140R1021B0015_Solicitation.pdf

PDF 12 MB Posted

Attached to
140R1021B0015 Leavenworth NFH SWISP Phase II
Solicitation number
140R1021B0015
Issued by

About this file

This solicitation is for Phase II of the Leavenworth National Fish Hatchery Surface Water Intake Fish Screens and Fish Passage Pipe Rehabilitation project for the Columbia Basin Project in Washington state. The Bureau of Reclamation is seeking bids to rehabilitate surface water intake fish screens and improve fish passage through the replacement of deteriorated pipes. Responses are due by October 21, 2021. The award is expected to be made by November 18, 2021 to the responsible bidder whose bid, conforming to the solicitation, is most advantageous to the government considering only cost or cost and other factors. The contractor will be required to complete all work within 180 calendar days of the award.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of the Interior Specifications February 2021

LEAVENWORTH NATIONAL FISH

HATCHERY

SURFACE WATER INTAKE FISH

SCREENS AND FISH PASSAGE

PHASE II PIPE REHABILITATION

Columbia Basin Project, Washington

Columbia Pacific-Northwest – Region 9

Solicitation No. 140R1021B0015

This solicitation issued by Contracting Officer

Lance Fleming Columbia Pacific Northwest Interior Region 9

Bureau of Reclamation 1150 North Curtis Road, Suite 100

Boise ID 83706-1234

LEAVENWORTH NATIONAL FISH HATCHERY SURFACE WATER INTAKE FISH

SCREENS AND FISH PASSAGE PROJECT

PHASE II PIPELINE REHABILITATION

COLUMBIA BASIN PROJECT - WASHINGTON

FOREWORD

Work is located approximately 4 miles southwest of Leavenworth, Washington, in Chelan County. Work is for rehabilitating and replacing existing pipeline. Principal components of the work include, but are not limited to the following:

Relining pipeline from existing intake on Icicle Creek to US Fish and Wildlife Service Land, and replacing existing pipeline on US Fish and Wildlife Service Land.

PRE-BID SITE VISIT: SEE SECTION L FOR SITE VISIT INFORMATION.

ATTENDEES ARE TO PROVIDE AND WEAR SAFETY BOOTS, HARD HATS, AND

SAFETY VESTS.

FOR DATE AND PLACE OF BID OPENING, SEE “SOLICITATION, OFFER, AND

AWARD,” STANDARD FORM 1442.

FOR INFORMATION REGARDING BUREAU OF RECLAMATION'S PUBLICATION

"RECLAMATION SAFETY AND HEALTH STANDARDS" INCLUDING REVISIONS

AT https://www.usbr.gov/safety/rshs/index.html WHICH IS APPLICABLE TO WORK

UNDER THIS CONTRACT, SEE CLAUSE AT WBR 1452.223-81, SAFETY AND

HEALTH.

Leavenworth National Fish Hatchery Surface Water Intake Fish Screen and Fish Passage - Phase II Pipe Rehabilitation Columbia Basin Project, Washington Solicitation No. 140R1021B0015 i

PART I THE SCHEDULE..................................................................................................... A-1

SECTION A SOLICITATION/CONTRACT FORM ........................................................ A-2

SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS ..................................... B-1

SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK ................ C-1

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 14 10 Use of Site 01 14 12 Work Restrictions 01 14 30 Interruption of Services 01 31 19 Project Management and Coordination 01 31 30 Contract Document Management System 01 32 10 Construction Program 01 33 00 Submittals 01 33 26 Electrical Drawings and Data 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 22 First Aid 01 35 30 Contractor’s Onsite Safety and Health Personnel 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 46 20 Testing Agency Services 01 51 00 Temporary Utilities 01 55 00 Vehicular Access and Parking 01 55 20 Traffic Control 01 56 10 Protection of Existing Utilities and Installations 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 57 35 Oil Spill Prevention 01 57 50 Tree and Plant Protection 01 57 60 Protected Species 01 57 70 Fire Protection and Prevention 01 57 90 Preservation of Historical and Archaeological Data 01 60 00 Product Requirements 01 71 20 Surveying 01 74 00 Cleaning and Waste Management 01 78 30 Project Record Documents 01 79 20 Training

DIVISION 02 - EXISTING CONDITIONS

02 41 10 Selective Site Demolition 02 80 10 General Requirements for Hazardous Materials ii

02 82 20 Removal and Disposal of Asbestos Containing Materials

DIVISION 03 – CONCRETE

03 11 10 Concrete Forming 03 20 00 Concrete Reinforcing 03 30 00 Cast-in-Place Concrete 03 48 00 Precast Concrete Structures 03 62 20 Non-shrink Grout for Equipment and Metalwork 03 81 10 Concrete Removal and Disposal

DIVISION 05 – METALS

05 50 00 Metal Fabrications

DIVISION 08 - OPENINGS

08 31 20 Floor Access Hatches

DIVISION 09 – FINISHES

09 96 20 Coatings

DIVISION 26 - ELECTRICAL

26 05 02 Basic Electrical Materials and Methods 26 05 10 Conductors and Cables 26 05 26 Grounding and Bonding 26 05 33 Raceways and Boxes 26 05 80 Wiring Checkout and Tests 26 24 20 Control Boards

DIVISION 31 – EARTHWORK

31 02 10 Water for Dust Abatement 31 03 10 Diversion and Care of Water During Construction 31 03 33 Removal and Control of Water 31 11 00 Clearing and Grubbing 31 14 10 Stripping 31 23 02 Compacting Earth Materials 31 23 11 Earthwork for Pipe and Structures 31 23 39 Disposal of Excavated Materials 31 23 70 Controlled Low Strength Material 31 25 10 Erosion Control iii

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 12 00 Asphaltic Concrete Repairs 32 15 10 Gravel Surfacing 32 92 20 Seeding and Soil Supplements

DIVISION 33 – UTILITIES

33 05 30 Control Valve Vault 33 11 10 Cured-in-Place Pipe (CIPP) 33 11 18 HDPE Pressure Pipe

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 21 95 Steel Piping 35 22 15 Valves and Equipment

DIVISION 51 - INFORMATION AVAILABLE TO OFFERORS

51 00 00 Information Available to Offerors 51 00 30 Inadvertent Discovery Plan

DIVISION 52 - DRAWINGS

52 00 00 Drawings

DIVISION 53 - GEOLOGIC INVESTIGATIONS AND RECORDS

53 10 00 Geological Investigations 53 10 15 Photographs of Geologic Investigation Test Pits 53 20 00 Records of Geologic and Subsurface Investigations

PART I THE SCHEDULE

SECTION D PACKAGING AND MARKING .................................................................. D-1

SECTION E INSPECTION AND ACCEPTANCE ............................................................ E-1

E.1. 52.236-5 Material and Workmanship (Apr 1984) ..................................................... E-1

E.2. 52.246-12 Inspection of Construction (Aug 1996) .................................................... E-1

E.3. 52.246-21 Warranty of Construction (Mar 1994). .................................................... E-1

SECTION F DELIVERIES AND PERFORMANCE ......................................................... F-1

F.1. 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984) ...... F-1

F.2. 52.211-12 Liquidated Damages - Construction (Sep 2000) ...................................... F-1 iv

F.3. 52.211-18 Variation in Estimate Quantities (Apr 1984) ........................................... F-1

F.4. 52.242-14 Suspension of Work (Apr 1984) .............................................................. F-1

SECTION G CONTRACT ADMINISTRATION .............................................................. G-1

G.1. Government Point of Contact ................................................................................... G-1

G.2. 1452.201-70 Authorities and Delegations (Sep 2011) ............................................. G-1

G.3. DOI-AAAP-0028 Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) ................................................................................................... G-1

G.4. WBR 1452.201-80 Contracting Officer’s Representative’s Authorities and Limitations – Bureau of Reclamation (May 2018) .............................................................. G-2

SECTION H SPECIAL CONTRACT REQUIREMENTS................................................. H-1

H.1. Key Personnel Requirements – Bureau of Reclamation – PN Region (Feb 1995) .. H-1

H.2. DOI-AAAP-0050 Contractor Performance Assessment Reporting System (May 2018) H-1

PART II CONTRACT CLAUSES .......................................................................................... H-1

SECTION I CONTRACT CLAUSES ................................................................................. I-1

I.1. 52.252-2 Clauses Incorporated by Reference (Feb 1998) .......................................... I-1

I.2. 52.202-1 Definitions (Jun 2020) ................................................................................. I-1

I.3. 52.203-3 Gratuities (Apr 1984) .................................................................................. I-1

I.4. 52.203-5 Covenant Against Contingent Fees (May 2014) ......................................... I-1

I.5. 52.203-6 Restriction on Subcontractor Sales to the Government (June 2020) .......... I-1

I.6. 52.203-7 Anti-Kickback Procedures (June 2020) ...................................................... I-1

I.7. 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May 2014) .............................................................................................................. I-1

I.8. 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014) ..... I-1

I.9. 52.203-12 Limitations on Payments to Influence Certain Federal Actions (June 2020) I-1

I.10. 52.203-13 Contractor Code of Business Ethics and Conduct (Jun 2020) .................. I-1

I.11. 52.203-14 Display of Hotline Poster(s) (Jun 2020) .................................................... I-1

I.12. 52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights (June 2020) ................................................................. I-1

I.13. 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017)............................................................................................................ I-1

I.14. 1452.203-70 Restrictions on Endorsements – Department of Interior (Jul 1996) ...... I-1 v

I.15. 52.204-4 Printed or Copied Doubled-Sided on Postconsumer Fiber Content Paper (May 2011) ............................................................................................................................ I-1

I.16. 52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011) ............ I-1

I.17. 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) .............................................................................................................................. I-2

I.18. 52.204-12 Unique Entity Identifier Maintenance (Oct 2016) .................................... I-2

I.19. 52.204-13 System for Award Management (Oct 2018) ............................................. I-2

I.20. 52.204-14 Service Contract Reporting Requirements (Oct 2016) ............................. I-2

I.21. 52.204-18 Commercial and Government Entity Code Maintenance (Aug 2020) ...... I-2

I.22. 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) I-2

I.23. 52.204-21 Basic Safeguarding of Covered Contract Information Systems (Jun 2016)I-

I.24. 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) .............. I-4

I.25. 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (Aug 2020) .................................................................. I-4

I.26. 1452.204-70 Release of Claims – Department of Interior (Jul 1996) ........................ I-6

I.27. 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (June 2020) ........................ I-6

