledged by the contractor for their bid to be considered responsive.

The related federal contract opportunity is for the Hungry Horse Potable Water Conveyance System project, issued by the Department of the Interior Bureau of Reclamation. The solicitation number is 140R1024B0001.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140R1024B0001 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Boise ID 83706-1234 1150 N. Curtis Road, Ste. 100

R10

Acquisition Management Division Regional Office Pacific Northwest Region Bureau of Reclamation

07/22/20240005

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/13/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment #5 (0005) is to provide the following information:

1. Provide a full and complete list of government responses to questions stemming from

5/29/2024 pre-bid site visit. (8 pages)

2. This bid opportunity remains UNCHANGED, and bid opening will take place on:

Wed, 7/31/2024 at 2:00 PM MST.

3. ALL 5 (FIVE) SOLICITATION AMENDMENTS SHALL BE ACKNOWLEDGED BY THE CONTRACTOR FOR THEIR

RESPECTIVE BID TO BE CONSIDERED RESPONSIVE.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

FINAL Questions & Answers: 140R1024B0001-0005 (7-22-2024) Hungry Horse Potable Water Conveyance System

1 | P a g e

Question #1: I have a question about spec section 432426. We are not having any luck w/ our VT pump manufacturer's being able to hit that duty point of 33 gpm @ 712' TDH. I'm curious if a well pump is more inline with what you're needing?

Government Response: The pump required is as listed in the Specifications and Drawings.

Question #2: I did not attend the site visit. I sent our superintendent instead. I assumed he would get pictures but pictures weren't allowed. Are you able to send me pictures? Any way I can get a site visit?

Government Response: All relevant pictures are available in the drawing specs. During the initial briefing when the safety briefing was being accomplished the facility manager advised to do security protocols no internal photos and or videos could be captured of the facility. All relevant photos for the projects are on the drawings. Unfortunately coordinating another site visit is not possible…many BOR personnel traveled in from out of state towards accomplishing yesterday’s event.

Specific additional photos may be requested by those who attended the site visit as discussed on site. Requests need to be very specific to ensure the correct photos are taken.

Question #3: RFI Per L.26; Offerers are to submit proposals on forms furnished (SF 1442 and continuation sheet) by the government. Questions: Is there a list of other attachments to include or are attachments needed? I would assume at least the bid bond needs to be attached.

Government Response: The specification language speaks for itself.

Question #4: RFI Spec section 01 31 30, states that the Contractor is to provide a "Contract Document Management System" for both the contractor and the government to use. Question: Is this applicable for this project? If this is applicable for this project, is there software the government prefers? There are a lot of different projects out there.

Government Response: Any program that meets the Specifications.

Question #5: RFI Question: Are there on site staffing requirements? On a project this size, I would assume the superintendent could be both the Safety Officer and primary supervisor.

Government Response: This is possible assuming all qualifications of both positions are met.

Question #6: Is access to well only allowed by crossing the concrete access bridge on the left abutment?

Government Response: The BPA Bridge is the only access available to the well site. There is no downstream access point.

2 | P a g e

Question #7: What is the weight limit on the bridge and dimensions?

Government Response: Bridge load design is HS 20-44. See Specifications for notes on loads over this crossing the bridge. The bridge is approximately 55-feet long, and 14-feet wide (outside edge to outside edge)

Question #8: Can you provide the bridge analysis?

Government Response: Bridge load design is HS 20-44. See Specifications for notes on loads over this crossing the bridge.

Question #9: Is there a Geotech available for the HDD boring alignment or well installed to date?

Government Response: Drilling reports from construction of the well are attached.

Question #10: Will there be any issues with the HDD alignment running underneath the existing communication building and equipment on the left abutment?

Government Response: The Specification Package speaks for itself.

Question #11: Is it expected for a new concrete landing to be installed outside of adit with new handrail?

Government Response: Damage to concrete or sections removed shall be replaced to match existing.

Question #12: How is new handrail to connect to existing handrail, and do you have specifications on the handrail?

Government Response: Sections removed shall be reinstalled or replaced to match existing.

Question #13: There was an electrical ped noticed along the side of the access road to the well. Are there asbuilts as to where that runs, and if it will interfere with well modifications and HDD operations?

Government Response: What looks like an electrical pedestal is a seismic monitoring device. There is a buried conduit that runs up the of the road towards the plant. PER the FAR and Specifications all existing utilities are to be protected.

Question #14: Grates in the elevator chase, are those to be cut or replaced when installing the new water line conduit? If cut, will each need to be removed and modified with guarding and then reinstalled? Or is it intended to modify while in-place?

3 | P a g e

Government Response: The specification and drawings speak for itself.

Question #15: Plansheet 447-100-60509 shows all three conduits (2” PW, 1” DC, and 2” AC going through adit door together in one profile, but plansheet 447-100-60510, detail A & B show them separated. Can you provide better detail how you want this transition?

Government Response: Work to be completed as seen on sheet 447-100-60510 Details A and B

Question #16: Plansheet 447-100-605012, will there be any guarding around the Block 14 hydropneumatic tank detail as the location is outside of the elevator door?

Government Response: There will be a guardrail around the tank. See new sheet 477-100-60516 attached*

Question #17: Will contractor need to be escorted at all times?

Government Response: No.

Question #18: Will special security clearance need to be required for all workers onsite (General contractor, subcontractors, and vendors coming to site) before work can commence

Government Response: The specification language speaks for itself.

Question #19: What level of security clearance and where can that be obtained?

Government Response: The specification language speaks for itself.

Question #20: Is an external job-trailer required and will amenities need to be provided for the BOR and

EOR?

Government Response: The specification language speaks for itself.

Question #21: Will the contractor be allowed a staging and workspace within the powerplant?

Government Response: Staging areas are shown on plan sheets.

Question #22: Has lead time been taken into account for specialty electrical components that need to be ordered?

Government Response: Contract assumes standard lead times.

Question #23: Additional Photos Requested Penetration inside/outside of Adit for existing conduit and where new conduit is required to go.

Grates in elevator chase block 19 Connection point of new water line to vertical pipe chase existing water line in block 14.

4 | P a g e

Photo of power plant adit and where the line water line is to run (floor pipe chase)?

Photos of room 309 and 409 where new waterline is to run?

Government Response: See Attachment

Question #24: Will the BOR entertain the request to postpone the bid date to 6/26?

Government Response: Reference amendment actions posted on Governmentwide Point of Entry SAM.gov.

Question #25: Will potential workers have to commute to Browning for background checks/paperwork?

Government Response: The specification language speaks for itself.

Question #26: Can the elevator(s) be utilized by contractors to move personnel and materials? Any restrictions that may apply? Assumed Block 14 elevator will only be utilized?

Government Response: Elevators have a load capacity rating that cannot be exceeded and require key card access for use.

Question #27: Will the contractor have to be escorted at all times by a member of the dam’s staff?

Government Response: The specification language speaks for itself.

Question #28: Does the site have any additional entrances (east side?) to the inspection gallery to allow access for materials up to 20 feet in length?

Government Response: If this question is asking if there are any openings on the east side of the dam (i.e.

the forebay side when looking at a map for east), then no, there are not. There are four accesses to the roadway gallery: one at each end that is security controlled and must be locked when not in use and daily, and an entrance within each elevator tower to the roadway. Best options for material entry to roadway are the towers but would have to be lowered to that floor via stairwell (elevators can't handle 20 foot sections by my estimation).

Question #29: Any particular detail for concrete core drill penetrations? Link Seal? Grout?

Government Response: See Specifications and new plan sheet 447-100-60516 attached *

Question #30: Vertical pipe chase: Will new penetrations require any sort of guarding/protection from sharp edges? Will the expanded metal need to be removed for adding the new penetrations to avoid falling objects/hot work slag going down the vertical shaft?

Government Response: The specification language speaks for itself.

5 | P a g e

Question #31: Does the existing facility have any prior anchoring provisions/requirements for work within the vertical shaft access points at each level?

Government Response: All new anchor points for personnel protection must be inspected and approved by a PE unless they are pre-engineered anchors such as the HILTI swivel anchors that have manufacturer installation requirements and usage requirements that MUST be followed.

Question #32: Has a laydown/stored material area been identified at the site? Location?

Government Response: The specification language speaks for itself.

Question #33: Is this project tax exempt?

Government Response: No, the federal government is, by law, exempt from paying state and local taxes.

However, this exemption does not apply to organizations with federal government contracts, which are designated as agents of the government.

Question #34: Are restrooms available for contractor use?

Question #35: Please confirm security requirements for all individuals to access the projects location.

Government Response: The specification language speaks for itself.

Question #36: Will a government escort be required during when work is being performed inside?

Government Response: The specification language speaks for itself.

Question #37: Project documents state “to perform asbestos abatement.... to demolish existing conductor.”

