Sol_140P8325Q0022_Amd_0002.pdf
PDF 91 KB Posted
- Solicitation number
- 140P8325Q0022
About this file
This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a National Park Service (NPS) contract (Solicitation No. 140P8325Q0022). The amendment (P0002) provides clarifications about boat engine and motor specifications for what appears to be a marine vessel procurement. Key details include confirming space availability for an outboard kicker motor, potential alternative engine options (Yamaha F300UCA or Honda 350 HP), and the possibility of adding an electric trolling motor as a secondary option.
The amendment specifies the period of performance from 09/29/2025 to 12/01/2025 and requires contractors to have active profiles with completed representations/certifications on SAM.gov. Contractors must submit PDF invoices through the Internet Payment Platform (https://www.ipp.gov) and are instructed to provide manufacturer cut sheets/data for any proposed alternative products. The contracting entity is the NPS Pacific West Region (PWR) - Olympic Mount Rainier & Mount Baker-Snoqualmie National Parks, located in Port Angeles, Washington.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IMG_0351_0003.JPG | JPG image | |
| IMG_0348_0003.JPG | JPG image | |
| Sol_140P8325Q0022_Amd_0003.pdf | ||
| IMG_0355_0003.JPG | JPG image | |
| IMG_0354_0003.JPG | JPG image | |
| Sol_140P8325Q0022_Amd_0001.pdf | ||
| B08_Past_Performance_Questionaires.docx | DOCX document | |
| B03_SCA_WD_2015-5559__07_08_2025.pdf | ||
| B08_Forms_to_Return_with_QUOTE.docx | DOCX document | |
| Sol_140P8325Q0022.pdf | ||
| A04_FINAL_SD_safeboat_SOW.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P8325Q0022 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PY2
Ashford WA 98304-9751 55210 238th. Ave. E.
DOI, NPS, PWR - OLYM MABO - MORA
PPY
Port Angeles WA 98362-6757 600 E. Park Avenue
NPS, PWR - OLYM MABO
07/23/20250002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/23/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Contractors are required to have active profiles with completed representations/certifications in the SAM.gov website on the due date of quotes unless amendment(s) are issued to extend it. https://www.sam.gov
The purpose of this amendment P0002 is to post the following Q&A from the site visit:
Q1: Is there space for an outboard kicker motor?
A1: There should be if we're replacing the current engine with the same engine (Yamaha
F300UCA)
Q2: Is there space for a separate fuel tank for the kicker motor?
A2: Yes, if we place the fuel tank in the empty compartment behind the captain's seat
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Hal Hoversten
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8325Q0022/0002
Q.3.The solicitation mentions an Optional 5-15 Hp kicker motor installed if possible. Due to the size of the 300 hp motor a kicker motor would not work due to lack of space. Would it be ok if I quote an electric trolling motor that could be installed on the bow without any problem? It would be a secondary option that could be used in the event the engine should fail.
A.3. Any "Optional" changes can be identified in the offer. Such as i.e. "Option 1 15 HP four cycle kicker" $X,XX.XX" or "Option Honda 300 HP instead of Yamaha brand".
Q.4. After looking at pricing for the 300HP
Yamaha engine there is an equivalent Honda 350 HP engine that offers more power and a 5 year warranty on the motor as opposed to the 2 year warranty Yamaha is offering. Just want to confirm that the park service is ok with us quoting the
350 hp Honda are. Should we focus on the 300 hp
Yamaha engine?
A.4. Please identify any "option" items as alternative to the identified brand make and models.
**Please provide cut sheets/manufacturer data for any offered products to evaluate equivalence**
There are no other changes.
Period of Performance: 09/29/2025 to 12/01/2025
Contractors are required to attach/submit a PDF invoice along with a payment request through the
Internet Payment Platform website:
https://www.ipp.gov
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .