This document is an amendment to a federal solicitation providing additional information regarding coating systems for carbon steel strainers and extending the quote due date to April 29, 2022. The solicitation is for plug valves and strainers with a minimum pressure rating of 175 PSIG to isolate strainers for maintenance at the Grand Coulee Dam Right Powerhouse. The strainers will strain raw river water routed into the generator cooling water system. Carbon steel strainers are required to have a coating system on both the inside and outside providing a minimum 30-year service life against corrosion from raw river water. Acceptable coating systems include those meeting AWWA C550 standards with a gray color. Documentation of coating specifications must demonstrate compliance with the 30-year service life requirement. The amendment responds to questions by clarifying coating life expectancy is 30 years and materials must be new. The amendment does not change any other requirements in the original solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140R1022Q0005 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Boise ID 83706-1234 1150 N. Curtis Road, Ste. 100

R10

Acquisition Management Division Regional Office Pacific Northwest Region Bureau of Reclamation

02/16/20220004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/16/2022

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of amendment 00004 is to provide additional information regarding the coating system for carbon steel strainers and extend the date quotes are due to 04/29/2022 3:00 PM

Mountain Time. Requirements for the valves remain unchanged (see specifications).

1. Carbon steel strainers with a coating system that provides a minimum 30-year service life against corrosion from raw river water. Is that on the inside, outside or both?

Response: The entire body would need a coating system, both inside and outside.

2. Documentation required?

Response: For documentation, if quoting carbon steel strainers, please provide specifications for coatings used. The specifications should substantiate compliance with

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Scott Cooper

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R1022Q0005/0004 the requirement. Coating system shall be as per

AWWA C550; Color: Grey

3. Addition coating information for carbon steel strainers?

Response:

Coating Specifications: Coating system shall be as per AWWA C550; Color: Grey

Description of the work: These valves serve to isolate strainers as required for maintenance.

The strainers serve to strain raw river water to be routed into the generator cooling water system.

Expected life of coatings: 30 years.

New or rebuild/reworked materials: New.

Construction: Carbon steel.

Indoors or outdoors, (sunlight) or both exposure:

Indoors.

Humidity: The humidity in the power plant where these valves will be located averages 50%.

Temperature: water temp through the units averages 6ºC (43ºF).

Chemical exposure: No. Columbia River water (near potable quality).

4. Your latest amendment states that all plug valves and strainers to be minimum 175 maximum psi?

Response: That has not changed. Per the solicitation, all valves and strainers in all sizes must have a minimum pressure rating of 175

PSIG. There is no restriction on how robust a component can be above minimum requirements.