This is Amendment 0001 to solicitation 140P8625Q0017, providing answers to contractor questions and adding Attachment 6 (Site Visit Sign-In Sheet). The amendment, issued by NPS Pacific West Region - GOGA MABO in San Francisco, has an effective date of February 25, 2025.

The Q&A clarifies several technical and administrative aspects of the generator replacement project: The existing generator specifications can be found in photos showing the nameplate; a portable generator will remain in place during removal/replacement and can be moved as needed; the 90-minute downtime refers specifically to power interruption time during cutover; both prime and subcontractors must submit OSHA 300A logs for the previous three years with the quotation package; a SCADA system is in place to monitor generator status; and NPS has a rental generator onsite that will remain until project completion. For questions about contractor licensing requirements (Class A General Engineering vs C-10 Electrical) and personnel experience requirements, bidders are directed to review Sections L and M of the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Pump Station 659 Generator, GOGA, newest first.
File Type Posted
B08_Attachment_6_Site_Visit_Sign_in_Sheet_140P8625Q0017_0001.pdf PDF
B08_Attachment_3_General_References.docx DOCX document
B08_Attachment_1_Statement_of_Work.pdf PDF
B03_Attachment_5_Wage_Determination_CA20250018.pdf PDF
Sol_140P8625Q0017.pdf PDF
B08_Attachment_2_Quote_Price_Sheet.xlsx XLSX spreadsheet
B08_Attachment_4_Tech_Info_Form___Past_Performance.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P8625Q0017 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PPG

San Francisco CA 94123 Building 201, Fort Mason

NPS, PWR - GOGA MABO

02/25/20250001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/12/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 0001 is to provide answers to questions posed by interested contractors and to add Attachment 6, Site Visit Sign-In Sheet.

Question 1:

Do you have the generator specifications? Is it a DC generator?

Answer:

Please review the Statement of Work which has specifications and photos. The generator nameplate is in a photo, so you can look up all specifications of the existing generator based on the nameplate.

Question 2:

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Quinn Rankin

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P8625Q0017/0001

I noticed in the pictures provided it looks like there is an electric generator attached to the building. Will this generator still be in place while the generator inside the building is being removed and replaced?

Answer:

Yes, the "portable" generator will be in place during removal/replacement of perm generator. It can be moved around out of the way for access.

The leads are long enough to allow for that.

Question 3:

Does the 90-minute downtime include removal, reinstall, and testing the newly installed generator?

Answer:

The 90-minute downtime refers to, not being with power for 90 minutes. If land power is stable usually with good weather this should not be a problem. The sewage pumps run on PG&E land power

99% of the time until an outage. The 90-minute window refers to a cut over time, that really can and should be easily avoided with stable primary land power.

Question 4: Does a Contractor with Class A

General Engineering bid this job as a general without having a C-10 Electrical subcontractor?

Answer: Please refer to both Sections L and M in the solicitation.

Question 5: Can the personnel experience be used in lieu of the firm experience for the similar projects?

Answer: Please refer to both Sections L and M in the solicitation.

Question 6: In the solicitation document, it mentions submitting OSHA 300A logs for the previous three (3) calendar years, as well as a

California Contractor State License. I wanted to confirm whether submitting the subcontractor¿s documents would suffice, or if we, as the prime contractor, are also required to submit them.

Answer: OSHA 300A Logs need to be submitted for both the prime and subcontractor with the quotation package.

Question 7: If the prime contractor is required

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P8625Q0017/0001 to submit the [OSHA 300A] documents, do they need to be provided at the time of the bid submission, or can they be submitted at the time of contract award?

Answer: All documents need to be submitted by the quotation due date and time.

Question 8: Is there SCADA or BMS?

Answer: A SCADA system is in place and monitors generator status.

Question 9: Do we need a rental generator?

Answer: No, NPS currently has a rental onsite that will remain until project completion.