This document is an amendment (Amendment 0004) to a federal solicitation (Solicitation 140R1024B0001) for the Hungry Horse Potable Water Conveyance System project in Montana. The amendment provides the following key information:

  1. Partially completed responses to questions from the 5/29/2024 pre-bid site visit, with remaining questions to be addressed in a future amendment.
  2. Revisions to technical specifications for Vertical Turbine Pumps (Submersible) and associated drawings.
  3. Additional technical drawings for the project, including details for the civil, electrical, and water system components.
  4. An extension of the bid due date from 7/24/2024 to 7/31/2024.
  5. A requirement for the contractor to acknowledge all solicitation amendments in order for their bid to be considered responsive.

The solicitation is being issued by the Department of the Interior's Bureau of Reclamation for the Hungry Horse Project in Montana. Bids are due by 2:00 PM MST on 7/31/2024 and must be submitted to the specified address in Boise, Idaho.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140R1024B0001 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Boise ID 83706-1234 1150 N. Curtis Road, Ste. 100

R10

Acquisition Management Division Regional Office Pacific Northwest Region Bureau of Reclamation

07/18/20240004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/13/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment #4 (0004) is to provide the following information:

1. Provide a partially completed list of government responses to questions stemming from 5/29/2024 pre-bid site visit. (8 pages) Note: Remaining questions 45 & 54 will be fully addressed upon future amendment issuance.

2. Provide the following technical specification revisions (5 pages):

-- Signature Sheet / Certification of Technical Specifications -- 43 24 26, Revised

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 20

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R1024B0001/0004 drawings: 60507, 60511, 60512, 60513 & added drawing 60546

-- Vertical Turbine Pumps

(Submersible)-(Revised) 43 24 26 - 4

-- Vertical Turbine Pumps

(Submersible)-(Revised) 43 24 26 - 4A

-- Vertical Turbine Pumps

(Submersible)-(Revised) 43 24 26 - 13

-- Vertical Turbine Pumps

(Submersible)-(Revised) 43 24 26 - 13A

3. Provide the following technical drawings (5 pages):

-- General Cover Sheet and Sheet Index -

Location, Map, Vicinity Map, and Aerial Photo

447-100-60507 - Sheet 1

-- Civil Inspection Gallery (2 of 2) Plan View and Details

447-100-60511 - Sheet 5

-- Civil Block 19 Elevator Tower Elevation

View and Details

447-100-60512 - Sheet 6

-- Civil Power Plant Adit and Floors 3 and 4

Plan View and Details

447-100-60513 - Sheet 7

-- Civil Details Guardrail and Wall/Floor

Penetration Details

447-100-60546 - Sheet 10

4. This bid opportunity is being EXTENDED:

-- FROM: Wed, 7/24/2024 at 2:00 PM MST.

-- TO: Wed, 7/31/2024 at 2:00 PM MST.

5. ALL SOLICITATION AMENDMENT(S) SHALL BE

ACKNOWLEDGED BY THE CONTRACTOR FOR THEIR

RESPECTIVE BID TO BE CONSIDERED RESPONSIVE.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Questions & Answers: 140R1024B0001-0004 (7-18-2024) Hungry Horse Potable Water Conveyance System

1 | P a g e

Question #1: I have a question about spec section 432426. We are not having any luck w/ our VT pump manufacturer's being able to hit that duty point of 33 gpm @ 712' TDH. I'm curious if a well pump is more inline with what you're needing?

Government Response: The pump required is as listed in the Specifications and Drawings.

Question #2: I did not attend the site visit. I sent our superintendent instead. I assumed he would get pictures but pictures weren't allowed. Are you able to send me pictures? Any way I can get a site visit?

Government Response: All relevant pictures are available in the drawing specs. During the initial briefing when the safety briefing was being accomplished the facility manager advised to do security protocols no internal photos and or videos could be captured of the facility. All relevant photos for the projects are on the drawings. Unfortunately coordinating another site visit is not possible…many BOR personnel traveled in from out of state towards accomplishing yesterday’s event.

Specific additional photos may be requested by those who attended the site visit as discussed on site. Requests need to be very specific to ensure the correct photos are taken.

Question #3: RFI Per L.26; Offerers are to submit proposals on forms furnished (SF 1442 and continuation sheet) by the government. Questions: Is there a list of other attachments to include or are attachments needed? I would assume at least the bid bond needs to be attached.

Government Response: The specification language speaks for itself.

Question #4: RFI Spec section 01 31 30, states that the Contractor is to provide a "Contract Document

Management System" for both the contractor and the government to use. Question: Is this applicable for this project? If this is applicable for this project, is there software the government prefers? There are a lot of different projects out there.

Government Response: Any program that meets the Specifications.

