Sol_140P8524R0007_Amd_0007.pdf

PDF 118 KB Posted

Attached to
SEKI REHAB CEDAR GROVE PRIMARY WWTP
Solicitation number
140P8524R0007
Issued by

About this file

This document is an amendment to Solicitation 140P8524R0007 for the rehabilitation of the Cedar Grove Wastewater Primary Treatment Plant in Kings Canyon National Park. The amendment includes updates to the technical specifications, drawings, and wage determination, as well as additional questions and answers. Key details are:

The solicitation closing date has been extended from August 7, 2024 to August 15, 2024 at 12:00 pm PDT. The construction magnitude is $1,000,000 to $5,000,000, and the procurement is set-aside for Small Businesses. The North American Industry Classification System (NAICS) code is 236220 with a $45.0 million small business size standard. The National Park Service is the issuing agency for this requirement. The period of performance is July 8, 2024 to October 31, 2024.

View the file

Other files

File Type Posted
SEKI_200843_T3_Dwg_22x34_FINAL_7-30-24_(flattened)_Part5_0007.pdf PDF
SEKI_200843_T3_Dwg_22x34_FINAL_7-30-24_(flattened)_Part2_0007.pdf PDF
SEKI_200843_T3_Dwg_22x34_FINAL_7-30-24_(flattened)_Part4_0007.pdf PDF
Amendment_7_attachment_9_Cedar_Grove_Primary__WWTP-Questions_and_Answers_FINAL_0007.docx DOCX document
Attachment_4_Wage_Determination_CA20240018_7-26-24_0007.pdf PDF
SEKI_200843_T3_Dwg_22x34_FINAL_7-30-24_(flattened)_Part1_0007.pdf PDF
Amendment_7_attachment_8_INDEX_OF_DRAWING_CHANGES_BB_7-31-24__0007.pdf PDF
Attachment_2_Div_1_Specs_FINAL_7-31-24_0007.pdf PDF
SEKI_200843_T3_Dwg_22x34_FINAL_7-30-24_(flattened)_Part3_0007.pdf PDF
Sol_140P8524R0007_Amd_0006.pdf PDF
Sol_140P8524R0007_Amd_0005.pdf PDF
Sol_140P8524R0007_Amd_0004.pdf PDF
Sol_140P8524R0007_Amd_0003.pdf PDF
Cedar_Grove_Primary_WWTP_-_Questions_and_Answers_rev_0002.docx DOCX document
Sol_140P8524R0007_Amd_0002.pdf PDF
Cedar_Grove_Primary_WWTP_Site_Visit_Sign_In_Sheet_0002.pdf PDF
Wage_Determination_CA20240018_04-25-24_0002.pdf PDF
Sol_140P8524R0007_Amd_0001.pdf PDF
B08_Attachment_5_Limitations_On_Subcontracting_Report.xlsx XLSX spreadsheet
B08_Attachment_2_SEKI_200843_Specs_Cedar_Grove_WWTP_Part_2.pdf PDF
B08_Attachment_1_Contract_Price_Schedule.xlsx XLSX spreadsheet
B08_Attachment_3_SEKI_200843_DWGS_22x34-Cedar_Grove_WWTP_Part1.pdf PDF
B08_Attachment_3_SEKI_200843_DWGS_22x34-Cedar_Grove_WWTP_Part2.pdf PDF
Sol_140P8524R0007.pdf PDF
B08_Attachment_7_Past_Performance_Questionnaire.pdf PDF
B08_Attachment_3_SEKI_200843_DWGS_22x34-Cedar_Grove_WWTP_Part3.pdf PDF
B08_Attachment_3_SEKI_200843_DWGS_22x34-Cedar_Grove_WWTP_Part4.pdf PDF
B08_Attachment_3_SEKI_200843_DWGS_22x34-Cedar_Grove_WWTP_Part5.pdf PDF
B08_Attachment_2_SEKI_200843_Specs_Cedar_Grove_WWTP_Part_1.pdf PDF
B08_Attachment_4_Wage_Determination_CA_20240018.pdf PDF
B08_Attachment_6_General_References.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P8524R0007 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PPO

San Francisco CA 94104 Suite 500 333 Bush Street

DOI, NPS, PWR - SF/SEA MABO

PPO

San Francisco CA 94104 Suite 500 333 Bush Street

NPS, PWR - SF/SEA MABO

08/02/20240007

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/11/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Rehabilitate Cedar Grove Wastewater Treatment Plant and Rehabilitate Cedar Grove WWTPs

Controls

Period of Performance: 07/08/2024 to 10/31/2024

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Eric Jordan

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

140P8524R0007 Amendment 0007

The purpose of this amendment is to include additional RFIs that have been answered, include updated specifications/drawings, and to include an updated wage determination. The following changes are hereby made:

A. Replace Attachment 2 (Parts 1-2) of the solicitation with Attachment_2_Div_1_Specs_FINAL_7- 31-24. (903 Pages) Changes annotated in red in the Questions and Answers attachment.

B. Replace Attachment 3 Drawings (Parts 1-5) of the solicitation with Attachment 3 Drawings (Parts 1-5). Changes annotated in Index of Drawing Changes attachment.

C. Replace Attachment 4 of the solicitation, with the Attachment_4_Wage_Determination CA20240018_7-26-24. (47 Pages)

D. Include and attach Amendment 7, Attachment 8, Index_of_Drawing_Changes_BB_7-31-24. (8 Pages)

E. Include and attach Amendment 7, Attachment 9, Cedar Grove Primary WWTP Questions and Answers FINAL. (8 Pages)

F. The solicitation closing date and time has changed from 7 August 2024, at 12:00pm PDT to 15 August 2024, at 1200pm PDT.

File details come from the government source that posted it. Updated .