It looks like it is pointing to a disconnect switch box.

a. Is this note referring to asbestos transite insulative backing inside of the switch box?

b. Please verify if the switch boxes being removed contain asbestos, if so, do they need to be removed by a licensed abatement contractor? Or is it that the old boxes once removed by an electrician need to be disposed of properly by a licensed abatement contractor?

c. How many switch boxes or other panels are there that contain asbestos transite insulators?

d. Does the owner require any other abatement outside of the referenced switch box?

Government Response: The asbestos abatement note is a general note and is not pointing specifically to a disconnect switch box.

6 | P a g e

1. No.

2. Assume that all conductors touched will contain asbestos and will require abatement.

3. Assume all switch boxes will contain asbestos.

4. See answer to #2.

Question #38: Can I please look at the well and boring obstacles?

Government Response: Reclamation is unable to facilitate another pre-bid site visit. Earlier email inquiries stated your companies Superintendent physically walked the site? If so, Reclamation afforded everyone an opportunity to visit the well location and was encouraged to take as many photos and videos of all the exterior work locations to better ascertain project variables.

Question #39: Does the existing electrical pedestal near the microwave building and well head have anything to do with the scope of the job? Plans Page: …60508

Government Response: The pedestal is indicated on the plans to assist in spatial awareness of items near the well site as well as spatial location of the well site.

Question #40: Who will be responsible to put the electrical conduits in the boring pipe, and what size will the boring pipe be? Plans Page: …60509

Question #41: Will the pump vendor be supplying the special well casing junction boxes? Plans Page:

…60515

Question #42: Will the pump vendor be supplying the matching VFD for the pump, control panel, pressure transmitter, and the pressure transducer(s). Plans Page: …60515, 60516

Question #43: Has someone confirmed that the pump control box WVFD and the control box WPNL able to fit inside the concrete inset by the electrical equipment? Plans Page: …60516

Question #44: Will the pump vendor provide the pressure switch, hi pressure alarm, and control box?

Plans Page: …60513, Plans Page: …60524

7 | P a g e

Question #45: The feeder schedule has call out letters from A to AA. Where are those index numbers shown in the plans? Plans Page: …60516

Government Response: The contractor will have to use the “TO” and “FROM” columns in the conduit schedule to match up with the plan drawings.

Question #46: Is there a control wire/ connection and conduit intended but not shown to connect the pressure switch in the compressor room to the WVFD control box in the gallery? Plans Page: …60513

Question #47: How does the WPNL get it’s signal to turn the pump on and off. Where is the connection?

Plans Page: …60510

Question #48: Where does the bare ground wire get connected to, and can it be spliced? Plans Page:

…60520

Question #49: What kind of shut down procedure can we expect when we install the 100 amp breaker in panelboard PGS? Plans Page …60521

Question #50: What kind of shut down procedure can we anticipate when we shut down and replace the feeder PGT-PGAD? Plans Page …60521

Question #51: What is the procedure for pulling out the PGT-PGAD conductors with asbestos, and what route to get them up to the highway (through the Sta 2+63 exit door)? Plans Page …60521

8 | P a g e

Question #52: What kind of heat trace controls are required, and where are they on the plans? Plans Page …60524

Question #53: Can we use the exit door during construction at Sta 2+63? Plans Page …60509

Question #54: Transformer LGBN is a 10KVA size, and called out to be replaced “in kind” with new. At another place it is called out to be a 25KVA transformer. Is this a typo, or does the transformer increase in size? Plans Page …60516

Government Response: The load on panel LGAN is 21.5KVA, therefore, the transformer needs to be at least 25KVA, as shown by the one-line callout.

Question #55: It appears this bid is to be sent to Boise per Amendment 3 and not to Hungry Horse. Is this correct? Can this be sent via FedEx or email? When/where is the official bid opening?

Government Response: Block 8 of the SF 1442 “Address Offer To” Pg 12 of conformed Invitation for Bid package denotes where bid packages should be sent.

US BOR – Columbia-Pacific Northwest Office Attn: William Roberts (Contracting Officer) 1150 North Curtis Road, Suite 100 Boise, ID 83706

Pg 14 (continuation sheet) of conformed Invitation for Bid package advises what constitutes an acceptable Invitation for Bid package receipt.

As of this 7/22/2024 Amendment 0005 action; Sealed bid packages will be opened on Wednesday, 31 July 2024 @ 1400 MST (2:00 PM) at the Pacific Northwest Regional Office (PNRO) located at 1150 N. Curtis Road, Boise Idaho 83706 in the Hungry Horse Conference Rm 225 (2nd Floor).

File details come from the government source that posted it. Updated .