B08_Attachment_7_Q-A_Amendment_1__Summary_0001.pdf
PDF 136 KB Posted
- Attached to
- PORE BENEVENGA RESIDENCE 157 RENOVATION
- Solicitation number
- 140P8425R0005
About this file
This document is a Request for Proposal (RFP) Amendment for the Benevenga Residence 157 Rehabilitation project at Point Reyes National Seashore. The solicitation (No. 140P8425R0005) covers a rehabilitation project scheduled for August 1, 2025, and includes details from a pre-bid site visit and responses to potential bidders' questions. Key project details include resident vacating the property by October 31, 2025, and allowances for material and product substitutions with contracting officer representative (COR) approval, particularly for roofing, shower materials, and other project components.
The amendment includes updates to project drawings, specifically correcting an error in the east profile view on Drawing Number A03, and adds new attachments such as the site visit sign-in sheet and revised drawing. Potential bidders are instructed to submit pre-proposal questions, document material substitutions in their technical approach, and can propose value approaches that differ from the original scope of work. Specification references are provided for plumbing fixtures, bathroom accessories, cabinet knobs, and door hardware. Interested parties should contact the contracting officer, Brenda Lewis, for additional clarifications.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL NO. 140P8425R0005
BENEVENGA RESIDENCE 157 REHABILITATION
POINT REYES NATIONAL SEASHORE
AUGUST 1, 2025
AMENDMENT 1 & QUESTIONS AND ANSWERS
SITE VISIT SUMMARY:
A pre-bid site visit occurred on Thursday, July 31, 2025, from 1:30 p.m. to 3:30 p.m. Pacific Daylight Time.
Participants met at 8165 Shoreline Hwy, Bolinas, CA 94924. Upon arrival, all participants were asked to sign in, then participants were shown the site and provided with a summary of the proposed work.
See: B08_Attachment_5_Site Visit Sign-In Sheet.pdf
B08_Attachment_7_Q-A_Amendment_1_ Summary.pdf (this document)
QUESTIONS RECEIVED IN PERSON OR VIA EMAIL (7/31/2025 TO DATE):
1. When will the current residents vacate the residence?
The residents are expected to be moved out of the residence no later than 10/31/2025. All personal property will be removed from the home and the surrounding perimeter.
2. Are material and product substitutions allowed?
Materials or products specified may be substituted with approved equal products, with the approval of the contracting officer representative (COR).
a. How will material substitutions be approved and documented in proposals?
Approval of proposed substitutions should be documented by submitting a pre-proposal question via email to the contracting officer. The substitution should also be documented in the proposal submission, within the technical approach written narrative.
b. Are material/product substitutions allowed for roofing?
Yes. The roof area identified as asphalt shingle must be finished with an asphalt shingle roof system of similar color for historic consistency. Asphalt shingles may be substituted with a product of similar color, Class A fire rating, wind resistance, and other salient characteristics listed in the specifications with COR approval. The roof area identified as
TPO may be substituted on approved request with an alternative TPO system or other type of low slope roof covering system with Class A fire rating and a color selection similar to the new asphalt shingle roof section.
c. Are material/product substitutions allowed for the bathroom shower?
Solicitation 140P8425R0005, Attachment #, Q-A & Amendment #
Yes. Alternate shower materials are allowed. Alternate shower materials should avoid the use of grout. Alternate shower materials should be resilient, easy to clean, not easily damaged by common household cleaners, and should minimize the number of joints.
Alternate materials and/or systems should be submitted for COR approval.
3. Will value approaches be considered and how will they be evaluated?
Value approaches will be considered. Value approaches differing from the proposed scope of work may be documented by submitting a pre-proposal question via email to the contracting officer. The approach should be documented in the proposal submission, within the technical approach written narrative.
4. Is there a list of specs for the project that outline specific:
a. Plumbing fixtures
b. Bathroom Accessories
c. Cabinet Knobs
d. Door Hardware
For plumbing fixture specifications, see outline specifications section 224200. For bathroom accessory specifications, see outline specifications section 101010. For door hardware specifications, see outline specifications section 087000. Any quality-grade materials or products that meet these minimum criteria may be submitted for approval. Depending on the selected cabinet style, cabinet knobs may or may not be used. Where necessary, cabinet knobs would be preferred to be a hidden or minimal profile edge pull, channel pull, or tab pull.
SUMMARY OF AMENDMENT 0001 ITEMS:
The offeror shall make the following changes, amendments and additions to the pertinent sheets, pages and paragraphs of the specifications and all associated Solicitation documents, and shall take the same into consideration in the proposed prices:
1. Updated drawings sheet
a. An error was noted in the east profile view shown on Drawing Number A03 (sheet 250 of
303) found in the specifications. A corrected Drawing Number A03 has been attached:
• B08_ Attachment_6_Revised Drawing A03.pdf
2. Updated provisions and clauses
a. Part III, Section J is updated to include the following new attachments:
• B08_Attachment_5_Site Visit Sign-In Sheet.pdf
• B08_ Attachment_6_Revised Drawing A03.pdf
• B08_Attachment_7_Q-A_Amendment_1_ Summary.pdf (this document)
Please reach out to contracting officer Brenda_lewis@nps.gov for any additional questions or clarifications.
mailto:Brenda_lewis@nps.gov
Solicitation 140P8425R0005, Attachment #, Q-A & Amendment #
--END--