140P8622Q0029_-_ATTACHMENT_04_-_Sculptural_Elements_2020_02_21_FOPO_FINAL_-_DRAWINGS_-_FOPO_EXHIBITS.pdf
PDF 3 MB Posted
- Solicitation number
- 140P8622Q0029
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fort Point National Historic Site San Francisco, California
Submission Date: FEBRUARY 21, 2020
PRODUCTION DOCUMENTS II - DRAWINGS PACKAGE
SDII DDI Draft / DDI comprehenSIve pD1 pDIISDI DDII PDII
* PLEASE NOTE: All graphics shown throughout drawings package should be considered fpo only; please see graphics package for final graphic layouts
P R O J E C T:
Fort Point National Historic Site | San Francisco, California
D R AW I N G S :S C A L E :P H A S E :
Production Documents II February 21, 2020
1n/a Table of Contents, Goals, and Next Steps
CONTENTS OF THIS DOCUMENT
Table of Contents, Purpose and Contents, Next Steps, and Goals Park Location Existing Conditions .............................. 3-4 Anticipated Visitor Flow Color / Materials Wayfinding Signage Opportunities 7-8 Areas 01.00 + 02.00 ............................9-21 Areas 03.00-05.00 ............................ 22-44 Area 06.00 .......................................... 45-59 Area 07.00 + 08.00 ........................... 60-65 Area 09.00 .......................................... 66-69 Electrical and AV + Lighting ......... 70-79 Project Schedule
Park Location
N
N
P R O J E C T:
Fort Point National Historic Site | San Francisco, California
D R AW I N G S :S C A L E :P H A S E :
Production Documents II February 21, 2020
PARK LOCATION
n/a
Fort Point National Historic Site is located at the south anchorage of the Golden Gate Bridge at the end of Marine Drive on the Presidio of San Francisco.
FLOOR PLAN1
Scale:1” = 20’-0” 0 5’ 10’ 15’ 20’N
FLOOR PLAN1
Scale:1” = 20’-0” 0 5’ 10’ 15’ 20’N
1” = 20’ Floor Plan
ELECTRICAL CLOSET
(THIS WILL BE RETAINED);
OUTSIDE TO BE PAINTED BY
FABRICATOR
WOULD RECOMMEND PARK
PAINT OUT DARK CONDUIT TO
MATCH/BLEND WITH LIGHTER
BRICK WALLS IN THIS AREA
WOULD RECOMMEND PARK PAINT
OUT DARK CONDUIT COMING OUT
OF WINDOW TO MATCH/BLEND WITH
LIGHTER BRICK WALLS
PARK TO REPLACE
WINDOW GLASS
AND FRAME
UNSURE OF WINDOW
“QUALITY” BEHIND PANEL;
TDM WILL ADD GRAPHIC
IMAGE TO COVER
WOOD FLOOR (NOT
HISTORIC) IN MAGAZINES
SALLY
PORT
GUARD
ROOM
MAGAZINE 1
MAGAZINE 2
MAG 3
CASEMATE 1
CASEMATE 2
CASEMATE 3
CASEMATE 4
CASEMATE 5
CASEMATE 6
CASEMATE 7
CASEMATE
CASEMATE
CASEMATE
WEST BASTION
GENERAL NOTES:
• EXHIBITS CAN ATTACH TO MORTAR OF BRICK (WITH
APPROPRIATE APPROVALS), BUT PREFERENCE IS TO MAKE
EXHIBITS FREESTANDING WHEN POSSIBLE
