Section_J_-_Att_No__001_SOW.pdf

PDF 834 KB Posted

Attached to
CHESEBORO CANYON TRAIL HEAD ASHPALT PAVING
Solicitation number
140P8624Q0006
Issued by

About this file

This scope of work document outlines requirements for asphalt paving services at the Cheseboro Canyon Trailhead located in Agoura Hills, California. The National Park Service seeks a contractor to install approximately 15,012 square feet of 4-inch compacted hot mix asphalt in two lifts over an existing aggregate base. Work must be completed within 30 days of notice to proceed and is subject to prevailing wage requirements. The contractor will furnish all labor, materials and equipment to remove debris, pave and roll the asphalt, complete repairs as needed, and maintain a clean worksite. The period of performance is 30 days and work may only occur weekdays between 8am and 5pm. The solicitation number for this opportunity is 140P8624Q0006.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAMO – Cheseboro Canyon Trail Head Asphalt Paving

Scope of Work

Part 1: General Information

A. Introduction

The purpose of this SOW is to perform 15,012 sq. ft. of asphalt paving at our Cheseboro

Canyon Trailhead location.

B. Background

The Cheseboro trailhead is located at 5792 Chesebro Rd, Agoura Hills, CA 91301. The property was acquired by the NPS in the early 1980’s and has recently been rehabilitated with a fine graded Class II Road base aggregate. Due to the proximity of neighbors this road’s dust poses a potential health hazard to the neighboring community.

C. Scope

The overall project purpose is to install an asphalt pavement overlay at said location to mitigate dust to the neighboring community.

Asphalt paving will consist of a total of 4” compacted hot mix asphalt in two lifts (bottom lift

2 ½” of ¾” asphalt and cap of 1 ½” of ½” asphalt). Asphalt will be rolled as shall the edges.

Asphalt installation will start approximately 10 feet below lower gate at parking delineator curb and end at the beginning of the upper lot “Y” which is a total of 15,012 square feet.

NOTE: Google Earth image is not current as road is fine graded CMB II not asphalt as picture indicates.

RFQ 140P8624Q0006

Section J - Att No. 001

The contractor will furnish labor, services, materials, and equipment to complete the scope of work in accordance with the specifications listed above.

Part 2: Work Requirements

A. Technical Requirements

The contractor must be licensed to provide paving services in the State of California. All work shall be completed in accordance with current Federal and State Building Codes.

The contractor is responsible for taking their own measurements, dimensions, and quantity of materials required to complete the job.

The contractor will be responsible for removing and disposing of any debris generated during the workday.

The contractor shall immediately notify the Contracting Officer of any ambiguities, inconsistencies, and errors discovered in this specification.

The contractor shall provide to the Contracting Officer a list of all Sub-Contractors, if any, prior to the commencement of work.

All work is subject to “Davis-Bacon” prevailing wage and will be performed Monday through

Friday, no earlier than 8:00 a.m.

Contractor shall take every precaution to prevent damage to government and personal property and vegetation at the sites. Should any damage result, the contractor shall complete repairs or replacement to the satisfaction of the COR, at no cost to the government.

Storage of materials and equipment shall be limited to areas designated by the COR during contractor’s operations. The contractor is responsible for daily clean-up.

The site will be closed to the public during installation and recommended asphalt setting time.

B. Deliverables

The contractor shall provide a written schedule within 5 days after award. The contractor shall complete work within 30 days of Notice to Proceed.

Part 3: Supporting Information

A. Security

Contractor shall take all precautions to protect the public and all property during performance under this contract. The contractor will ensure the site is secure from public entrance during installation. The contractor shall coordinate work schedules and locations with the Contracting Officer’s Representative (COR) and shall erect barricades and appropriate signs while working to prevent harm to persons and property.

The contractor shall be responsible for maintaining an effective accident prevention program and providing a safe environment for all personnel and visitors. The contractor shall ensure that work is accomplished in compliance with Federal, State, and local safety and health requirements. The contractor shall comply with all OSHA requirements.

B. Place of Performance

National Park Service

Cheseboro Canyon Trailhead

5792 Chesebro Road

Agoura Hills, CA 91301

C. Period of Performance

The period of performance for this contract is 30 days after the Notice to Proceed.

All work shall be scheduled for weekdays (Monday-Friday) between 8:00 a.m. and 5:00 p.m.

D. Special Considerations

No NPS equipment will be provided.

File details come from the government source that posted it. Updated .