I.28. 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) ................................................................................................................ I-6

I.29. 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015) I-6

I.30. 52.210-1 Market Research (Jun 2020) ....................................................................... I-6

I.31. 52.214-26 Audit and Records-Sealed Bidding (Jun 2020). ........................................ I-6

I.32. 52.214-27 Price Reduction for Defective Certified Cost or Pricing Data- Modifications-Sealed Bidding (Jun 2020) ............................................................................. I-7

I.33. 52.214-28 Subcontractor Certified Cost or Pricing Data-Modifications-Sealed Bidding (Jun 2020). ............................................................................................................... I-7

I.34. 52.214-29 Order of Precedence-Sealed Bidding (Jan 1986). ..................................... I-7

I.35. 52.219-6 Notice of Total Small Business Set-Aside (Nov 2020) ............................... I-7

I.36. 52.219-8 Utilization of Small Business Concerns (Oct 2018) ................................... I-7

I.37. 52.219-14 Limitations on Subcontracting (DEVIATION JUN 2020) ....................... I-7 vi

I.38. 52.219-28 Post Award Small Business Program Representation (Nov 2020) ........... I-7

I.39. 52.222-3 Convict Labor (Jun 2003) ........................................................................... I-7

I.40. 52.222-4 Contract Work Hours and Safety Standards (Mar 2018) ............................ I-7

I.41. 52.222-6 Construction Wage Rate Requirements (Aug 2018) ................................... I-7

I.42. 52.222-7 Withholding of Funds (May 2014) .............................................................. I-7

I.43. 52.222-8 Payrolls and Basic Records (Feb 2021) ...................................................... I-7

I.44. 52.222-9 Apprentices and Trainees (Jul 2005) ........................................................... I-7

I.45. 52.222-10 Compliance with Copeland Act Requirements (Feb 1998) ...................... I-7

I.46. 52.222-11 Subcontracts (Labor Standards) (May 2014) ............................................ I-7

I.47. 52.222-12 Contract Termination – Debarment (May 2014) ....................................... I-7

I.48. 52.222-13 Compliance with Construction Wage Rate Requirements and Relation Regulations (May 2014) ........................................................................................................ I-7

I.49. 52.222-14 Disputes Concerning Labor Standards (Feb 1988) ................................... I-7

I.50. 52.222-15 Certification of Eligibility (May 2014) ..................................................... I-7

I.51. 52.222-21 Prohibition of Segregated Facilities (Apr 2015) ....................................... I-7

I.52. 52.222-26 Equal Opportunity (Sep 2016) .................................................................. I-7

I.53. 52.222-27 Affirmative Action Compliance Requirements for Construction (Apr 2015) I-7

I.54. 52.222-35 Equal Opportunity for Veterans (June 2020) ............................................ I-8

I.55. 52.222-36 Equal Opportunity for Workers with Disabilities (June 2020) ................. I-8

I.56. 52.222-37 Employment Reports on Veterans (Jun 2020) .......................................... I-8

I.57. 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) ............................................................................................................................. I-8

I.58. 52.222-50 Combating Trafficking of Persons (Oct 2020) .......................................... I-8

I.59. 52.222-54 Employment Eligibility Verification (Oct 2015) ...................................... I-8

I.60. 52.222-55 Minimum Wages Under Executive Order 13658 (Nov 2020) .................. I-9

I.61. 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2017) ...................... I-9

I.62. 52.223-3 Hazardous Materials Identification and Material Safety Data (Feb 2021), Alternate I (Jul 1995)............................................................................................................. I-9

I.63. 52.223-5 Pollution Prevention and Right-to-Know Information (May 2011)............ I-9

I.64. 52.223-6 Drug Free Workplace (May 2001) .............................................................. I-9

I.65. 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) .................................................................................................................. I-9 vii

I.66. 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (June 2020) ............................................................................................................................ I-9

I.67. 52.223-20 Aerosols (Jun 2016) .................................................................................. I-9

I.68. 52.223-21 Foams (Jun 2016) ...................................................................................... I-9

I.69. WBR 1452.223-80 Asbestos Free Warranty – Bureau of Reclamation (Oct 1992) ... I-9

I.70. WBR 1452.223-81 Safety and Health – Bureau of Reclamation (Jun 2015) ........... I-10

I.71. WBR 1452.223-82 Protecting Federal Employees and the Public from Exposure to Tobacco Smoke in the Federal Workplace (Oct 1998) ....................................................... I-11

I.72. Executive Order on Protecting the Federal Workforce and Requiring Mask-Wearing

– CPN Region (Mar 2021) .................................................................................................. I-11

I.73. 52.225-11 Buy American -Construction Materials Under Trade Agreements (Jan 2021), Alternate I (Jan 2021) ............................................................................................... I-11

I.74. 52.225-13 Restrictions on Certain Foreign Purchases (Feb 2021) ........................... I-18

I.75. 52.227-1 Authorization and Consent (Jun 2020) ...................................................... I-19

I.76. 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Jun 2020) I-19

I.77. 52.227-4 Patent Indemnity – Construction Contracts (Dec 2007) ........................... I-19

I.78. CONTRACT DOCUMENT MANAGEMENT SYSTEM (CDMS) – CPN REGION

(APR 2021) .......................................................................................................................... I-19

I.79. 52.228-1 Bid Guarantee (Sep 1996) ......................................................................... I-20

I.80. 52.228-2 Additional Bond Security (Oct 1997) ....................................................... I-20

I.81. 52.228-5 Insurance – Work on a Government Installation (Jan 1997) .................... I-20

I.82. 52.228-11 Pledges of Assets (Feb 2021) .................................................................. I-20

I.83. 52.228-12 Prospective Subcontract Requests for Bonds (May 2014) ...................... I-20

I.84. 52.228-14 Irrevocable Letter of Credit (Nov 2014) ................................................. I-20

I.85. 52.228-15 Performance and Payment Bonds – Construction (Jun 2020)................. I-20

I.86. 1452.228-70 Liability Insurance – Department of Interior (Jul 1996) ..................... I-22

I.87. WBR 1452.228-84 Certification of Representatives for Corporate Sureties (Sep 1996) I-22

I.88. 52.229-3 Federal, State, and Local Taxes (Feb 2013) .............................................. I-23

I.89. Notice of Washington State Sales and Use Tax – Bureau of Reclamation – C-PN Region (Feb 1995) ............................................................................................................... I-23

I.90. WBR 1452.231-81 Equipment Ownership and Operating Expense (Jul 1998) ....... I-23

I.91. 52.232-5 Payment Under Fixed-Price Construction Contracts (May 2014) ............ I-25 viii

I.92. 52.232-17 Interest (May 2014) ................................................................................. I-25

I.93. 52.232-23 Assignment of Claims (May 2014) ......................................................... I-25

I.94. 52.232-27 Prompt Payment for Construction Contracts (Jan 2017) ........................ I-25

I.95. 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (Oct 2018) ............................................................................................................................ I-25

I.96. 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) ..................... I-25

I.97. 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013) I-25

I.98. WBR 1452.232-80 Limitation of Funds – Bureau of Reclamation (Sep 2003) ....... I-25

I.99. WBR 1452.232-81 Payment for Mobilization and Preparatory Work – Bureau of Reclamation (Sep 2003), Alternate I (May 2000) ............................................................... I-27

I.100. WBR 1452.232-82 Other Invoice Requirements – Bureau of Reclamation (Jul 1998) I-29

I.101. WBR 1452.232-83 Payment for Technical Data – Bureau of Reclamation (Dec 1994) I-29

I.102. 52.233-1 Disputes (Mar 2014), Alternate I (Dec 1991) ........................................... I-30

I.103. 52.233-3 Protest After Award (Aug 1996) ............................................................... I-30

I.104. 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) ....................... I-30

I.105. WBR 1452.233-81 Claims Accounting – Bureau of Reclamation (Jul 1993) ......... I-30

I.106. 52.236-2 Differing Site Conditions (Apr 1984) ....................................................... I-30

I.107. 52.236-3 Site Investigation and Conditions Affecting Work (Apr 1984) ................ I-30

I.108. 52.236-4 Physical Data (Apr 1984) .......................................................................... I-30

I.109. 52.236-5 Material and Workmanship (Apr 1984) .................................................... I-30

I.110. 52.236-6 Superintendence by the Contractor (Apr 1984) ........................................ I-30

I.111. 52.236-7 Permits and Responsibilities (Nov 1991) .................................................. I-30

I.112. 52.236-8 Other Contracts (Apr 1984) ....................................................................... I-30

I.113. 52.236-9 Protecting Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) ................................................................................................... I-30

I.114. 52.236-10 Operation and Storage Areas (Apr 1984) ................................................ I-31

I.115. 52.236-11 Use and Possession Prior to Completion of Work (Apr 1984) ............... I-31

I.116. 52.236-12 Cleaning Up (Apr 1984) .......................................................................... I-31

I.117. 52.236-13 Accident Prevention (Nov 1991), Alternate I (Nov 1991) ...................... I-31

I.118. 52.236-17 Layout of Work (Apr 1984) .................................................................... I-31 ix

I.119. 52.236-21 Specifications and Drawings for Construction (Feb 1997), Alternate I (Apr 1984) I-31

I.120. 52.236-26 Preconstruction Conference (Feb 1995) .................................................. I-31

I.121. WBR 1452.236-84 Preservation of Cultural Resources – Bureau of Reclamation (Feb 2000) I-31

I.122. WBR 1452.237-80 Security Requirements – Bureau of Reclamation (Feb 2017) .. I-33

I.123. 52.242-13 Bankruptcy (Jul 1995) ............................................................................. I-44

I.124. 52.243-4 Changes (Jun 2007) ................................................................................... I-44

I.125. 52.243-6 Change Order Accounting (Apr 1984) ...................................................... I-44

I.126. WBR 1452.243-80 Modification Proposals, Alternate IV – Bureau of Reclamation (Jul 1998) ............................................................................................................................. I-44

I.127. 52.244-2 Subcontracts (Jun 2020) ............................................................................ I-45

I.128. 52.244-6 Subcontracts for Commercial Items (Nov 2020) ...................................... I-45

I.129. 52.248-3 Value Engineering-Construction (Oct 2020), Alternate 1 (Apr 1984) ...... I-45

I.130. 52.249-2 Termination for Convenience of the Government (Fixed Price) (Apr 2012), Alternate I (Sep 1996) ......................................................................................................... I-45