• CAN ATTACH TO FLOORS (WITH APPROPRIATE APPROVALS)
ONLY IN MAGAZINES 1 + 2
• NO AREAS WILL BE CLOSED OFF AND CONDITIONED
• TWO ARTIFACT CASES WILL HAVE LOCALIZED ACTIVE
CLIMATE CONTROL SYSTEMS
• EXHIBIT MATERIALS SHOULD WITHSTAND SALT AIR, WATER,
AND OUTDOOR CONDITIONS AS BEST AS POSSIBLE
• PARK WILL BE UPGRADING ELECTRICAL AND LIGHTING
UNDER A SEPARATE CONTRACT (TBD)
• CURRENT EXHIBITS WILL BE REMOVED BY PARK PRIOR
TO INSTALLATION
• ALL BENCHES WILL BE PROVIDED BY THE PARK (HOWEVER,
PLACEMENT WILL BE NOTED IN DRAWINGS PACKAGE)
P R O J E C T:
Fort Point National Historic Site | San Francisco, California
D R AW I N G S :S C A L E :P H A S E :
Production Documents II February 21, 2020
EXISTING CONDITIONS
FLOOR PLAN1
Scale:1” = 20’-0” 0 5’ 10’ 15’ 20’N
FLOOR PLAN1
Scale:1” = 20’-0” 0 5’ 10’ 15’ 20’N
FLOOR PLAN1
Scale:1” = 20’-0” 0 5’ 10’ 15’ 20’N
Wall Elevations
'-3
/8
'-6
/4
'-6
/4
’-6
/4
’-3
/8
’-6
/4
N
P R O J E C T:
Fort Point National Historic Site | San Francisco, California
D R AW I N G S :S C A L E :P H A S E :
Production Documents II February 21, 2020
4n/a
EXISTING CONDITIONS: ELEVATIONS
CASEMATES 1-3
MAGAZINE 2
MAGAZINE 1
Floor Plan
ENTRANCE
FLOOR PLAN1
Scale:1” = 20’-0” 0 5’ 10’ 15’ 20’N
1” = 20’
SALLY
PORT
GUARD
ROOM
MAGAZINE 1MAGAZINE 2
MAG 3
CASE
MATE
CASE
MATE
CASE
MATE
CASE
MATE
CASE
MATE
CASE
MATE
CASEMATE 7
CASEMATE
CASEMATE
CASEMATE
WEST
BASTION
N
P R O J E C T:
Fort Point National Historic Site | San Francisco, California
D R AW I N G S :S C A L E :P H A S E :
Production Documents II February 21, 2020
ANTICIPATED VISITOR FLOW
KEY
ANTICIPATED VISITOR FLOW
ANTICIPATED FLOW FOR
THEATER EXPERIENCE
POWDER-COATED ALUMINUM
GLASS FOR MAIN PANELS + INTRO PANELS
PAINT COLORS
GLASS FOR INTRO PANELS (SITS IN FRONT OF M5)
GRANITE STONE CONCRETE“CORTEN” STEEL (FAUX)
Drylac 039/80005 Black
Water white non-glare glass with frosted vinyl (with weeded out words) on back side and direct print words on front side
Water white non-glare glass with direct printed image on back side All materials should uphold the highest standards of durability due to the environment, and require minimal maintenance.
Please see physical board provided at meeting for actual colors.
BENJAMIN MOORE
2155-30 “YELLOW MARIGOLD”
BENJAMIN MOORE
2151-10 “MUSTARD OLIVE”
BENJAMIN MOORE
HC-66 “GARRISON RED”
Coloring should match existing stone (see reference above) For the full-size monochromatic figure in the space; if possible, we would like to make the sculpture take on a more organic, “stylized,” form, as is shown above.
