This document is Pre-Bid Site Visit Notes for a federal contract opportunity issued by the National Park Service at San Francisco Maritime National Historical Park. The solicitation number is 140P8626Q0033, titled "SAFR Bathhouse Mural Maintenance 2026."

The pre-bid site visit was conducted on June 10, 2026, at the Museum Building located at 2 Marina Boulevard, Building E, 2nd Floor, San Francisco, California 94123. The Contracting Officer's Representative is Todd Bloch. The project scope includes assessment and cleaning of murals on the second, third, and fourth floors of the bathhouse, with color assessments required on the third and fourth floors. The work explicitly excludes in-painting, touch-up, and conservation activities. Attendees toured the women's lounge and Prismatarium to observe wall and ceiling murals, identified locations of previous paint exposures on ceiling beams on the third floor, and noted that the entire fourth-floor room has been overpainted requiring paint exposures throughout all ceiling levels. An area of previous repair without an original paint layer was identified in the east stairwell on the second floor. Paint exposure of ceiling tiles is included within the scope. The notes also clarify that pre-existing ceiling cracking documented in a previous conservation project report is not new damage, and that most recent projects have used rolling scaffolding rather than motorized electric lifts on the third floor.

View the file

Other files

File Type Posted
Sol_140P8626Q0033_Amd_0002.pdf PDF
ATTACHMENT_09_-_140P8626Q0033_-_Site_Visit_Sign_In_Sheet_0002.pdf PDF
ATTACHMENT_07_-_DOC_H_-_Maritime_Museum_4th_Floor_Mural_Report_2024_0001.pdf PDF
ATTACHMENT_07_-_DOC_L_-_GUIDANCE_on_SSSP_0001.pdf PDF
ATTACHMENT_07_-_DOC_D_-_Condition_and_Treatment_Report_3rd_Flr_Murals_2023_0001.pdf PDF
ATTACHMENT_07_-_DOC_K_-_4th_Level_Lead_Initial_Report_0001.pdf PDF
ATTACHMENT_07_-_DOC_I_-_Finish_Analysis_Maritime_Museum_(2021)_0001.pdf PDF
Sol_140P8626Q0033_Amd_0001.pdf PDF
ATTACHMENT_07_-_DOC_G_-_Womens_Lounge_Mural_Treatment_Report__0001.pdf PDF
ATTACHMENT_07_-_DOC_E_-_Overpaint_Removal_Test_3rd_Floor_of_Bathhouse_2015_0001.pdf PDF
ATTACHMENT_07_-_DOC_J_-_3rd_Floor_Ceiling_Tile_HAZMAT_0001.pdf PDF
ATTACHMENT_07_-_DOC_F_-_Prismatarium_Conservation_of_H_H__Psych_Color_Chart_Rm_0001.pdf PDF
ATTACHMENT_03_-_140P8626Q0033_-_DOL_WD_SCA_-_SAN_FRANCISCO_COUNTY.pdf PDF
ATTACHMENT_05_-_140P8626Q0033_-__Bathhouse_Drawings_-_Mural_and_Exposure_Window_Locations.pdf PDF
ATTACHMENT_06_-_140P8626Q0033_-_Bathhouse_Photos.pdf PDF
ATTACHMENT_04_-_140P8626Q0033_-_RELEVANT_EXPERIENCE_FORM.pdf PDF
Sol_140P8626Q0033.pdf PDF
ATTACHMENT_01_-_140P8626Q0033_-_CONTRACT_PRICE_SCHEDULE.xlsx XLSX spreadsheet
ATTACHMENT_02_-_140P8626Q0033_-_SOW.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

NATIONAL PARK SERVICE

SAN FRANCISCO MARITIME NATIONAL HISTORICAL PARK

2 MARINA BLVD. BUILDING E, 2ND FLOOR

SAN FRANCISCO, CALIFORNIA 94123

IN REPLY REFER TO:

SAFR Bathhouse Mural Maintenance 2026 Solicitation 140P8626Q0033

PRE-BID SITE VISIT

DATE:

June 10, 2026

PREPARED BY:

Todd Bloch

ATTENDEES:

• Todd Bloch, COR, San Francisco Maritime NHP

• See attached Sign-In Sheet

June 10, 2026 Site Visit Notes (all attendees)

Attendees met in the lobby of the Museum Building at 9:00 AM. It was reiterated to the attendees that the project is for assessment and cleaning, and not in-painting, touch up or conservation, and includes color assessments on the third and fourth floors.

The group moved to the women’s lounge and Prismatarium where the murals were observed. The group observed the wall and ceiling murals.

The grouped moved to and ascended the west stair from the second floor to the third floor. Locations of previous paint exposures were identified. On the third floor, locations of previous paint exposures on the ceiling beams were identified.

The group ascended the stairs to the fourth floor. It was noted that the entire room had been overpainted and paint exposures are needed throughout, including all levels of the ceiling.

The group returned to the third floor and descended the east stair to the second floor. In the stairwell, an area of previous repair, which does not have an original paint layer was identified.

Questions and Answers:

Q. Regarding a portion of the Prismatarium ceiling that shows cracking, is that thought to be new damage?

A. Please refer to the completion report for the previous ceiling conservation project, which identified areas that had pre-existing cracking.

Q. Has a motorized electric lift been used on the third floor?

A. It is not known if a lift has been brought to the third floor. The most recent projects have used rolling scaffolding.

Q. Confirming that paint exposure of the ceiling tile is included in the scope?

A. Yes

End of Pre-Bid Site Visit Notes