Question #5: RFI Question: Are there on site staffing requirements? On a project this size, I would assume the superintendent could be both the Safety Officer and primary supervisor.

Government Response: This is possible assuming all qualifications of both positions are met.

Question #6: Is access to well only allowed by crossing the concrete access bridge on the left abutment?

Government Response: The BPA Bridge is the only access available to the well site. There is no downstream access point.

2 | P a g e

Question #7: What is the weight limit on the bridge and dimensions?

Government Response: Bridge load design is HS 20-44. See Specifications for notes on loads over this crossing the bridge. The bridge is approximately 55-feet long, and 14-feet wide (outside edge to outside edge)

Question #8: Can you provide the bridge analysis?

Government Response: Bridge load design is HS 20-44. See Specifications for notes on loads over this crossing the bridge.

Question #9: Is there a Geotech available for the HDD boring alignment or well installed to date?

Government Response: Drilling reports from construction of the well are attached.

Question #10: Will there be any issues with the HDD alignment running underneath the existing communication building and equipment on the left abutment?

Government Response: The Specification Package speaks for itself.

Question #11: Is it expected for a new concrete landing to be installed outside of adit with new handrail?

Government Response: Damage to concrete or sections removed shall be replaced to match existing.

Question #12: How is new handrail to connect to existing handrail, and do you have specifications on the handrail?

Government Response: Sections removed shall be reinstalled or replaced to match existing.

Question #13: There was an electrical ped noticed along the side of the access road to the well. Are there asbuilts as to where that runs, and if it will interfere with well modifications and HDD operations?

Government Response: What looks like an electrical pedestal is a seismic monitoring device. There is a buried conduit that runs up the of the road towards the plant. PER the FAR and Specifications all existing utilities are to be protected.

Question #14: Grates in the elevator chase, are those to be cut or replaced when installing the new water line conduit? If cut, will each need to be removed and modified with guarding and then reinstalled? Or is it intended to modify while in-place?

3 | P a g e

Government Response: The specification and drawings speak for itself.

Question #15: Plansheet 447-100-60509 shows all three conduits (2” PW, 1” DC, and 2” AC going through adit door together in one profile, but plansheet 447-100-60510, detail A & B show them separated. Can you provide better detail how you want this transition?

Government Response: Work to be completed as seen on sheet 447-100-60510 Details A and B

Question #16: Plansheet 447-100-605012, will there be any guarding around the Block 14 hydropneumatic tank detail as the location is outside of the elevator door?

Government Response: There will be a guardrail around the tank. See new sheet 477-100-60516 attached*

Question #17: Will contractor need to be escorted at all times?

Government Response: No.

Question #18: Will special security clearance need to be required for all workers onsite (General contractor, subcontractors, and vendors coming to site) before work can commence

Question #19: What level of security clearance and where can that be obtained?

Question #20: Is an external job-trailer required and will amenities need to be provided for the BOR and

EOR?

Question #21: Will the contractor be allowed a staging and workspace within the powerplant?

Government Response: Staging areas are shown on plan sheets.

Question #22: Has lead time been taken into account for specialty electrical components that need to be ordered?

Government Response: Contract assumes standard lead times.

Question #23: Additional Photos Requested ◼ Penetration inside/outside of Adit for existing conduit and where new conduit is required to go.

◼ Grates in elevator chase block 19

◼ Connection point of new water line to vertical pipe chase existing water line in block 14.

4 | P a g e

◼ Photo of power plant adit and where the line water line is to run (floor pipe chase)?

◼ Photos of room 309 and 409 where new waterline is to run?

Government Response: See Attachment

Question #24: Will the BOR entertain the request to postpone the bid date to 6/26?

Government Response: Reference amendment actions posted on Governmentwide Point of Entry

SAM.gov.

Question #25: Will potential workers have to commute to Browning for background checks/paperwork?

Question #26: Can the elevator(s) be utilized by contractors to move personnel and materials? Any restrictions that may apply? Assumed Block 14 elevator will only be utilized?

Government Response: Elevators have a load capacity rating that cannot be exceeded and require key card access for use.

Question #27: Will the contractor have to be escorted at all times by a member of the dam’s staff?

Question #28: Does the site have any additional entrances (east side?) to the inspection gallery to allow access for materials up to 20 feet in length?

Government Response: If this question is asking if there are any openings on the east side of the dam (i.e.

the forebay side when looking at a map for east), then no, there are not. There are four accesses to the roadway gallery: one at each end that is security controlled and must be locked when not in use and daily, and an entrance within each elevator tower to the roadway. Best options for material entry to roadway are the towers but would have to be lowered to that floor via stairwell (elevators can't handle 20 foot sections by my estimation).