• (typical intro panel) M3 pattern recessed into HPL
• (typical intro panel) M5/M6 glass assembly with M3 frame w/ light strip
• (02.02) typical M1 honeycomb pattern
• (01.01 and 03.05) hinge mechanisms
• (02.01) slider mechanism
• (04.06) archway building interactive
• (06.02) “pinball” interactive and back graphic lightbox assembly
• (07) title letters with backlit assembly
• (07) backlit lenticular graphic steelfxpatinas.com “Kor-10 Rust F/X Patina” on hot or cold rolled steel with mill scale removed and steel grinded until shiny (before applying patina paint); SprayMax 2K matte clear coat applied to finish
RECOMMENDED PROTOTYPES CREATED BY FABRICATOR (PARK TO FINALIZE)
P R O J E C T:
Fort Point National Historic Site | San Francisco, California
D R AW I N G S :S C A L E :P H A S E :
Production Documents II February 21, 2020
CONTENT OUTLINE
n/a Material Board
MATERIAL BOARD (see physical board)
M1 M3M2 M4
M5 M6
P7 P8 P9
BENJAMIN MOORE
2134-30 “IRON MOUNTAIN”
P6
BENJAMIN MOORE
HC-11 “MARBLEHEAD GOLD”
BENJAMIN MOORE
HC-138 “COVINGTON BLUE”
BENJAMIN MOORE
2146-30 “SPLIT PEA”
BENJAMIN MOORE
2155-40 “SEMOLINA”
BENJAMIN MOORE
2157-10 “GOLDEN DUNES”
P1 P2 P3 P4 P5
FLOOR PLAN - Signage Program
SCALE: 3/64" = 1'-0"
0 2 4 6 8 FT
N
P R O J E C T:
Fort Point National Historic Site | San Francisco, California
D R AW I N G S :S C A L E :P H A S E :
Production Documents II February 21, 2020
7Floor Plann/a
WAYFINDING SIGNAGE
USE EXISTING SIGN’S
HOLES
FABRICATOR TO CONSULT
WITH PARK OR TDM FOR
EXACT LOCATION
“EXHIBITS” VERTICAL SIGN USES
EXISTING POSTS TO HELP WITH
ATTACHMENT; SEE THE FOLLOWING
PAGE FOR MORE DETAILS
“THEATER” AND “BOOKSTORE” VERTICAL
SIGNS USES EXISTING POSTS TO HELP
WITH ATTACHMENT; SEE THE FOLLOWING
PAGE FOR MORE DETAILS
ATTACHED TO OPEN DOOR TO LEAD
VISITORS IN TO GUARDROOM
GENERAL NOTES:
BOTTOM OF SIGNS SHOULD BE
LOCATED AT 55” AFF UNLESS
OTHERWISE NOTED
SIGNS SHOULD ONLY ATTACH INTO
MORTAR, AND USE ANY EXISTING
HOLES IF POSSIBLE
GRAPHIC WRAPS AROUND COLUMN
GL-00.01-100 GL-00.01-110GL-00.01-105 GL-00.01-115
GL-00.00-100
GL-00.01-200
GL-00.01-300
GL-00.02-200
GL-00.02-100
N
P R O J E C T:
Fort Point National Historic Site | San Francisco, California
D R AW I N G S :S C A L E :P H A S E :
Production Documents II February 21, 2020
10Perspective Renderingn/a
AREA 01.00 (SALLY PORT)
ELEVATION - Sally Port North Wall - West Door Open Scale: 1/4" = 1'-0"
0 1 2 3 4 FT
TO
GUARD
ROOM
9'-11 3/8"
16'-0"
/2
ELEVATION - East Wall Scale: 1/4" = 1'-0"
27'-6"
2'-8 5/8" 3'-7"
4'-2"
ELEVATION - South Exterior Entrance - Doors Open Scale: 1/4" = 1'-0"
16'-0"
8'-9"
RIFLE
PORT
9'-1"
PROJECTION
ELEVATION - West Wall Scale: 1/4" = 1'-0"
27'-6"
3'-4 1/2"
PROJECTION
130" x 81"