I.131. 52.249-10 Default (Fixed-Price Construction) (Apr 1984) ...................................... I-45

I.132. 52.252-6 Authorized Deviation in Clauses (Nov 2020) ........................................... I-45

I.133. 52.253-1 Computer Generated Forms (Jan 1991) .................................................... I-45

PART III LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS ................ I-1

SECTION J LIST OF ATTACHMENTS ........................................................................... J-1

J.1. Department of Labor, General Wage Decision No. WA20210065, 01/22/2021, Heavy Construction, Chelan County, WA (6 pages) ....................................................................... J-1

J.2. Bid Bond, Standard Form 24, OMB Control Number 9000-0045 Exp Date 8/31/2022 (2 Pages) ............................................................................................................................... J-1

J.3. Subcontracting Percentage Worksheet (2 pages) ...................................................... J-1

J.4. Subcontracting 140R1021B0015 Drawings (Separate Attachment, 77 pages) ......... J-1

J.5. Permits (Separate Attachments, Numbering J.5a through J.5d ................................. J-1

PART IV REPRESENTATIONS AND INSTRUCTIONS....................................................... J-1

SECTION K REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS

OF OFFERORS OR RESPONDENTS ................................................................................... K-1

K.1. 52.203-2 Certificate of Independent Price Determination (Apr 1985) ..................... K-1

K.2. 52.204-8 Annual Representations and Certifications (Mar 2020) ............................ K-2 x

K.3. 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services and Equipment (Oct 2020) ............................................................... K-6

K.4. 52.204-26 Covered Telecommunications Equipment of Services-Representation (Oct 2020) K-8

K.5. 52.209-7 Information Regarding Responsibility Matters (Oct 2018) ...................... K-8

K.6. 52.209-13 Violation of Arms Control Treaties or Agreements-Certification (Feb 2021) K-10

SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS ......... L-1

L.1. 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998) ................. L-1

L.2. 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality (Jan 2017) .................................................................................................... L-1

L.3. 52.204-7 System for Award Management (Oct 2018) .............................................. L-1

L.4. 52.204-16 Commercial and Government Entity Code Reporting (Aug 2020) .......... L-1

L.5. 52.211-1 Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29 (Aug 1998) L-1

L.6. 52.211-2 Availability of Specifications, Standards, and Data Item Descriptions Listed in the Acquisitions Streamlining and Standardization Information System (ASSIST) (Apr 2014) L-1

L.7. 52.211-6 Brand Name or Equal (Aug 1999) ............................................................. L-1

L.8. 52.214-3 Amendments to Invitations for Bids (Dec 2016) ....................................... L-1

L.9. 52.214-4 False Statements in Bids (Apr 1984) .......................................................... L-1

L.10. 52.214-5 Submission of Bids (Dec 2016) ................................................................. L-1

L.11. 52.214-6 Explanation to Prospective Bidders (Apr 1984) ........................................ L-1

L.12. 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids (Nov 1999) .. L-1

L.13. 52.214-12 Preparation of Bids (Apr 1984) ................................................................ L-1

L.14. 52.214-18 Preparation of Bids -- Construction (Apr 1984)....................................... L-1

L.15. 52.214-19 Contract Award -- Sealed Bidding -- Construction (Aug 1996) .............. L-2

L.16. 52.214-34 Submission of Offers in the English Language (Apr 1991) ..................... L-3

L.17. 52.214-35 Submission of Offers in U.S. Currency (Apr 1991) ................................. L-3

L.18. 52.216-1 Type of Contract (Apr 1984) ...................................................................... L-3

L.19. 52.222-5 Construction Wage Requirements – Secondary Site of Work (May 2014) . L-xi

L.20. 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (Feb 1999) ....................................................... L-3

L.21. Non-Discrimination Notice to U.S. DOI Contractors, Subcontractors, and Lessors (May 2014) ........................................................................................................................... L-5

L.22. 52.225-12 Notice of Buy American Requirement-Construction Materials Under Trade Agreements (May 2014), Alternate II (Jun 2009) ...................................................... L-5

L.23. 52.232-13 Notice of Progress Payments (Apr 1984) ................................................. L-7

L.24. WBR 1452.232-93 Invoicing Projection Information – Bureau of Reclamation - Pacific Northwest Region (Mar 2002) ................................................................................. L-7

L.25. 1452.233-2 Service of Protest – Department of Interior (Deviation) (Jul 1996) ...... L-7

L.26. 52.236-27 Site Visit (Construction) (Feb 1995), Alternate I (Feb 1995) .................. L-7

L.27. Site Visit Attendance Restriction – Bureau of Reclamation – Pacific Northwest Region (May 2004)............................................................................................................... L-8

L.28. WBR 1452.236-86 Instruction for Mobilization and Preparatory Work Schedule Line Item - Multiple Schedules - Bureau of Reclamation (May 2000) ........................................ L-8

L.29. 52.252-5 Authorized Deviation in Provisions (Apr 1984) ........................................ L-8

SECTION M EVALUATION FACTORS FOR AWARD ................................................ M-1

M.1. Price Reasonableness Determination (May 2010) ................................................... M-1

M.2. WBR 1452.225-82 Notice of World Trade Organization Government Procurement Agreement Evaluations - Bureau of Reclamation (May 2005) .......................................... M-1

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040522262

Bureau of Reclamation

Pacific Northwest Region

Regional Office Acquisition Management Division

R10

1150 N. Curtis Road, Ste. 100

Boise ID 83706-1234

Attention: 140R1021B0015 c/o PN-7308

Bureau of Reclamation 1150 N. Curtis Road, Ste. 100 Boise, ID 83706-1234

Michael Naseath 2083785027 x

06/22/2021

140R1021B0015

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Project Title: Leavenworth National Fish Hatchery - Surface Water Intake Fish

Screens and Fish Passage Phase II Pipe Rehabilitation, Columbia Basin Project, Washington, Columbia Pacific-Northwest - Region 9.

This solicitation is set-aside for Total Small Business concerns.

The construction magnitude is between $5,000,000.00 and $10,000,000.00

The Contractor shall complete the work in accordance with F.1 52.211-10

Commencement, Prosecution, and Completion of Work (Apr 1984).

A site visit has been scheduled for June 29, 2021 at 01:00 PM PST.

Block 11 states the Period of Performance (POP) is 1359 days from Notice to Proceed

(NTP) which is correct. Due to system limitations, the POP reflected under CLIN 10 reflects a date as the system will not accept number of days.

Please ensure Company DUNS number is reflected on the Bid cover sheet.

Continued ...

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 1359 calendar days and complete it within ________________ ________________ calendar days after receiving see 52.211-10

07/26/2021

NSN 7540-01-155-3212

x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Lance Fleming

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140R1021B0015

Continued...

Legacy Doc #: BOR

Delivery Location Code: 0009906765

Bureau of Reclamation-PN-CCAO

Columbia Cascades Area Office

1917 Marsh Road

Yakima WA 98901-2058 US

Period of Performance: 08/30/2021 to 05/20/2025

00010 LVN Wtr Intake-SWISP PH 2-Inspect/Survey

(Price Schedule CLINS 1 though 4)

See following continuation page(s).

Product/Service Code: Y1PZ

Product/Service Description: CONSTRUCTION OF

OTHER NON-BUILDING FACILITIES

Delivery: 05/20/2025

00020 LVN Wtr Intake-SWISP PH 2-Construction

(Price Schedule CLINS 5 through 27)

See following continuation page(s).

Product/Service Code: Y1PZ

Product/Service Description: CONSTRUCTION OF

OTHER NON-BUILDING FACILITIES

Delivery: 05/20/2025

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Leavenworth National Fish Hatchery Surface Water Intake Fish Screens and Fish Passage Project Phase II Pipeline Rehabilitation Columbia Basin Project, WA Solicitation No. 140R1021B0015

Supplies or Services and Prices/Costs B - 1

CONTINUATION OF

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

LEAVENWORTH NATIONAL FISH HATCHERY SURFACE WATER INTAKE FISH

SCREENS AND FISH PASSAGE PROJECT

PHASE II PIPELINE REHABILITATION

COLUMBIA BASIN PROJECT – WASHINGTON

B.1 PRICE SCHEDULE

(a) Offers will be considered for award on the following Price Schedules, but no offer will be considered for award on only a part of the Price Schedules.

(1) Offerors shall complete Price Schedule A and Price Schedule B. Offers for less than the total of Price Schedules will be considered nonresponsive and will not be evaluated for award. Offers submitted with an incomplete Price Schedules will be considered nonresponsive.

(b) Offers are subject to the terms and conditions of this solicitation.

(c) Quantities in the Price Schedules are estimated quantities for comparison of offers only.

Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns.

(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.

(e) Definitions:

(1) CLIN - Contract Line Item Number.