Question #29: Any particular detail for concrete core drill penetrations? Link Seal? Grout?

Government Response: See Specifications and new plan sheet 447-100-60516 attached *

Question #30: Vertical pipe chase: Will new penetrations require any sort of guarding/protection from sharp edges? Will the expanded metal need to be removed for adding the new penetrations to avoid falling objects/hot work slag going down the vertical shaft?

5 | P a g e

Question #31: Does the existing facility have any prior anchoring provisions/requirements for work within the vertical shaft access points at each level?

Government Response: All new anchor points for personnel protection must be inspected and approved by a PE unless they are pre-engineered anchors such as the HILTI swivel anchors that have manufacturer installation requirements and usage requirements that MUST be followed.

Question #32: Has a laydown/stored material area been identified at the site? Location?

Question #33: Is this project tax exempt?

Government Response: No, the federal government is, by law, exempt from paying state and local taxes.

However, this exemption does not apply to organizations with federal government contracts, which are designated as agents of the government.

Question #34: Are restrooms available for contractor use?

Question #35: Please confirm security requirements for all individuals to access the projects location.

Question #36: Will a government escort be required during when work is being performed inside?

Question #37: Project documents state “to perform asbestos abatement.... to demolish existing conductor.”

It looks like it is pointing to a disconnect switch box.

a. Is this note referring to asbestos transite insulative backing inside of the switch box?

b. Please verify if the switch boxes being removed contain asbestos, if so, do they need to be removed by a licensed abatement contractor? Or is it that the old boxes once removed by an electrician need to be disposed of properly by a licensed abatement contractor?

c. How many switch boxes or other panels are there that contain asbestos transite insulators?

d. Does the owner require any other abatement outside of the referenced switch box?

6 | P a g e

Government Response: The asbestos abatement note is a general note and is not pointing specifically to a disconnect switch box.

1. No.

2. Assume that all conductors touched will contain asbestos and will require abatement.

3. Assume all switch boxes will contain asbestos.

4. See answer to #2.

Question #38: Can I please look at the well and boring obstacles?

Government Response: Reclamation is unable to facilitate another pre-bid site visit. Earlier email inquiries stated your companies Superintendent physically walked the site? If so, Reclamation afforded everyone an opportunity to visit the well location and was encouraged to take as many photos and videos of all the exterior work locations to better ascertain project variables.

Question #39: Does the existing electrical pedestal near the microwave building and well head have anything to do with the scope of the job? Plans Page: …60508

Government Response: The pedestal is indicated on the plans to assist in spatial awareness of items near the well site as well as spatial location of the well site.

Question #40: Who will be responsible to put the electrical conduits in the boring pipe, and what size will the boring pipe be? Plans Page: …60509

Question #41: Will the pump vendor be supplying the special well casing junction boxes? Plans Page:

…60515

Question #42: Will the pump vendor be supplying the matching VFD for the pump, control panel, pressure transmitter, and the pressure transducer(s). Plans Page: …60515, 60516

Question #43: Has someone confirmed that the pump control box WVFD and the control box WPNL able to fit inside the concrete inset by the electrical equipment? Plans Page: …60516

7 | P a g e

Question #44: Will the pump vendor provide the pressure switch, hi pressure alarm, and control box?

Plans Page: …60513, Plans Page: …60524

Question #45: ….

Government Response: Question will be fully addressed upon future amendment issuance.

Question #46: Is there a control wire/ connection and conduit intended but not shown to connect the pressure switch in the compressor room to the WVFD control box in the gallery? Plans Page: …60513

Question #47: How does the WPNL get it’s signal to turn the pump on and off. Where is the connection?

Plans Page: …60510

Question #48: Where does the bare ground wire get connected to, and can it be spliced? Plans Page:

…60520

Question #49: What kind of shut down procedure can we expect when we install the 100 amp breaker in panelboard PGS? Plans Page …60521

Question #50: What kind of shut down procedure can we anticipate when we shut down and replace the feeder PGT-PGAD? Plans Page …60521

Question #51: What is the procedure for pulling out the PGT-PGAD conductors with asbestos, and what route to get them up to the highway (through the Sta 2+63 exit door)? Plans Page …60521

8 | P a g e

Question #52: What kind of heat trace controls are required, and where are they on the plans? Plans

Page …60524

Question #53: Can we use the exit door during construction at Sta 2+63? Plans Page …60509

Question #54: …..

Government Response: Question will be fully addressed upon future amendment issuance.

Question #55: It appears this bid is to be sent to Boise per Amendment 3 and not to Hungry Horse. Is this correct? Can this be sent via FedEx or email? When/where is the official bid opening?

Government Response: Block 8 of the SF 1442 “Address Offer To” Pg 12 of conformed Invitation for Bid package denotes where bid packages should be sent.

