This is Amendment 0001 to solicitation 140P8625Q0006, issued by the National Park Service Pacific West Region - Golden Gate National Recreation Area (GOGA MABO) in San Francisco, providing answers to contractor questions and adding Attachment 8 (Site Visit Sign-In Sheet).

The amendment clarifies several technical requirements for the window replacement project: the windows needing replacement are currently covered in plywood and can be identified by size per Attachment 3 Photos and specifications; the glass must be tempered; privacy film is required on kitchen windows (except three large windows) in grey to match existing; both the transaction window and second inner glass need replacement. The building will remain occupied during construction, though staff can be relocated as needed to accommodate construction work. The amendment is effective 02/20/2025, with offers due 02/03/2025.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Windows Building 1199 - GOGA, newest first.
File Type Posted
Sol_140P8625Q0006_Amd_0002.pdf PDF
Att_8_Site_Visit_Sign_In_Sheet_140P8625Q0006_0001.pdf PDF
Att_2_Construction_Drawing_140P8625Q0006.pdf PDF
Sol_140P8625Q0006.pdf PDF
Att_4_Map_140P8625Q0006.pdf PDF
Att_3_Photos_140P8625Q0006.pdf PDF
Att_1_Project_Specifications_140P8625Q0006.pdf PDF
Att_5_General_References.docx DOCX document
Att_6_Tech_Info_Form___Past_Performance.docx DOCX document
Att_7_Wage_Determination_20250018_1-10-25.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P8625Q0006 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PPG

San Francisco CA 94123 Building 201, Fort Mason

NPS, PWR - GOGA MABO

02/20/20250001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/03/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 0001 is to provide answers to questions posed by interested contractors and to add Attachment 8, Site Visit Sign-In Sheet.

Question 1: Are the sashes or Insulated Glass Units that need to be replaced marked or labeled already?

Answer: The windows are covered in plywood, so you should be able to tell which ones you are looking for based on the size. Please see Attachment 3 Photos as there are photos with window dimensions. Look at Attachment 1 Project Specifications section 01 11 00 Summary of

Work section 1.2 B 1 for details on which sizes need sash replacement.

Question 2: Should the glass be tempered?

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Quinn Rankin

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P8625Q0006/0001

Answer: Yes.

Question 3: Do you want the privacy film on the windows in the kitchen? (All windows except three large windows)

Answer: Yes, grey to match the others in the area is okay.

Question 4: Do you want the transaction window replaced?

Answer: Yes, both the transaction window and the second inner glass need to be replaced.

Question 5: Will the building be occupied during construction?

Answer: Yes, but staff can be re-located depending on desk space and if it would interfere with construction.