PRICE SCHEDULE A

CLIN Section Supplies or Services Quantity and Unit Unit Price Amount

1 1 WBR

1452.232- 81 Alt III

Mobilization and Preparatory Work

For the lump-sum of $

2 01 31 30 Contract Document Management System

For the lump-sum of $

Columbia Basin Project, WA Solicitation No. 140R1021B0015

Supplies or Services and Prices/Costs B - 2

PRICE SCHEDULE A

CLIN Section Supplies or Services Quantity and Unit Unit Price Amount

3 31 03 10 Diversion and Care of Water During Construction

For the lump-sum of $

4 33 11 10 Cured-In-Place Pipe (CIPP) Pre-Work

For the lump-sum of $

TOTAL FOR PRICE SCHEDULE A $_________________

PRICE SCHEDULE B

CLI

N Section Supplies or Services

Quantity and Unit Unit Price Amount

5 WBR

1452.232- 81 Alt III

Mobilization and Preparatory Work

For the lump-sum of $

6 01 31 30 Contract Document Management System

For the lump-sum of $

7 02 41 10 Site Demolition For the lump-sum of $

8 02 82 20 Asbestos Inspection For the lump-sum of $

9 02 82 20 Asbestos-Containing Material Abatement 15 sq ft $ $

10 03 30 00 Reinforced Concrete 16 cu yd $ $

11 26 05 02 Complete Electrical System

For the lump-sum of $

12 31 03 10 Diversion and Care of Water During Construction

For the lump-sum of $

13 31 11 00 Clearing and Grubbing 4 acre $ $

14 31 14 10 Stripping 7,800 sq yd

Columbia Basin Project, WA Solicitation No. 140R1021B0015

Supplies or Services and Prices/Costs B - 3

PRICE SCHEDULE B

CLI

N Section Supplies or Services

Quantity and Unit Unit Price Amount

15 31 23 11 Excavation for Structures

350 cu yd $ $

16 31 23 11 Rock Excavation 21 cu yd $ $

17 31 23 11 Excavation for Pipe Trench

12,500 cu yd

18 31 23 11 Compacted Backfill about Structures

320 cu yd $ $

19 31 23 11 Compacted Backfill about Pipe Trench

10,500 cu yd

20 32 12 00 Asphaltic Concrete Replacement

2,900 sq yd

21 32 92 20 Seeding and Soil Supplements

4 acre $ $

22 33 05 30 Control Valve Vault For the lump-sum of $

23 33 11 10 Cured-in-Place Pipe (CIPP) Lining, approximate diameter of 33.15-inches

525 lin ft $ $

24 33 11 10 Cured-in-Place Pipe (CIPP) Lining, approximate diameter of 29.17-inches

4,000 lin ft

25 33 11 18 HDPE Pressure Pipe 1,685 lin ft

26 35 21 95 Steel Piping For the lump-sum of $

27 35 22 14 Valves and Equipment For the lump-sum of $

TOTAL FOR PRICE SCHEDULE B $_________________

TOTAL FOR PRICE SCHEDULES A and B $_________________

Columbia Basin Project, WA Solicitation No. 140R1021B0015

Supplies or Services and Prices/Costs B - 4

END OF SECTION

TECHNICAL SERVICE CENTER

WRITTEN SPECIFICATIONS SIGNATURE SHEET

Specifications Title: _________________________________________________

Project Title:

Region:

Prepared:

Technical Approval:

Certified:

Leavenworth National Fish Hatchery

Surface Water Intake – Fish Screens and Fish Passage

Phase II – Pipeline Rehabilitation – Columbia Basin Project, WA

Columbia-Pacific Northwest

MICHAEL VON

BUHR

Digitally signed by MICHAEL

VON BUHR

Date: 2020.12.16 10:49:21 -07'00'

KYLIE

PELZER

Digitally signed by KYLIE

PELZER

Date: 2020.12.16 14:42:05 -07'00'

ROBERT

CARLSON

Digitally signed by

ROBERT CARLSON

Date: 2020.12.17 12:29:57 -07'00'

P.E.

P.E.

P.E.

This page intentionally left blank.

DIVISION 01 - GENERAL REQUIREMENTS

Columbia Basin Project, WA Solicitation No. 140R1021B0015

Summary of Work 01 11 00 - 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.01 LOCATION

A. Work is located approximately 4 miles southwest of Leavenworth, Washington, in Chelan County.

1.02 PRINCIPLE COMPONENTS OF WORK

A. Excavation Support.

B. Relining pipe using Cured in Place Pipe (CIPP).

C. Replaced pipe in a trench parallel to existing pipe. Abandoning the existing pipe in place.

D. Installing new control valve vault.

E. Installing thrust blocks, valves, and equipment.

F. Miscellaneous metalwork fabrications for control valve vault.

G. Earthwork.

H. Demolition of Concrete.

I. Instrumentation.

J. Control and Monitoring System.

K. Electrical Distribution.

1.03 SPECIFICATIONS REQUIREMENTS

A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 53.

B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.

C. Where specifications are written in streamlined form, the words “shall be” are included by inference where a colon (:) is used within the sentence or phrase.

Columbia Basin Project, WA Solicitation No. 140R1021B0015

Summary of Work 01 11 00 - 2

1.04 DEFINITIONS

A. When the specifications use a word or term defined in the Federal Acquisition Regulations (FAR), the definition of the word or term shall be in accordance with FAR sections in effect at the time the solicitation was issued.

1.05 ACRONYMS

A. The following acronyms apply to specifications Divisions 1 through 53:

1. CO: Contracting Officer.

2. COR: Contracting Officer’s Representative.

3. USFWS: United States Fish and Wildlife Service.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

Columbia Basin Project, WA Solicitation No. 140R1021B0015

Use of Site 01 14 10 - 1

SECTION 01 14 10

USE OF SITE

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in Price Schedules for other items of work.

1.02 REFERENCE STANDARDS

A. Bureau of Reclamation (Reclamation)

1. Cleaning Manual-2012 Inspection and Cleaning Manual for Equipment and Vehicles to Prevent the Spread of Invasive Species (Technical memorandum No. 86-68220-07-05), available online at:

https://www.usbr.gov/mussels/prevention

1.03 SUBMITTALS

A. Submit in accordance with Section 01 33 00 - Submittals.

B. RSN 01 14 10-1, Land Use and Landscape Rehabilitation Plan:

1. For each Contractor use site on Government land.

a. Show use location and extent of impact. Uses include but are not limited to the following:

1) Buildings and service areas including offices, shops, warehouses, storage areas, fuel and oil storage areas, and fabrication yards.

2) Parking areas, temporary roads, and haul routes.

3) Bridges and culverts.

4) Utilities including air, power, and water lines; fire hydrants; and compressor station.

5) First-aid and medical facilities.

6) Areas for processing, storing, and disposing of waste materials from construction operations.