◼ US BOR – Columbia-Pacific Northwest Office

Attn: William Roberts (Contracting Officer)

1150 North Curtis Road, Suite 100

Boise, ID 83706

Pg 14 (continuation sheet) of conformed Invitation for Bid package advises what constitutes an acceptable

Invitation for Bid package receipt.

As of this 7/18/2024 Amendment 0004 action; Sealed bid packages will be opened on Wednesday, 31 July

2024 @ 1400 MST (2:00 PM) at the Pacific Northwest Regional Office (PNRO) located at 1150 N. Curtis

Road, Boise Idaho 83706 in the Hungry Horse Conference Rm 225 (2nd Floor).

Signature Sheet / Certification of Technical Specifications

Project Title: HHFO Domestic Water Conveyance System

Hungry Horse Project, Montana

Region: Columbia-Pacific Northwest

Prepared by: (HDR) Date: 2/24/2023

Prepared by: (HDR) Date: 2/24/2023

Technical Approval: (HDR) Date: 2/24/2023

1. The person signing the Specifications package as “Prepared by” shall have developed or assembled the written Specifications.

2. The person signing the Specifications package for “Technical Approval” shall have been in responsible charge of the overall design including developing or assembling the Specifications. This person will typically be the design team leader. In cases where the designs described by the Specifications meet the criteria for preparation by a registered engineer or architect, this person shall be registered with the applicable professional designation after their signature, such as P.E. for professional engineer or R.A. for registered architect. By this signature, this person is certifying the written Specifications convey the design intent as portrayed on the Drawings included therein. For Specifications package containing designs from multiple disciplines, it is the signing individual’s responsibility to ensure (using procedures defined by his/her organization) that the technical information prepared by other professions and disciplines and depicted in the document is compatible with the overall design intent and that the documents used to depict that information (e.g., drawings) include signatures with appropriate professional registration designations.

AMD/MOD

No.

Technical Approval Signature:

Prepared By Signature:

Revised Sections:

Amd 0004 43 24 26, Revised drawings: -60507, -60511, -60512, -60513 & added drawing -60546.

STACEY

CARLSON

Digitally signed by

STACEY CARLSON

Date: 2024.07.08 15:58:54 -06'00'7/13/2024

Hungry Horse Dam Potable Water Conveyance System Hungry Horse Project, Montana Amendment No. 0004

Vertical Turbine Pumps (Submersible)-(Revised) 43 24 26 - 4

B. RSN 43 24 26-1, Shop Drawings:

1. See Section 01 33 00.

2. Product technical data including:

a. Acknowledgement that products submitted meet requirements of standards referenced.

b. Manufacturer's installation instructions.

3. Operation and Maintenance Manuals:

a. See Section 01 78 30.

C. RSN 43 24 26-2, Proposal:

1. Data sheet completely filled in.

2. Performance curve showing accepted performance at design point. Curve will show head, capacity, efficiency, and horsepower based on bowl performance and shall cover the complete operational range of the pump from zero capacity to the maximum capacity.

3. Drawings of the proposed equipment giving general dimensions sufficient to determine how the equipment is to be supported and if it will fit within the space available.

4. Any additional information such as descriptive literature, manufacturer’s specifications, and other data to demonstrate compliance with these specifications.

D. RSN 43 24 26-1, Informational Submittals:

1. Certifications:

a. Provide a written statement that manufacturer's equipment has been installed properly, started up and is ready for operation by Owner's personnel.

2. Well performance test results:

a. Keep accurate records of the pumping tests and furnish copies of all records upon completion of the tests.

b. Include the date of the test, the clock time and elapsed pumping time of each measurement, the depth to water below the measuring point, the pumping rate at the time of measurement, and any pertinent comments on conditions that may affect the measurements.

c. Provide description of methods and results of development of well.

d. Provide copies of the results of the well performance tests as described in these specifications.

Vertical Turbine Pumps (Submersible)-(Revised) 43 24 26 - 4A

e. Reduce data from the test pumping and recovery period by computation and plot to determine the degree of development, efficiency, and coefficient of transmissibility of the well.

1) Raw data and computed data are to be prepared in tabular form and provided in digital ASCII format.

2) Graphical plots of time-drawdown and time-recovery shall be made on three-cycle semi-log charts.

3) Describe methods used in computations and show example calculations.

f. Provide results of the chemical water analysis.

g. Include in this report recommendations for size and depth settin of pump, allowable daily pumping, long-term production capacity, and long-term drawdowns.

h. Furnish report signed and sealed by a Professional Engineer registered in the State of Montana.

1) Submit copy to Engineer.

