Sol_140P8325Q0022_Amd_0002.pdf

PDF 91 KB Posted

Attached to
Safeboat Repower, Lake Roosevelt National Rec Area
Solicitation number
140P8325Q0022
Issued by

About this file

This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a National Park Service (NPS) contract (Solicitation No. 140P8325Q0022). The amendment (P0002) provides clarifications about boat engine and motor specifications for what appears to be a marine vessel procurement. Key details include confirming space availability for an outboard kicker motor, potential alternative engine options (Yamaha F300UCA or Honda 350 HP), and the possibility of adding an electric trolling motor as a secondary option.

The amendment specifies the period of performance from 09/29/2025 to 12/01/2025 and requires contractors to have active profiles with completed representations/certifications on SAM.gov. Contractors must submit PDF invoices through the Internet Payment Platform (https://www.ipp.gov) and are instructed to provide manufacturer cut sheets/data for any proposed alternative products. The contracting entity is the NPS Pacific West Region (PWR) - Olympic Mount Rainier & Mount Baker-Snoqualmie National Parks, located in Port Angeles, Washington.

View the file

Other files

File Type Posted
IMG_0351_0003.JPG JPG image
IMG_0348_0003.JPG JPG image
Sol_140P8325Q0022_Amd_0003.pdf PDF
IMG_0355_0003.JPG JPG image
IMG_0354_0003.JPG JPG image
Sol_140P8325Q0022_Amd_0001.pdf PDF
B08_Past_Performance_Questionaires.docx DOCX document
B03_SCA_WD_2015-5559__07_08_2025.pdf PDF
B08_Forms_to_Return_with_QUOTE.docx DOCX document
Sol_140P8325Q0022.pdf PDF
A04_FINAL_SD_safeboat_SOW.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P8325Q0022 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PY2

Ashford WA 98304-9751 55210 238th. Ave. E.

DOI, NPS, PWR - OLYM MABO - MORA

PPY

Port Angeles WA 98362-6757 600 E. Park Avenue

NPS, PWR - OLYM MABO

07/23/20250002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/23/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Contractors are required to have active profiles with completed representations/certifications in the SAM.gov website on the due date of quotes unless amendment(s) are issued to extend it. https://www.sam.gov

The purpose of this amendment P0002 is to post the following Q&A from the site visit:

Q1: Is there space for an outboard kicker motor?

A1: There should be if we're replacing the current engine with the same engine (Yamaha

F300UCA)

Q2: Is there space for a separate fuel tank for the kicker motor?

A2: Yes, if we place the fuel tank in the empty compartment behind the captain's seat

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Hal Hoversten

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P8325Q0022/0002

Q.3.The solicitation mentions an Optional 5-15 Hp kicker motor installed if possible. Due to the size of the 300 hp motor a kicker motor would not work due to lack of space. Would it be ok if I quote an electric trolling motor that could be installed on the bow without any problem? It would be a secondary option that could be used in the event the engine should fail.

A.3. Any "Optional" changes can be identified in the offer. Such as i.e. "Option 1 15 HP four cycle kicker" $X,XX.XX" or "Option Honda 300 HP instead of Yamaha brand".

Q.4. After looking at pricing for the 300HP

Yamaha engine there is an equivalent Honda 350 HP engine that offers more power and a 5 year warranty on the motor as opposed to the 2 year warranty Yamaha is offering. Just want to confirm that the park service is ok with us quoting the

350 hp Honda are. Should we focus on the 300 hp

Yamaha engine?

A.4. Please identify any "option" items as alternative to the identified brand make and models.

**Please provide cut sheets/manufacturer data for any offered products to evaluate equivalence**

There are no other changes.

Period of Performance: 09/29/2025 to 12/01/2025

Contractors are required to attach/submit a PDF invoice along with a payment request through the

Internet Payment Platform website:

https://www.ipp.gov

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .