This Scope of Work (SOW) details the procurement and installation of three insulated overhead garage doors for the John Day Fossil Beds National Monument's maintenance shop in Kimberly, Oregon. The project requires Wayne Dalton ThermoMark™ 5200 or equivalent doors, each approximately 10' x 10' with bronze color, featuring heavy-duty steel construction, R-16 polyurethane insulation, and three clear polycarbonate windows. The contractor must remove existing doors, install new doors using manufacturer-recommended methods, ensure weather-tight sealing, and perform comprehensive testing, with a minimum one-year warranty on materials and labor. The National Park Service (NPS) will conduct a formal inspection to confirm compliance with contract specifications, and the contractor is responsible for site cleanup and proper disposal of old materials.

View the file

Other files for this federal contract opportunity

Other files attached to JODA GARAGE DOOR REPLACE, newest first.
File Type Posted
Sol_140P8325Q0046_Amd_0001.pdf PDF
Vendor_s_Questions___Answers_140P8325Q0046_00001_0001.pdf PDF
Attachment_2_Past_Performance_JODA_Gargare_Door_Replace.docx DOCX document
Sol_140P8325Q0046.pdf PDF
Attachment_1_1_SOW_Pictures.pdf PDF
Attachment_3_Wage_Determination_Grant_County_Oregon_JODA_Garage_Door_Replace.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work (SOW) Project Title: Procurement and installation of three new insulated garage doors.

Installation of Three Wayne Dalton ThermoMark™ 5200 or Equivalent Overhead Doors Location: John Day Fossil Beds National Monument – Maintenance Shop 32651 Highway 19, Kimberly, OR 97848

1. Project Overview This SOW outlines the supply, delivery, and installation of three (3) insulated steel commercial overhead doors with integrated clear insulated windows, to be installed at the maintenance shop at John Day Fossil Beds National Monument. The specified doors shall be Wayne Dalton ThermoMark™ 5200 or an equivalent model, meeting or exceeding all required performance and construction characteristics. Brand Name or Equal FAR Clause 52.211-6 applies.

2. General Requirements

• Quantity of Doors: Three (3)

• Size: Approximately 10 feet by 10 feet per door

• Location: John Day Fossil Beds National Monument – Maintenance Shop

32651 Highway 19, Kimberly, OR 97848

• Color: Bronze

• Scope of Work:

o Removal and disposal of existing doors and hardware o Delivery and installation of new doors o Installation of all necessary mounting hardware and seals o Testing and verification of full door functionality

3. Product Specifications/Salient Characteristics

3.1 Door Dimensions

• Size: Approximately 10' x 10'

• Shape: Rectangular overhead commercial doors

3.2 Insulation

• R-Value: Minimum of R-16

• Material: Polyurethane or equivalent high-performance insulation

3.3 Door Construction

• Material: Heavy-duty, reinforced steel panels

• Finish: Corrosion-resistant, UV-protected, weather-resistant gray exterior

• Durability: Built for heavy commercial use and all-weather performance

3.4 Windows

• Number: Three (3) clear windows per door

• Placement: Evenly spaced at the top section of the door

• Material: Clear polycarbonate or equivalent; impact and weather resistant

3.5 Seals

• Type: High-performance perimeter seals (top, bottom, and sides)

• Function: Minimize air leakage, dust entry, and moisture infiltration

3.6 Operation

• Mechanism: Manual operation with chain hoist

• Spring System: High-cycle torsion spring system for smooth operation

3.7 Aesthetic Requirements

• Color: Bronze

• Appearance: Free from visible defects upon installation

4. Installation Requirements

4.1 Pre-Installation

• Site Visit: Contractor is encouraged perform a site assessment to verify conditions and compatibility

• Structural Evaluation: Ensure existing door frames/openings are adequate or recommend necessary modifications (subject to NPS approval)

4.2 Installation Process

• Removal: Safely remove and dispose of the existing doors and hardware

• Mounting: Install new doors using manufacturer-recommended methods and hardware

• Seal Installation: Install all required seals for weather-tight performance

• Window Installation: Ensure secure, sealed installation of windows

4.3 Post-Installation

• Testing: Operate doors to ensure smooth, functional performance

• Seal Verification: Confirm integrity and effectiveness of installed seals

• Window Inspection: Check for clarity, security, and proper sealing

5. Warranty

• Duration: Minimum of one (1) year on both materials and labor

• Coverage: Repair or replacement of any defects or failures at no additional cost

6. Contractor Responsibilities

• Coordination: Work closely with the NPS to ensure minimal disruption and access to the site.

• Disposal: Remove and properly dispose of all old materials and debris

• Clean-Up: Leave the worksite clean and hazard-free at project completion

8. Final Acceptance

• A formal inspection by NPS will confirm compliance with contract specifications.

• Contractor is responsible for correcting any issues prior to final acceptance and payment.

10. Salient Characteristics of Wayne Dalton ThermoMark™ 5200 (or Equivalent) The installed doors must meet or exceed the following characteristics:

• R-16 Insulation Rating

• Heavy-duty steel construction

• Polyurethane core insulation

• Three clear windows at the top of each door

• High-quality weather-resistant perimeter seals

• Clear, durable polycarbonate or equivalent window material

• Reliable performance for commercial overhead applications

Scope of Work (SOW)
1. Project Overview
2. General Requirements
3. Product Specifications/Salient Characteristics
3.1 Door Dimensions
3.2 Insulation
3.3 Door Construction
3.4 Windows
3.5 Seals
3.6 Operation
3.7 Aesthetic Requirements
4. Installation Requirements
4.1 Pre-Installation
4.2 Installation Process
4.3 Post-Installation
5. Warranty
6. Contractor Responsibilities
8. Final Acceptance
10. Salient Characteristics of Wayne Dalton ThermoMark™ 5200 (or Equivalent)