PART 2 PRODUCTS

2.01 ACCESSORIES

A. See Section 3 21 00.

2.02 MATERIALS

COMPONENT CYLINDRICAL SHAFT

Discharge Head AISI 303 SS

Vertical Turbine Pumps (Submersible)-(Revised) 43 24 26 - 13

a. Static Water Level.

b. Pumping Water Level.

c. GPM at the Design Surface Pressure.

d. Sand Content at Design Flow.

e. Surface Pressure at Design Flow .

f. Three Phase Running Amps.

g. Running Volts, All Phases.

h. "Off volts" all phases.

i. Water Temperature.

j. Evidence of gases in pumped discharge.

k. Shut off pressure, if possible.

l. Evidence of vibration or noise down hole.

m. Line-to-Line ohms.

n. Line-to-ground meg ohms.

B. Well Disinfection:

1. After well is completed, disinfect well and pump with chlorine solution.

a. Thoroughly clean well of all foreign substances, oil, grease, joint dope, and scum, including tools, timbers, rope, debris, cement, prior to disinfection.

b. Utilize chemical cleaners if necessary.

2. Disinfect well in accordance with AWWA A100 and State of Montana, Department of Environmental Quality requirements.

3. Furnish chlorine solution for disinfecting the well of such volume and strength that a minimum residual concentration of 50 PPM of chlorine is obtained in all parts of the well for a minimum contact period of 2 hours.

C. Water Quality Analysis:

1. Before disinfecting the well, obtain water samples for chemical analysis and submit to certified laboratory meeting the State of Montana, Department of Environmental Quality requirements.

2. After disinfecting and flushing well, obtain a water sample of bacterial testing and submit to certified laboratory meeting the State of Montana, Department of Environmental Quality requirements.

3. Furnish sample containers and sampling methods conforming to AWWA and Department of Quality guidelines.

Vertical Turbine Pumps (Submersible)-(Revised) 43 24 26 - 13A

4. Do not put well into service until three (3) consecutive passing reports are received.

5. If samples do not meet Department of Quality requirements, or coliform organisms are present, redisinfect well until an acceptable test report is obtained.

END OF SECTION

KALISPELL

WHITEFISH

POLSON

MISSOULA

LOLO

HAMILTON

BOZEMAN

HELENA

BUTTE

GREAT FALLS

DEER

LODGE

MILES CITY

GLENDIVE

BILLINGS

HAVRE

HARDIN

LEWISTOWN

Hungry Horse Dam Domestic Drinking Water Well

100% Design - Water Conveyance System HDR Project No.

Hungry Horse, MT 10217971

Date: February 24, 2023

I N D E X O F D R A W I N G S

GENERAL

1. 447-100-60507 - COVER SHEET AND SHEET INDEX - LOCATION MAP, VICINITY MAP,

AND AERIAL PHOTO

CIVIL

2. 447-100-60508 - OVERALL - PLAN AND PROFILE

3. 447-100-60509 - HORIZONTAL DIRECTIONAL DRILLING - PLAN AND PROFILE,

ISOMETRIC VIEW, AND DETAILS

4. 447-100-60510 - INSPECTION GALLERY (1 OF 2) - PLAN VIEW AND DETAILS

5. 447-100-60511 - INSPECTION GALLERY (2 OF 2) - PLAN VIEW AND DETAILS

6. 447-100-60512 - BLOCK 19 - ELEVATOR TOWER ELEVATION VIEW AND DETAILS

7. 447-100-60513 - POWER PLANT ADIT AND FLOORS 3 AND 4 - PLAN VIEW AND

DETAILS

8. 447-100-60514 - WATER SYSTEM - ISOMETRIC VIEW

CIVIL DETAILS

9. 447-100-60515 - DOMESTIC WELL - DETAILS

10. 447-100-60546 - GUARDRAIL AND WALL/FLOOR PENETRATION - DETAILS

ELECTRICAL

11. 447-100-60516 - POWER DISTRIBUTION - PARTIAL SINGLE LINE DIAGRAM

12. 447-100-60517 - BLOCK 14 EL 3550.00 - INSPECTION GALLERY PLAN VIEW,

ELEVATION VIEW, AND DETAILS

13. 447-100-60518 - BLOCK 2 TO BLOCK 13 EL 3550.00 - INSPECTION GALLERY PLAN

VIEW AND ELEVATION VIEW

14. 447-100-60519 - BLOCK 2 EL 3550.00 - EMBEDDED CONDUIT RECESS DETAILS

15. 447-100-60520 - INSPECTION GALLERY EL 3550.00 - MISC. EXPOSED CONDUIT AND

EQUIPMENT DETAILS

16. 447-100-60521 - PANELBOARD PGS - 460-VOLT POWER WIRING DIAGRAM

17. 447-100-60522 - PANELBOARD PGW - 460-VOLT POWER WIRING DIAGRAM

18. 447-100-60523 - LIGHTING PANELBOARD - LGAN DETAILS

19. 447-100-60524 - PIPE HEAT TRACING AND HIGH PRESSURE ALARM DETAILS

20. 447-100-60525 - TYPICAL GROUNDING DETAILS

21. 447-100-60526 - 120/240 V CONVENIENCE CIRCUIT TERMINAL BOX TYPE G

22. 447-100-60527 - STANDARD NAMEPLATES

23. 447-100-60528 - IDENTIFICATION, WARNING AND SAFETY SIGNS

SITE LOCATION A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

3.

