This Statement of Work (SOW) details the replacement of overhead garage doors at two historic buildings (N101 and N201) in the Nisqually Entrance Historic District of Mount Rainier National Park. The project involves removing existing overhead doors and installing new 16-gauge steel sectional doors with specific requirements: dark-brown baked-on finish, 20,000-cycle torsion springs, keyed locking devices, and no openers or windows. The work must comply with preservation standards, including the Secretary of the Interior's Standards for Rehabilitation and NPS Director's Order 28.
The project is scheduled for August 1 to December 31, 2025, with careful considerations for historical preservation, environmental protection, and minimal disruption to park operations. Specific requirements include coordinating access through Nisqually Park Road, working only in dry conditions, protecting historic landscape vegetation, and maintaining 24-hour egress for building occupants. Deliverables include manufacturer's product data sheets, daily logs, a final inspection checklist, and record drawings. The Contracting Officer's Representative is Jane Ziolkowski, and the Contracting Officer is John Flatt from the Pacific West Region.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mount Rainier National Park Facilities Maintenance Division
Statement of Work (SOW) Replacement of Overhead Garage Doors – N101 & N201
Mount Rainier National Park Facilities Maintenance Division
Statement of Work (SOW) Replacement of Overhead Garage Doors – N101 & N201
PMIS Project No.: 323461 Performance Period: August 1, 2025 – December 31, 2025 Prepared by: Frances Holmgren, Facilities Operations Specialist Date: July 10, 2025
Project Overview
The Nisqually Entrance Historic District, listed on the National Register of Historic Places (NRHP Ref. No. 91000172), includes distinguished National Park Service Rustic structures constructed between 1926 and 1934. Among these are Building N101 (the single-bay employee housing garage) and Building N201 (the six-bay service garage), both contributing resources that retain original site grading, historic plant palettes, and stonework. This project provides for the full removal and off-site disposal of existing overhead garage doors at these structures and the installation of new 16-gauge steel sectional doors with a dark-brown baked-on finish, 20,000-cycle torsion springs, no openers, keyed locking devices, and no in-panel glazing. All work shall comply with the Secretary of the Interior’s Standards for Rehabilitation, NPS Director’s Order 28, and NPS Preservation Briefs 14 & 47;
accommodate remote-access and weather-window constraints; maintain uninterrupted egress; and integrate environmental protections (erosion/sediment control and vegetation preservation), utilizing a staging area provided by the COR.
I. Project Title
Replacement of Overhead Garage Doors – Nisqually Facilities N101 & N201
II. Location & Historic Reference
• Site: Nisqually Entrance Historic District, Mount Rainier National Park (NRHP Ref.
No. 91000172)
• Buildings:
o N101: Employee Housing Garage (single bay; contributing resource) o N201: Service Garage (six bays; contributing resource)
• Historic Significance: Both structures exemplify early NPS Rustic design (c. 1926– 1934) and are subject to the Secretary of the Interior’s Standards for Rehabilitation and NPS Director’s Order 28.
III. Scope of Work
1. Removal & Disposal
• Carefully detach and remove existing door panels, hardware, springs, cables, and weather-seals (1 at N101; 6 at N201).
• Transport and dispose materials off-site in compliance with federal and state environmental regulations.
2. Track Preservation
• Retain and inspect existing galvanized-steel track assemblies.
• Clean, adjust, and lubricate track and rollers to manufacturer’s specifications.
3. New Door Installation
a. Door Assembly
• Type: Sectional commercial overhead door
• Construction: 16-gauge steel panels; brown baked-on exterior finish
• Springs: 20,000-cycle torsion springs
• Garage door openers: None required
• Model: Overhead Door Company Model 416 (or equivalent, subject to COR approval)
• Locking Devices: Provide keyed, weather-resistant locking device on each door, keyed alike
• Windows: None (solid panels)
b. Dimensions & Quantities
Building Qty Rough Opening (H × W)
N101 1 6′-8″ × 12′
N201 5 8′-7″ × 9′-4″
N201 1 8′-7″ × 9′-7″
4. Preservation Standards
• All materials, methods, and finishes shall comply with the Secretary of the Interior’s Standards for Rehabilitation, NPS Director’s Order 28, and NPS Preservation Briefs 14 & 47.
• No alteration to original framing, bay openings, site grading, historic plantings, or stonework.
IV. Access, Constraints & Environmental Factors
A. Remote & Weather Access
• Access Route: Nisqually Park Road; coordinate vehicle passes and tool deliveries with COR.
• Weather Windows: Conduct exterior work only in dry conditions; suspend work if precipitation or temperatures below 32 °F are forecasted.
B. Employee Housing Access
• Coordinate door-replacement schedule with occupants of N101 to maintain 24-hour egress and minimize noise and dust impacts.
C. Environmental & Safety Requirements
• Erosion Control: Install silt fencing or hay-bale barriers to prevent sediment runoff, as needed.
• Historic Landscape Vegetation Protection: Lay ground-protection mats; avoid disturbance of historic plant palettes.
• OSHA Compliance: Provide fall protection, barricades, and emergency access per 29 CFR 1910.
D. Staging Area
• A staging area shall be provided by the COR.
• Requirements: Use spill-containment for paint, solvents, and lubricants; avoid historic features; restore to pre-work condition.
V. Execution & Testing
• Installation Sequence: Verify rough openings; install track assemblies; hang door panels; fit springs, cables, seals, and locks.
• Testing: Cycle each door at least 20 times; verify balance, smooth operation, and weatherseal performance; adjust hardware as necessary.
• Protection: Shield adjacent siding, windows, and landscape features throughout the work to prevent damage to historic structures.
VI. Deliverables
• Manufacturer’s product data sheets and shop drawings for doors, springs, and locking hardware.
• Daily logs documenting safety, environmental controls, and work progress.
• Final inspection checklist signed by Contractor and COR.
• Record drawings (PDF) showing as-installed door locations and hardware.
VII. Performance Period
• All work shall be completed between August 1 and December 31, 2025, with field activities scheduled to avoid peak visitor periods and adverse weather.
VIII. Point of Contact
• Contracting Officer’s Representative (COR): Jane Ziolkowski, Contracting Officer’s Representative, MORA
• Contracting Officer (CO): John Flatt, Contract Specialist, Pacific West Region
• Preparer: Frances Holmgren, Facilities Operations Specialist, MORA
End of SOW