WOULD RECOMMEND PARK PAINT
OUT CONDUIT COMING OUT OF
WINDOW TO MATCH LIGHTER BRICK
P R O J E C T:
Fort Point National Historic Site | San Francisco, California
D R AW I N G S :S C A L E :P H A S E :
Production Documents II February 21, 2020
11Scale: 1/4" = 1'-0" Content Wall Elevations
AREAS 01.00
GL-01.01-100
GL-01.01-200
GL-01.01-300/310
GL-01.01-400/410
GL-00.00-100
01.02 PROJECTION
TACTILE MODEL TODAYS EVENTS
(PROVIDED BY PARK)
WAYFINDING
CE-01.01-100
PLAN VIEW
Scale: 3/4" = 1'-0"
FRONT ELEVATION - Sallyport Tactile Exhibit Scale: 3/4" = 1'-0"
1 0 1 2 FT
SIDE ELEVATION
Scale: 3/4" = 1'-0"
ISOMETRIC VIEW
Flip Book Open
ISOMETRIC VIEW
Flip Book Closed
LEVELER HARDWARE ON
EACH LEG
EASE FRONT CORNERS
OF LEGS TO REMOVE
SHARP CORNERS
2" X 2" STEEL FRAME
POWDER COATED - M1
FLIP BOOK PANELS (2)
FLIP BEYOND 90
DEGREES TO STAY
UPRIGHT WHILE
READING BOTTOM FACE
OF PANEL. RUBBER
BUMPERS APPLIED
TO PANELS TO PROTECT
GRAPHICS IF PANELS
ARE DROPPED
3D BRONZE MODEL OF
EXTERIOR OF THE FORT
WITH ADULT FIGURE FOR
SCALE
HPL GRAPHIC BACK
PANEL
P R O J E C T:
Fort Point National Historic Site | San Francisco, California
D R AW I N G S :S C A L E :
As Noted
P H A S E :
Production Documents II February 21, 2020
12Detail Drawings
EXHIBIT 01.01: TACTILE SITE MODEL
FULL 3D BRONZE MODEL OF OUTSIDE
OF FORT; 3D BRONZE MODEL OF BUS
STANDS NEXT TO FORT MODEL TO
HELP DEMONSTRATE RELATIVE SCALE
FULL 3D BRONZE MODEL OF
OUTSIDE OF FORT AND 3D
BRONZE MODEL OF BUS
2X2 STEEL FRAME
POWDERCOATED M1
HPL UPRIGHT GRAPHIC WITH
DIE-CUT TOP; SEE GRAPHIC
FILE FOR CUTLINE
RUBBER BUMPERS ON EACH
FLIP PAGE ADDED FOR
PROTECTION
CE-01.01-100
GL-01.01-100
GL-01.01-200
GL-01.01-300/310
GL-01.01-400/410
Elevation - Sally Port Tactile Rail Scale: 1/2" = 1'-0"
0 1 2 FT
/1
/4
46"
Plan - Sally Port Tactile Rail Scale: 1/2" = 1'-0"
0 1 2 FT
50"
20"12 11/16"
2 9/16"
2"
FLIPPAGE TOMBSTONES
1/2" X 1 1/4" X 1 3/8" SOLID
ALUMINUM
MACHINED FOR PAGE BUSHINGS
DRILLED & TAPPED FOR
MOUNTING TO SUBDECK
POWDERCOATED
SCALE BUS MODEL
PIN MOUNTED TO RAIL TOP
SCALE MODEL OF FORT
Side - Sally Port Tactile Rail Scale: 1/2" = 1'-0"
0 1 2 FT
23"
21"
SECTION
Scale: 1 1/2" = 1'-0"
0 3 6 IN
BASE FRAME ASSEMBLY
2" SQ. STEEL TUBE
MITERED WHERE REQUIRED
WELDED / SANDED / PAINTED
W/ VARIOUS MOUNTING BRACKETS
FLIPBOOK PAGE ASSEMBLY
1/4" PVC CENTER SHEET
THRU BOLTED TO CHANNEL/ROD SPINE ASSEMBLY
W/ ZINC TACTILE PLATE PIN MOUNTED & GLUED TO TOP FACE
W/ HPL GRAPHIC LAMINATED TO BOTTOM FACE
ZINC & HPL EXTEND TO ENDS OF TABS
W/ RUBBER BUMPERS TO PROTECT BACK GRAPHICS
SPINE ASSEMBLY
1/2" X 1" ALUMINUM CHANNEL
DRILLED & CHAMFERED TO ATTACH PAGE
W/ 1/4" STEEL ROD SET INTO BOTTOM OF CHANNEL
POWDERCOATED
LOWER FIXED GRAPHIC
.064 ETCHED ZINC GRAPHIC
PIN MOUNTED & GLUED TO 3/4" SUBDECK