1S

LM

S T

EC

H

C A D

F

IL

EN

A M

E G

1.

D W

G

LA

S T

S A V

ED

D A

TE

-0 6-

LA

S T

S A V

ED

B Y

JO

EW

R

IG

H T

H U

N G

R Y

H O

R S E

PR

O

JE

C T

H U

N G

R Y

H O

R S E

D A M

PO

TA

B

LE

W A

TE

R C

O N

V

EY

A N

C E

S

YS

TE

M

GENERAL

COVER SHEET AND

SHEET INDEX

LOCATION MAP,

VICINITY MAP, AND

AERIAL PHOTO

BOISE, ID

447-100-60507

2023-01-06

DRAWN

ACCEPTED

CONTRACTOR

Grady Beck, PEVICINITY MAP

HUNGRY HORSE DAM

HUNGRY HORSE

RESERVOIR

WATER SUPPLY

WELL LOCATION

EXISTING BPA

BRIDGE LOCATION

SOUTH FORK OF

FLATHEAD RIVER

NF-895

AERIAL PHOTOGRAPH

LOCATION MAP

Site Summary T30N, R19W, S22 & 27

Flathead County Hungry Horse, MT

NOT TO SCALE

NOT TO SCALE

NOT TO SCALE

-0 7-

A dd ed s he et

-1

-6

D ig ita lly s ig ne d by

G R

AD

Y

BE

C

K D at e:

4.

.0

:5

2:

-0 6'

Amendment No 0004

Block 10

Block 11

Block 12

Block 13 Block 14 Block 15 Block 16

Block 17

Block 18

Block 19

Block 20Block 14 Elevator Tower

Block 19

Elevator Tower

447-100-60510

447-100-60510

5' X 7' Inspection

G allery

2"-PW to be installed along gallery wall.

Pipe material per specifications.

See Photo Detail D, sheet

Contractor to install pipe supports per specifications and Detail 1, sheet

Contractor to install expansion/contraction joints at each dam contraction joint per specifications.

16+20

9+00

10+00

11+00

12+00 13+00 14+00

15+00

16+002"-PW

End of water line.

Cap line for possible future service.

M

AT

CH

L

IN

E

AT

S

TA

TI

O N

.0

PR

EV

IO

U S

SH

EE

T N

U M

BE

R:

-1

-6

W

W

W W

W

W W

Block 14 Block 15

W

W

W

W

W W

W

W

W W

W

Block 19

WW

WW

0 60'30'

BLOCK 14 ELEVATOR TOWER DETAIL

1" = 10'

BLOCK 19 ELEVATOR TOWER DETAIL

1" = 10'

X Y

BLOCK 14 WATER SERVICE

NOT TO SCALE

BLOCK 19 WATER SERVICE

NOT TO SCALE

HT

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

3.

1S

LM

S T

EC

H

C A D

F

IL

EN

A M

E C

4.

D

W G

LA

S T

S A V

ED

D A

TE

-0 6-

LA

S T

S A V

ED

B Y

JO

EW

R

IG

H T

H U

N G

R Y

H O

R S E

PR

O

JE

C T

H U

N G

R Y

H O

R S E

D A M

PO

TA

B

LE

W A

TE

R C

O N

V

EY

A N

C E

S

YS

TE

M

CIVIL

INSPECTION GALLERY

(2 OF 2)

PLAN VIEW AND

DETAILS

BOISE, ID

447-100-60511

2023-01-06

DRAWN

ACCEPTED

CONTRACTOR

Grady Beck, PE

BLOCK 19 WATER LINE ROUTING

NOT TO SCALE

PHOTO DETAIL A

A 6'

Install two (2) 2" 90° elbows and 2"-PW lines to provide water to Block 14 services

Contractor shall perform penetration through concrete, per specifications and detail 3, sheet 447-100-60546

Install 2" tee and 2"-PW to provide water to Block 19 services

Cap line for possible future sevices

5' X 7' Inspection Gallery

Install 2" tee and 2"-PW to provide water to Block 19 services

Install two (2) 2" 90° elbows and 2"-PW lines to provide water to Block 14 services