7) Temporary fences.

b. Describe methods to preserve, protect, and repair if damaged, vegetation (such as trees, shrubs, and grass) and other landscape features on or

Columbia Basin Project, WA Solicitation No. 140R1021B0015

Use of Site 01 14 10 - 2 adjacent to the jobsite, which are not to be removed and which do not interfere with the work required under this contract. Include methods to mark work area limits, protect disturbed areas, and prevent erosion.

c. Describe methods to protect, and repair if damaged, existing improvements and utilities at or near the jobsite.

d. Describe methods for removing temporary structures and facilities, cleanup, and rehabilitating site after completion of construction activities.

2. Submit revised drawings of changes in use of Government land made during design and erection stages or after use of Government land is in operation.

C. RSN 01 14 10-2, Other Land Use Coordination:

1. Contractor shall identify any potential use of private land not shown as Contractor Use Areas on drawings.

a. Show use, location, and potential impact.

1) Buildings and service areas including offices, shops, warehouses, storage areas, fuel and oil storage areas, and fabrication yards.

2) Parking areas, temporary roads, and haul routes.

3) Bridges and culverts.

4) Utilities including air, power, and water lines; fire hydrants; and compressor station.

5) First-aid and medical facilities.

6) Areas for processing, storing, and disposing of waste materials from construction operations.

7) Temporary fences.

b. Describe methods to preserve, protect, and repair vegetation (such as trees, shrubs, and grass) and other landscape features on or adjacent to jobsite, which are not to be removed and which do not interfere with work required under this contract. Include methods to mark work area limits, protect disturbed areas, and prevent erosion.

c. Describe methods to protect, and repair if damaged, existing improvements, and utilities, at or near jobsite.

d. Obtain COR and private landowner approval prior to use of any land areas not within the Contractor Use Area shown on the drawings.

e. Coordinate use of these lands in accordance with Section 01 57 90 - Preservation of Historical and Archeological Data.

2. Contractor shall request and pay for all Environmental Permits for these areas.

a. Obtain permits in accordance with the following sections, and other permits as necessary:

Columbia Basin Project, WA Solicitation No. 140R1021B0015

Use of Site 01 14 10 - 3

1) Section 01 57 20 – Environmental Controls

2) Section 01 57 30 – Water Pollution Control

b. In the event that environmental compliance work has not already been completed in these other land areas, the Contractor shall request and pay for all work related to compliance with the National Historic Preservation Act, the National Environmental Policy Act, the Native American Graves Protection and Repatriation Act, and related environmental compliance standards.

3. Review of these submittals will take a minimum of 45 days.

1.04 PROJECT CONDITIONS

A. Government land as shown on Informational Drawing 222-D-60347 may be used for required construction facilities.

B. When private land is used for construction facilities, or other construction purposes, make necessary arrangements associated with use of private land.

C. Government will obtain private land accesses shown on drawings prior to construction.

D. Location, construction, operation, maintenance, and removal of construction facilities on Government land will be subject to approval of the COR.

E. Do not interfere with work of other contractors or the Government in vicinity, or with reservations made by the Government for use of such land.

F. Provide access for government maintenance crews.

G. Housing for construction personnel will not be permitted on Government land, except housing for guards or watchmen as may be approved by the COR.

H. Refer to Section 01 57 30 - Water Pollution Control for restrictions on use of water from Icicle Creek.

1.05 WORK HOURS

A. For work hours and material deliveries refer to Section 01 14 12 – Work Restrictions.

1.06 OTHER CONTRACTS

A. During work under this contract, other work may be performed in the vicinity of the work or that may impact hatchery operation.

B. Cooperate and coordinate with other contracts’ contractors, including access, use of areas, and scheduling. Comply with the clause at FAR 52.236-8, Other Contracts.

Columbia Basin Project, WA Solicitation No. 140R1021B0015

Use of Site 01 14 10 - 4

C. Do not interfere with work of other contractors or the Government in the vicinity of the work.

D. Leavenworth National Fish Hatchery Surface Water Intake Fish Screens and Fish Passage Project, Phase l may be ongoing.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.01 CLEANING

A. Construction Equipment:

1. Before bringing on site, clean construction equipment to remove dirt, vegetation, and other organic material to prevent introduction of noxious weeds, and invasive plant and animal species.

2. Contractor cleaning procedures shall result in equipment being cleaned as well or better than the procedures described in Reclamation Cleaning Manual.

3. The COR will inspect construction equipment following procedures described in Reclamation Cleaning Manual before allowing the equipment onsite.

3.02 RESTORATION

A. Restore Contractor Use Areas to pre-construction condition.

Columbia Basin Project, WA Solicitation No. 140R1021B0015

Work Restrictions 01 14 12 - 1

SECTION 01 14 12

WORK RESTRICTIONS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in Price Schedules for other items of work.

1.02 REFERENCE STANDARDS

A. American Association of State Highway and Transportation Officials (AASHTO)

1. AASHTO LRFD-12 Bridge Design Specifications

1.03 DEFINITIONS

A. Low-Flow Work Period: April 17 to May 13 of any given year.

1.04 WORK RESTRICTIONS

A. Allowable Work Hours:

1. Monday through Friday: 7:00 am to 7:00 pm.

2. Work hours are 7:00 a.m. to 7:00 p.m. Monday through Friday.

a. Work outside of these hours must be approved by the CO 72 hours in advance.

b. The Contractor shall only be allowed on…