SUBDECK
3/4" PVC SHEET
SECURED TO ANGLE BRACKETS WELDED TO
FRAME
W/ SCREWS
LEVELERS @ BOTTOM
W/ RUBBER PADS
BACK GRAPHIC
HPL GRAPHIC ON 3/4" BLACK SINTRA
MOUNTED TO ANGLE BRACKETS
@ SIDE VERTICAL TUBES
W/ SCREWS
21"
/4
19" - TOP GRAPHIC
18 3/8" - MID GRAPHIC
/8
1 11/16"
22 3/4"
Detail - Page Tombstone Scale: Actual Size
8-32 TAPPED HOLES
@ BOTTOM FOR
SUBDECK MOUNT
BORED HOLE FOR ROD BUSHING
M1
M1
M1
M1
ALL CORNERS ON GRAPHIC PAGES
TO HAVE EASED EDSGE
P R O J E C T:
Fort Point National Historic Site | San Francisco, California
D R AW I N G S :S C A L E :
As Noted
P H A S E :
Production Documents II February 21, 2020
13Detail Drawings
EXHIBIT 01.01: TACTILE SITE MODEL
P R O J E C T:
Fort Point National Historic Site | San Francisco, California
D R AW I N G S :S C A L E :P H A S E :
Production Documents II February 21, 2020
GUARDROOM
guardroom
POWDER MAGAZINES
powder·magazines
LIVING QUARTERS
living·quarts
KITCHEN
guardroom
CASEMATES
guardroom
BASTION
guardroom
LIGHTHOUSE
san·francisco·bay
STAIRS
guardroom
CANON MOUNTS
canon·mounts
SAN FRANCISCO BAY
san·francisco·bay
SALLY PORT
PARADE
GROUND YOU ARE HERE
FORT POINT
#45·foot·bus
MAP LEGEND (1861)
map·legend·(1861)
#11 #22
#22
#55
#66
#66
#55
#1
#2
#3
#4
#5
#6
#6
FIRST TIER
parade ground you·are·here sally·port first·tier
THE BOTTOM LEVEL served as the
Fort’s only entrance through the sally port.
This level also includes areas for gunpowder storage and cannon mounts. The guard room located adjacent to the sally port allowed for soldiers on sentry duty to safely observe and defend the fort’s entrance. As weapons technology advanced, the fort’s brick walls and reinforced sally port doors provided less security and defense.
#0 #.25·mi
#7.6·meters·
25 FEET
7.6 METERS
North
45-FOOT BUS
#45·foot·bus
THE MIDDLE TWO TIERS of Fort Point housed different functions. During the fort’s military period, these levels held cannon mounts in enclosed casemates, quarters for officers and enlisted soldiers, storage rooms, and offices. During the Golden Gate Bridge’s construction, workers repurposed rooms as workspaces and offices, and a maze of wooden scaffolding enveloped the outside of the fort.
TIERS 2 & 3
barbette·(roof)
(AREA OPEN
TO PARADE
GROUND)
#55 #33
#44
#55 #66
#66
(area·open to·parade ground)
#0 #.25·mi
#7.6·meters·
25 FEET
7.6 METERS
North
PARADE
GROUND
BARBETTE
7#7 barbette parade ground
THE BARBETTE TIER is the open “roof” level of the fort. Cannon mounts have supported multiple types of artillery over the years to help protect San Francisco Bay and the city’s harbor. In 1863 the Lighthouse board changed the location of the lighthouse to the barbette tier to warn ships of the rocks at the southern entrance to the harbor.