2"-PWTwo (2) 2"-PW Hydropneumatic tank, see Detail 2, sheet 447-100-60512

Block 14 Elevator Tower

Block 19 Elevator Tower

5' X 7' Inspection Gallery

5' X 7' Inspection Gallery 5' X 7' Inspection

Gallery

For continuation to power plant adit, see sheet 447-100-60512

EL. 3550.00 EL. 3550.00

2"-PW

Approx. 6" wall penetration

Approx. 6" wall penetration

Pipe supports (Typ), install per specifications

Penetrate wall & run water line down vertically in vertical pipe chase to power plant adit, EL. 3113.50

Vertical pipe chase

Install 90° bend and run water line down vertically in vertical pipe chase to power plant adit

Hydropneumatic tank, See Detail 2, sheet 447-100-60512

Vertical pipe chase

Elevator shaft

Contractor shall perform penetration through concrete, per specifications and detail 3, sheet 447-100-60546

For continuation, see Photo Detail A, this sheet

Contractor shall perform penetration through concrete, per specifications and detail 3, sheet 447-100-60546

Double door

Contractor shall perform penetration through concrete, per specifications and detail 3, sheet 447-100-60546

Double door

PLAN VIEW - STA 9+50 TO STA 16+20

1" = 30'

Connect new water line to existing water service line in pipe chase

Vertical pipe chase

Elevator shaft

Connect new water line to existing water service line in pipe chase

3/4"-PW

3/4"-PW

6'

Door Door

Note:

Piping configuration similar in Block 14

Not connected

Guardrail, see detail 1, sheet 447-100-60546

-0 7-

A dd ed g ua rd ra il an d pe ne tr at io n de ta il ca llo ut

D ig ita lly s ig ne d by G

R

AD

Y

BE

C K

D at e:

4.

.0

:5 3:

-0

6'

W

W

W W

W W

W W

W W W W W

Construction Notes:

1. Contractor to install pipe supports per specifications.

2. Contractor to provide adequate fall protection and barriers around horizontal pipe chase when floor panels are displaced.

Install 90° bend and run water line down in elevator tower vertical pipe chase to power plant adit, EL. 3113.50

BLOCK 19 ELEVATOR TOWER (As-Built Sheet: 447-D-161)

NOT TO SCALE

Install 90° bend.

Run water line horizontally through power plant adit horizontal pipe chase.

2"-PW

Pipe material per specifications.

For continuation through power plant adit, see sheet 447-100-60513

447-100-60511

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

3.

1S

LM

S T

EC

H

C A D

F

IL

EN

A M

E C

5.

D

W G

LA

S T

S A V

ED

D A

TE

-0 6-

LA

S T

S A V

ED

B Y

JO

EW

R

IG

H T

H U

N G

R Y

H O

R S E

PR

O

JE

C T

H U

N G

R Y

H O

R S E

D A M

PO

TA

B

LE

W A

TE

R C

O N

V

EY

A N

C E

S

YS

TE

M

CIVIL

BLOCK 19

ELEVATOR TOWER

ELEVATION VIEW AND

DETAILS

BOISE, ID

447-100-60512

2023-01-06

DRAWN

ACCEPTED

CONTRACTOR

Grady Beck, PE

Pressure Reducing Valve No. 1, El. 3240.00

VERTICAL PIPE CHASE

NOT TO SCALE

PHOTO DETAIL A

VERTICAL PIPE CHASE

NOT TO SCALE

PHOTO DETAIL B

A

B

2"-PW

Pipe supports per specifications

2"-PW

Pipe supports per specifications

BLOCK 14 HYDROPNEUMATIC TANK DETAIL

NOT TO SCALE

Hydropneumatic Tank

1. Isolation Valve

2. Hose Bib

3. Pressure Indicator and Transmitter (See Detail 3, this sheet)

4. Pressure Relief Valve - Route discharge to an appropriate drain

5. Union

6. Bolt tank to floor per manufacturer's specifications.

KEY:

30"Ø

7' F ro m

F lo or

Pressure Transmitter

PE/PIT-01

(Per Specification)

Pressure Indicator (Per Specification)

1/2" Ball Valve (Per Specification)

1/2" Tee

1/2" Elbow (Typ)

1/2" Pipe Nipple (Typ)

PRESSURE INDICATOR AND TRANSMITTER ASSEMBLY

NOT TO SCALE

Provide 2" isolation gate valve

Provide PRV that is fully redundant to PRV 1.

Provide 2" isolation gate valve

-0 7-

C ha ng ed p ip e ro ut in g ar ou nd t he p re ss ur e ta nk D ig ita lly s ig ne d by

G R

AD

Y

BE

C

K D at e:

4.

