Attachment_C_Forms_to_Return_With_Quote.pdf

PDF 85 KB Posted

Attached to
Install Fiber Optic Infrastructure NPS
Solicitation number
140P8326Q0040
Issued by

About this file

This document is a pricing form (Attachment C) for federal contract solicitation 140P8326Q0040 for fiber optic installation services at Craters of the Moon National Monument and Preserve (CRMO).

The solicitation requires vendors to submit quotes for installation and tie-in of fiber optic cable and associated conduit infrastructure to all designated park buildings at CRMO. The work scope includes 19 miles of fiber optic cable installation with 8 connections. Vendors must provide pricing for five line items on a lump-sum basis: mobilization, surface preparation/boring/digging, fiber optic cable/boxes/related equipment, installation and tie-in of fiber optic infrastructure (priced per unit), and demobilization. All labor, equipment, materials, surface preparation, mobilization, overhead, profit, and bonding costs must be included in the quote. Quantities provided are estimates only, and vendors will invoice for actual amounts of fiber optic installed. Responding vendors must complete the form with their business name, DUNS number, CAGE code, point of contact name, phone number, and email address.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140P8326Q0040 Fiber Optic Install Craters of the Moon National Monument

Attachment C Forms to Return with Quote

SUMMARY

1. The work of this bid item consists of installation and tie-in of fiber infrastructure according to the attached Statement of Work and Specifications.

2. If no bid item exists for a portion of the work, include the costs in a related line item.

3. Quantities are estimates only. Vendor will invoice for actual amounts of fiber optic installed.

Bid Item 1:

Install new fiber optic cable and associated conduit infrastructure to all designated park buildings at

Craters of the Moon National Monument and Preserve (CRMO).

Includes all labor, equipment, materials, surface preparation, mobilization, overhead, profit, and bond required to complete the work.

Description Quantity Unit Price Amount

Mobilization 1 Lump

Surface Preparation, boring and digging 1 Lump

Fiber Optic cable, boxes and related equipment 1 Lump

Installation and tie-in of Fiber Optic infrastructure

19 miles, 8 connections

Demobilization 1 Lump

Total Quote

Business name: _________________________Phone number:____________________

DUNS number: _________________________CAGE code: ______________________

Point of contact name: ___________________ E-mail: __________________________

File details come from the government source that posted it. Updated .