#0 #.25·mi
#7.6·meters·
25 FEET
7.6 METERS
North
GUARDROOM
guardroom
POWDER MAGAZINES
powder·magazines
LIVING QUARTERS
living·quarts
KITCHEN
guardroom
CASEMATES
guardroom
BASTION
guardroom
LIGHTHOUSE
san·francisco·bay
STAIRS
guardroom
CANON MOUNTS
canon·mounts
SAN FRANCISCO BAY
san·francisco·bay
SALLY PORT
PARADE
GROUND YOU ARE HERE
FORT POINT
#45·foot·bus
MAP LEGEND (1861)
map·legend·(1861)
#11 #22
#22
#55
#66
#66
#55
#1
#2
#3
#4
#5
#6
#6
FIRST TIER
parade ground you·are·here sally·port first·tier
THE BOTTOM LEVEL served as the
Fort’s only entrance through the sally port.
This level also includes areas for gunpowder storage and cannon mounts. The guard room located adjacent to the sally port allowed for soldiers on sentry duty to safely observe and defend the fort’s entrance. As weapons technology advanced, the fort’s brick walls and reinforced sally port doors provided less security and defense.
#0 #.25·mi
#7.6·meters·
25 FEET
7.6 METERS
North
45-FOOT BUS
#45·foot·bus
Not to Scale Detail Drawings
EXHIBIT 01.01: TACTILE SITE MODEL FLIP PANELS
VIEW SHOWS ALL THREE PANELS FLAT ON READER RAIL SURFACE
VIEW SHOWS TOP TWO PANELS FLIPPED UP (NOT SHOWN), REVEALING GROUND FLOOR
TABS WITH BRAILLE DENOTE
FLOOR LEVEL; THEY PROTRUDE
BEYOND READER RAIL SURFACE
FOR MORE ACCESSIBLE LIFTING
CLEAR RUBBER
BUMPERS ON CERTAIN
FLIP PANELS
FIRST FLOOR TAB IS PART OF
THE BOTTOM PANEL; ALL OF
WHICH IS ETCHED ZINC
KEY WITH BRAILLE
(LETTERS ARE NOT
RAISED); REMAINS
STATIONARY AND IS
VISIBLE WITH ANY LAYER
OF FLOOR PLAN FLIPPED
BRONZE FULL MODEL OF FORT;
SEE CE PACKAGE FOR DETAILS;
ACTUAL FORT APPROX 340’
LONG X 52’ TALL
BRONZE BUS
TOP OF FLIP PANELS IS .064” ETCHED ZINC
TENTIRE PANEL SHOWN HERE
IS .064” ETCHED ZINC
CE-01.01-100
FLOOR PLAN1
Scale:1” = 20’-0” 0 5’ 10’ 15’ 20’N
N
P R O J E C T:
Fort Point National Historic Site | San Francisco, California
D R AW I N G S :S C A L E :P H A S E :
Production Documents II February 21, 2020
15Perspective Renderingn/a
AREA 02.00 (GUARDROOM)
ELEVATION - Guardroom North Wall Scale: 1/4" = 1'-0"1
0 1 2 3 4 FT
ENTRANCE
FROM
SALLYPORT
16'-0"
/8
ELEVATION - Guardroom East Wall Scale: 1/4" = 1'-0"
27'-6"
TO
SALLYPORT
ELEVATION - Guardroom West Wall Scale: 1/4" = 1'-0"
27'-6"
RECESS
IN WALL
ELEVATION - Guardroom South Wall Scale: 1/4" = 1'-0"
16'-0"
6'-0"
RIFLE PORT
9'-10"
FLOOR PLAN1
Scale:1” = 20’-0” 0 5’ 10’ 15’ 20’N
FLOOR PLAN1
