Sol_140P8625Q0006_Amd_0002.pdf
PDF 93 KB Posted
- Attached to
- Replace Windows Building 1199 - GOGA Federal contract opportunity
- Solicitation number
- 140P8625Q0006
About this file
This is Amendment 0002 to solicitation 140P8625Q0006, providing answers to contractor questions regarding window replacement work at Building 1199 for the National Park Service's Golden Gate National Recreation Area (GOGA) in San Francisco. The amendment clarifies that the windows requiring replacement are currently covered in plywood and can be identified by size according to specifications in Attachment 1. Key details include: glass must be tempered; privacy film is required on kitchen windows (grey to match existing); both the transaction window and second inner glass need replacement; the building will remain occupied during construction though staff can be relocated; paint color should match interior frames and surrounding weathered areas for uniformity; and regarding the 13-14 week lead time for replacement sashes that exceeds the 60-day performance period, NPS will issue a separate notice to proceed for materials. The transaction window replacement is specified as glass-only, with no specific brand requirement as long as specifications are met, including both a sliding window component and interior glass window.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8625Q0006_Amd_0001.pdf | ||
| Att_8_Site_Visit_Sign_In_Sheet_140P8625Q0006_0001.pdf | ||
| Att_2_Construction_Drawing_140P8625Q0006.pdf | ||
| Sol_140P8625Q0006.pdf | ||
| Att_4_Map_140P8625Q0006.pdf | ||
| Att_3_Photos_140P8625Q0006.pdf | ||
| Att_1_Project_Specifications_140P8625Q0006.pdf | ||
| Att_5_General_References.docx | DOCX document | |
| Att_6_Tech_Info_Form___Past_Performance.docx | DOCX document | |
| Att_7_Wage_Determination_20250018_1-10-25.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P8625Q0006 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PPG
San Francisco CA 94123 Building 201, Fort Mason
NPS, PWR - GOGA MABO
02/24/20250002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
02/03/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 0002 is to provide additional answers to questions posed by interested contractors; no further questions will be taken.
Question 1: Are the sashes or Insulated Glass Units that need to be replaced marked or labeled already?
Answer: The windows are covered in plywood, so you should be able to tell which ones you are looking for based on the size. Please see Attachment 3 Photos as there are photos with window dimensions. Look at Attachment 1 Project Specifications section 01 11 00 Summary of
Work section 1.2 B 1 for details on which sizes need sash replacement.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Quinn Rankin
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8625Q0006/0002
Question 2: Should the glass be tempered?
Answer: Yes.
Question 3: Do you want the privacy film on the windows in the kitchen? (All windows except three large windows)
Answer: Yes, grey to match the others in the area is okay.
Question 4: Do you want the transaction window replaced?
Answer: Yes, both the transaction window and the second inner glass need to be replaced.
Question 5: Will the building be occupied during construction?
Answer: Yes, but staff can be re-located depending on desk space and if it would interfere with construction.
Question 6: The original exterior finish color was a custom color called "Arctic Silver". This color is no longer offered. We asked a company for the added cost of a "custom color" to match.
However, where would we get an original sample of the "Arctic Silver" color? The existing windows finish is oxidized and weathered 15 years on.
Additionally, we doubt any new paint is going to match the adjacent frame(s) due to weathering.
What to do?
Answer: Color match to the interior frames as close as possible. For paint, color should match the surrounding area, even if it is weathered so everything looks uniform.
Question 7: A company quoted us a 13¿14-week lead-time for the 3 replacement sashes. This exceeds the 60-day performance period from the
NTP date. What to do?
Answer: We would do a notice to proceed on materials that would not be included in the construction period of performance. Please provide estimated lead time.
Question 8: Do you have a ¿brand name¿ or specification for the new transactions window? Or do we assume replacing the glass only at the existing transaction window framing and note the entire transaction window assembly? Please let us know.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8625Q0006/0002
Answer: The transaction window is glass-only replacement; it does not need to be a specific brand name as long as it meets the specifications. We want to replace in kind, but do not restrict specific brands. For the transaction window, there is a sliding window part and an interior glass only window as well, so it is more than one part. We are open to ideas as to the best way to replace this.