.0

:5

6:

-0 6'

W W

W W W W W W W W W W W W W W W W

W

W W W

W

W W

EW

Penetration into 3rd floor, Room 305 from power plant adit, see detail 4, sheet 447-100-60546

Existing penetration into 3rd floor, Room 305.

See Photo Detail A, this sheet and 3rd Floor - Plan View, this sheet for continuation.

Existing eye wash station

Penetration up through ceiling from Room 309 into Room 409-A.

See 4th Floor - Plan View, this sheet for continuation, see detail 4, sheet 447-100-60546

2"-PW

Pipe material per specifications

For continuation from Block 19 elevator tower, see sheet 447-100-60512

POWER PLANT ADIT PLAN VIEW (As-Built Sheet: 447-D-1129)

NOT TO SCALE

Penetration up through floor into Room 409-A from Room 309, see detail 4, sheet 447-100-60546

Tie into existing copper piping that routes to UV, Room 406

3RD FLOOR - PLAN VIEW (As-Built Sheet: 447-D-1352)

NOT TO SCALE

4TH FLOOR - PLAN VIEW (As-Built Sheet: 447-D-1352)

NOT TO SCALE

2"-PW

Pipe material per specifications

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

3.

1S

LM

S T

EC

H

C A D

F

IL

EN

A M

E C

6.

D

W G

LA

S T

S A V

ED

D A

TE

-0 6-

LA

S T

S A V

ED

B Y

JO

EW

R

IG

H T

H U

N G

R Y

H O

R S E

PR

O

JE

C T

H U

N G

R Y

H O

R S E

D A M

PO

TA

B

LE

W A

TE

R C

O N

V

EY

A N

C E

S

YS

TE

M

CIVIL

POWER PLANT ADIT AND

FLOORS 3 AND 4

PLAN VIEW AND

DETAILS

BOISE, ID

447-100-60513

2023-01-06

DRAWN

ACCEPTED

CONTRACTOR

Grady Beck, PE

EXISTING PENETRATION

NOT TO SCALE

PHOTO DETAIL A

A

PRV No. 2

General Note:

1. Pipe chase is approximately 6 feet deep. When Removable Concrete Covers are removed, proper OSHA safety precautions and fall protection are required.

Existing penetration into 3rd floor, Room 305.

2"-PW

Provide pressure switch and high pressure alarm, see

High Pressure Alarm System detail on Sheet

447-100-60524

PS

-0 7-

A dd ed p en et ra tio n de ta il ca llo ut D ig ita lly s ig ne d by

G R

AD

Y

BE

C

K D at e:

4.

.0

:5

7:

-0 6'

Top of floor

Modular mechanical seal.

Joint shall be watertight.

Passing pipe

Standard weight steel pipe sleeve.

Hot dip galvanize after fabrication

2" Min

2"

Fill space between link seals with polyurethane, immersible, single component, chemical curing caulk

New pipe

Core drill hole pipe OD to size required by seal MFR.

Clean prior to installing modular mechanical seal.

Concrete wall

Modular mechanical seal or equal (Typ of 2)

Wall thickness as noted on plans

3' -6

Concrete structure

Base plate, see detail this sheet

Guardrail 1 1/4" Typical

Edge of concrete

6" Hole for 5/8"Ø fasteners

BASE PLATE FOR

MOUNTING TO CONCRETE

REMOVABLE GUARDRAIL

VERTICAL POST

(Typ bar to plate only)

Base plate

Set screw

8" long solid rod

Guardrail vertical post1

1/ 2"

5"

1/

4"

EQ

EQ

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

3.

1S

LM

S T

EC

H

C A D

F

IL

EN

A M

E D

2.

D W

G

LA

S T

S A V

ED

D A

TE

-0 6-

LA

S T

S A V

ED

B Y

JO

EW

R

IG

H T

H U

N G

R Y

H O

R S E

PR

O

JE

C T

H U

N G

R Y

H O

R S E

D A M

PO

TA

B

LE

W A

TE

R C

O N

V

EY

A N

C E

S

YS

TE

M

CIVIL DETAILS

GUARDRAIL AND

WALL/FLOOR

PENETRATION

DETAILS

BOISE, ID

447-100-60546

2023-01-06

DRAWN

ACCEPTED

CONTRACTOR

2024-07-10

FLOOR PENETRATION DETAIL

NOT TO SCALE

WALL PENETRATION DETAIL

NOT TO SCALE

GUARDRAIL TOP MOUNTED CONCRETE

NOT TO SCALE

GUARDRAIL BASE PLATE

NOT TO SCALE

Digitally signed by GRADY BECK Date: 2024.07.08 12:58:45 -06'00'

File details come from the government source that posted it. Updated .