Scale:1” = 20’-0” 0 5’ 10’ 15’ 20’N
FABRICATOR TO
PAINT ELECTRICAL
CLOSET OUTER
WALLS P6
MONOCHROMATIC STYLIZED
SOLDIER FIGURE M4
FLOOR PLAN1
Scale:1” = 20’-0” 0 5’ 10’ 15’ 20’N
FLOOR PLAN1
Scale:1” = 20’-0” 0 5’ 10’ 15’ 20’N
GL-02.01-310
P R O J E C T:
Fort Point National Historic Site | San Francisco, California
D R AW I N G S :S C A L E :P H A S E :
Production Documents II February 21, 2020
16Content Wall ElevationsScale: 1/4" = 1'-0"
AREA 02.00
GL-02.01-100
GL-02.01-200
GL-02.01-305
GL-02.01-405
GL-02.01-300
GL-02.01-400
GL-02.01-205 GL-02.01-210 GL-02.01-215
GL-02.02-100
GL-02.03-100
GL-02.04-100
GL-02.03-200
GL-02.01-105~135
EXISTING IPAD STANDEXHIBIT INTROORIENTATION VIDEOORIENTATION VIDEOBANQUETTE
BANQUETTETIMELINEBROCHURE RACK
ELECTRICAL CLOSET
CE-02.03-000
Scale:1” = 20’-0” 0 5’ 10’ 15’ 20’N
FLOOR PLAN1
Scale:1” = 20’-0” 0 5’ 10’ 15’ 20’N
FLOOR PLAN1
Scale:1” = 20’-0” 0 5’ 10’ 15’ 20’N
P R O J E C T:
Fort Point National Historic Site | San Francisco, California
D R AW I N G S :S C A L E :P H A S E :
Production Documents II February 21, 2020
26n/a
AREA 04.00 (MAGAZINE 2)
Perspective Rendering
ELEVATION - Magazine 2 South Wall Scale: 3/16" = 1'-0"
/4
16'-0 1/2" 16'-0"
0 1 2 3 4 FT
1'-4"7'-3"
ELEVATION - Magazine 2 West Wall Scale: 3/16" = 1'-0"
/8
/8
19'-0"
ELEVATION -Magazine 2 East Wall Scale: 3/16" = 1'-0"
18'-10 3/8"
ELEVATION - Magazine 2 North Wall Scale: 3/16" = 1'-0"
FLOOR PLAN1
Scale:1” = 20’-0” 0 5’ 10’ 15’ 20’N
FLOOR PLAN1
Scale:1” = 20’-0” 0 5’ 10’ 15’ 20’N
FLOOR PLAN1
Scale:1” = 20’-0” 0 5’ 10’ 15’ 20’N
FLOOR PLAN1
Scale:1” = 20’-0” 0 5’ 10’ 15’ 20’N
P R O J E C T:
Fort Point National Historic Site | San Francisco, California
D R AW I N G S :S C A L E :P H A S E :
Production Documents II February 21, 2020
27Scale: 3/16" = 1'-0" Content Wall Elevations
AREA 04.00
GL-04.01-100
GL-04.01-200/201
GL-04.01-205
GL-04.02-100
GL-04.03-100
GL-04.02-200
GL-04.03-200
GL-04.05-100
GL-04.05-200
GL-04.06-100GL-04.06-200
GL-04.07-100
GL-04.07-200
GL-04.08-100
04.04 TOUCHTABLE
04.04 TOUCHTABLE
CE-04.07-100
USE TWO SHELVES OF EXISTING POWDER
KEG FRAMES WITH BARRELS (19” X 87” EA.);
CREATE FRAMED WOOD PANEL IN CENTER
WITH VENEER PANEL STAINED TO MATCH
EXISTING WOOD FRAMES; HPL GRAPHIC
APPLIED TO VENEER PANEL
GL-04.06-110
ELEVATION - Magazine 3 East Wall Scale: 1/4" = 1'-0"
TO HALLWAY
12'-3 5/8"
/8
0 1 2 3 4 FT
ELEVATION - Magazine 3 South Wall Scale: 1/4" = 1'-0"2
