This document provides specifications for an asphalt paving project at the Cheseboro Canyon Trail Head. The project involves paving approximately 15,012 square feet of unpaved road between two parking lots to mitigate health and safety issues from windblown dust. Work must be completed in one day and includes traffic control, laying a 4-inch compacted hot mix asphalt in two lifts, and rolling and edging the asphalt. Bidders are required to visit the job site and submit equipment lists, schedules, and an accident prevention plan. The preconstruction meeting agenda and submittal requirements are also outlined. The National Park Service solicitation number for this opportunity is 140P8624Q0006.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 10 00 - 1

General Requirements

OVERHEAD

SECTIONAL

DOORS

SAMO

CHESEBORO PAVING

DIVISION 1 DOCUMENT

SECTION 01 10 00

GENERAL REQUIREMENTS

PART 1 - DESCRIPTION OF WORK

1.1 BACKGROUND: Historically in the past, the Cheseboro Trail Head parking lot road was paved. Recently construction was performed to improve storm water control and the lot and road were reconstructed without paving. This unpaved road has led to numerous health and safety complaints from adjacent neighbors about their health due to wind and vehicles kicking up dust and blowing the dust into their houses. The park has agreed this has become an issue and has agreed to pave the section of road from parking lot to parking lot to mitigate these health and safety issues.

1.2 The goal of this project is to pave the section of road from the lower lot parking delineator curb approximately 10 feet below lower gate to the upper lot “y” intersection which is a total of 15,012 square feet. (See SOW map).

1.3 The contractor will be performing traffic controls of asphalt trucks and laying a hot mix asphalt overlay. Asphalt paving will consist of a total of 4” compacted hot mix asphalt in two lifts (bottom lift 2 ½” of ¾” asphalt and cap of 1 ½” of ½” asphalt).

Asphalt will be rolled as shall the edges.

1.4 All work will be performed under a single contract and completed in 1 day.

PART 2 - EXISTING UTILITIES

2.1 There should be no need for any excavation during this project or utility location.

However, all locates will be the responsibility of the contractor.

PART 3 - CONTRACTOR’S USE OF PREMISES

3.1 ON-SITE WORK HOURS: Work shall be generally performed during normal business working hours of 7 a.m. to 6 p.m., Monday through Thursday, except when otherwise indicated.

3.2 CONSTRUCTION CAMP: N/A

3.3 STORAGE – STAGING AREAS: N/A

3.4 PRESERVATION OF NATURAL FEATURES: N/A

3.5 HAULING RESTRICTIONS: Contractor responsible for traffic controls.

3.6 HOUSEKEEPING:

A. Keep project neat, orderly, and in a safe condition always. Store and use equipment, tools, and materials in a manner that does not present a hazard. Immediately remove

RFQ 140P8624Q0006

Section J - Att No. 002

01 10 00 - 2

OVERHEAD

SECTIONAL

DOORS

SAMO

CHESEBORO PAVING

DIVISION 1 DOCUMENT

all hazardous rubbish. Do not allow rubbish to accumulate. Provide onsite containers for collection of rubbish and dispose of it at frequent intervals during progress of work which will include grease cartridges, rags or other materials used to maintain the equipment.

B. Dispose of waste materials legally using park trash receptacles which will include food waste, wrappers, bottles and cans used for personal consumption of workers during their workday.

PART 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION

4.1 The Contractor shall commence work within 30 calendar days after the date of receipt of the "Notice to Proceed." The Contractor Shall Complete this job in 1 day.

PART 5 - EXAMINATION OF THE SITE

5.1 All quoters are urged to visit the job site and examine existing conditions before submitting quotes. All quoters will be held to have the same knowledge concerning the site and the on-ground conditions as if they had inspected the job site.

PART 6 - ABBREVIATIONS

6.1 The following list of abbreviations, which may be used in the Construction Specifications or Special Provisions, refer to the organizations and specifications of the organizations listed below:

AASHTO - American Association of State Highway and Transportation Officials

ACI - American Concrete Institute

AISC - American Institute of Steel Construction

AI - Asphalt Institute

ANSI - American National Standards Institute

ASTM - American Society for Testing and Materials

AWWA - American Water Works Association

Caltrans- State of California Department of Transportation

FHWA - Federal Highway Administration

FS - Federal Specifications

MSHA - Mine Safety and Health Administration

MUTCD - Manual on Uniform Traffic Control Devices

NEC - National Electric Code

NEMA - National Electrical Manufacturers Association

NFPA - National Fire Protection Association

NIOSH - National Institute of Occupational Safety and Health

NPS - National Park Service

NSF - National Sanitation Foundation

OSHA - Occupational Safety and Health Administration

PCA _ Portland Cement Association

UBC - Uniform Building Code

UL - Underwriters Laboratories, Inc.

01 10 00 - 3

OVERHEAD

PART 7 - ACCIDENT PREVENTION

7.1 DESCRIPTION: The work of this section consists of establishing and implementing an effective accident prevention program and providing a safe environment for all personnel and visitors.

7.2 SUBMITTALS:

A. ACCIDENT PREVENTION PROGRAM: At the preconstruction conference submit for approval an accident prevention program. The program shall include:

1. Name of responsible supervisor to carry out the program.

2. First aid procedures.

3. Training, both initial and continuing.

4. Planning for possible emergency situations.

5. Contractor to identify nearest location of medical facility for emergencies.

6. Recognition that work will be performed in remote areas with limited communication or cell phone coverage.

B. MEETING AND INSPECTION REPORTS: Submit a report of safety meetings and of inspections.

7.3 QUALIFICATIONS OF EMPLOYEES:

A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner.

B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.

C. Operators of vehicles, mobile equipment, hoisting equipment, and hazardous plant equipment shall be able to understand signs, signals, and operating instructions, and be capable of operating such equipment. Provide operating instructions for all equipment.

D. Newly hired operators shall be individually tested by an experienced operator or supervisor to determine if they are capable of safely operating equipment.

7.4 ACCIDENT REPORTING: The Contractor shall report all accidents to the Contracting

Officer as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.

7.5 FIRST AID FACILITIES: Provide adequate facilities for the number of employees and the type of construction at the site.

7.6 PERSONNEL PROTECTIVE EQUIPMENT: Meet requirements of NIOSH and MSHA, where applicable, as well as ANSI.

7.7 EMERGENCY INSTRUCTIONS: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at

01 10 00 - 4

OVERHEAD

the work site.

7.8 PROTECTIVE EQUIPMENT:

A. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.

B. It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.

7.9 SAFETY MEETINGS: As a minimum, conduct 15 minute "toolbox" safety meetings.

These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite.

7.10 HAZARDOUS MATERIAL ACTION: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate, if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with guidelines established by federal, state and local regulations, and as outlined within the operator's Safety or Hazardous Materials

Business Plan.

A. If a spill, leak or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the National Park Service Emergency Dispatch.

PART 8 - PRECONSTRUCTION CONFERENCE:

8.1 PRECONSTRUCTION CONFERENCE: Before start of construction, Contracting

Officer will arrange an on-site meeting with Contractor. The meeting agenda will include the following:

Roles and Responsibilities

Key Personnel

National Park Service regulations

Documents required under the contract

Subcontractors

Labor standards provisions

Modifications

Payments to Contractor

Payroll reports

Technical Issues

Correspondence procedures

Acceptance/Rejection of Work

Construction Meetings

Submittal of shop drawings, project data, and samples

Accident prevention program (including name of responsible supervisor)

Accident reporting

Safety program (compliance with the "Accident Prevention" clause of the General

Provisions)

Spill Response Plan

01 10 00 - 5

OVERHEAD

Saturday, Sunday, holiday and night work

Contract Time

Tentative construction schedule

Notice to Proceed

PART 9 - SUBMITTALS

9.1 DESCRIPTION: The work of this section consists of submittal requirements before and during construction.

9.2 Equipment: Asphalt Paver, Large Dump Trucks and Vehicles

Shop Drawings: Not Applicable (N/A)

Product Data: Provide construction equipment and vehicles to be used for this project.

Samples: N/A

A. For submittals specified above, forward submittals to Contracting Officer at least

15 days before need for approval.

B. After approving submittals, Contracting Officer will return one copy to the

Contractor.

C. If submittals are not approved, Contracting Officer will return all copies to

Contractor with reasons for rejection. Resubmit, identifying changes.

D. Any work done before approval shall be at Contractor's own risk.

9.3 APPROVED EQUALS: A request for approval constitutes a representation that

Contractor:

A. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

B. Will provide the same warranties for the proposed item as for the item specified.

C. Has determined that the proposed item is compatible with interfacing items.

D. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

E. Waives all claims for additional expenses that may be incurred as a result of the substitution.

9.4 PROGRESS SCHEDULES: As soon as possible after Notice of Award and before beginning any work, submit Progress Schedule. Contracting Officer will review the

Progress Schedule for format and content. Submit four copies of Progress Schedule

(normally in bar chart form) showing estimated starting and completion dates for each part of the work. The first progress payment will not be issued until an acceptable

01 10 00 - 6

OVERHEAD

progress schedule is submitted.

PART 10 - TEMPORARY SERVICES

10.1 DESCRIPTION: The work of this section consists of providing temporary services required for Contractor's performance of the work of this Contract.

10.2 FIRE PREVENTION AND PROTECTION:

A. Hazard Control: Take all necessary precautions to prevent fire during construction.

Provide adequate ventilation during use of volatile or noxious substances.

PART 11 - PROJECT CLOSEOUT

11.1 DESCRIPTION: The work of this section consists of final cleanup, closeout submittals, final inspection procedures, and safety precautions.

11.2 CLEANING: Remove all tools, equipment, surplus materials, and rubbish. At time of final inspection, project shall be thoroughly clean and ready for use.

11.3 SUBSTANTIAL COMPLETION AND FINAL INSPECTION: Submit written certification that project is substantially complete, and a final inspection is requested.

Contracting Officer will make an inspection within 10 days of receipt of request.

A. When Contracting Officer determines that the work is substantially complete; he will prepare a list of deficiencies (“Punch List”) to be corrected before final acceptance and issue a Letter of

B. Substantial Completion.

C. If Contracting Officer determines that the work is not substantially complete; he will immediately notify Contractor in writing, stating reasons. After completing work, Contractor shall resubmit certification and request a new final inspection.

11.4 ACCEPTANCE OF THE WORK: After all deficiencies have been corrected, a Letter of

Acceptance will be issued. A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.

END OF SECTION