TO
CASEMATES
ELEVATION - Magazine 3 West Wall Scale: 1/4" = 1'-0"3
FLOOR PLAN1
Scale:1” = 20’-0” 0 5’ 10’ 15’ 20’N FLOOR PLAN1
Scale:1” = 20’-0” 0 5’ 10’ 15’ 20’N
FLOOR PLAN1
Scale:1” = 20’-0” 0 5’ 10’ 15’ 20’N
P R O J E C T:
Fort Point National Historic Site | San Francisco, California
D R AW I N G S :S C A L E :
As Noted
P H A S E :
Production Documents II February 21, 2020
28Content Wall Elevations
AREA 05.00
GL-05.01-100
05.03 ARTIFACT CASE
GL-05.02-100
GL-05.01-200
PLAN VIEW
Scale: 3/4" = 1'-0"
FRONT ELEVATION - 04-05 Bridge Tactile Scale: 3/4" = 1'-0"
1 0 1 2 FT
ISOMETRIC VIEW
Scale: 3/4" = 1'-0"
.064 ETCHED ZINC TOP BACKED
WITH 1/2" MDF SUPPORTED BY
ANGLE FRAME UNDERNEATH
WITH SECURITY SCREWS
ROUND OFF FRONT CORNERS
OF METAL TABLE FRAME AND
FRONT LEGS TO REDUCE
SHARP CORNERS
HPL GRAPHIC PANEL
2" SQ. METAL FRAME WITH
POWDER COAT FINISH - M1
LEVELING FEET HARDWARE
ROUND OFF FRONT CORNERS
OF METAL TABLE FRAME AND
FRONT LEGS TO REDUCE
SHARP CORNERS
EXPIRED: Adlib Exponent Connector on INPDSCOSDOSVC
MAP LEGEND map·legend
#0 #.25·mi·
#20·meters N north
50 FEET
20 METERS
#1
#1
#2
#4
#3
Fort Point fort·point
Fort Point Wharf fort·point·wharf
East Battery east·battery
West Battery west·battery
#5
Lighthouse Keeper’s Homes lighthouse·keeper's·homes
Water water
#2
#4
#3
#5
PLAN VIEW
Scale: 3/4" = 1'-0"
ISOMETRIC VIEW - 04.07 Grounds Tactile Scale: 3/4" = 1'-0"
HPL GRAPHIC PANEL
2" SQ. METAL FRAME WITH
POWDER COAT FINISH - M1
LEVELING FEET HARDWARE
HPL GRAPHIC PANEL
2" SQ. METAL FRAME WITH
POWDER COAT FINISH - M1
(SEE TYPICAL TABLE DETAIL)
BRONZE MODEL AND KEY OF FORT
IN LATE 1800S SHOWING LOCATION
OF LIGHTHOUSE KEEPER HOMES,
LIGHTHOUSE, SUTLER STORE, AND
SOLDIER'S QUARTERS
P R O J E C T:
Fort Point National Historic Site | San Francisco, California
D R AW I N G S :S C A L E :
As Noted
P H A S E :
Production Documents II February 21, 2020
36Detail Drawings
EXHIBITS 04.05 + 04.07: MAGAZINE TACTILE TABLE
FLOOR PLAN1
Scale:1” = 20’-0” 0 5’ 10’ 15’ 20’N
FLOOR PLAN1
Scale:1” = 20’-0” 0 5’ 10’ 15’ 20’N
04.05 04.07
GRAPHIC KEY
IS .064” ETCHED
ZINC
(EXAMPLE OF BRONZE SITE MODEL)
GRAPHIC SHOWN IS FOR REFERENCE ONLY; THIS
WILL BE A BRONZE MODEL
EXPLORING THE GROUNDS
TACTILE TABLE: GOLDEN GATE BRIDGE
WITH FORT
CE-04.07-100
GL-04.05-200
GL-04.05-100
GL-04.07-100
GL-04.07-200
File details come from the government source that posted it. Updated .