This document provides details for a federal solicitation seeking proposals to rehabilitate the wastewater system at Lewis & Clark National Historical Park in Astoria, Oregon. The project involves constructing a new 5,000 gallon per day wastewater collection, treatment, and disposal system to serve the Fort Clatsop Visitor Center and Administration Building. Interested offerors must attend a mandatory site visit on August 11, 2020 and submit proposals by the closing date. The contract will have a period of performance of approximately 9.5 months and be awarded on a firm-fixed price basis. The project value is estimated between $500,000 to $1,000,000. The solicitation is set aside for small businesses and proposals are due by the closing date specified in the solicitation. The National Park Service Pacific West Region is the contracting agency.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation no. 140P8320R0005, Amendment 001, Attachment no. 10 (8/31/20)
Rehabilitation Wastewater System, LEWI
An organized pre-proposal site visit occurred on August 11, 2020 at 1pm (PT) at Lewis & Clark
National Historical Park (LEWI), Astoria, Oregon, as scheduled and announced in the pre-solicitation synopsis and Solicitation (Section L of Attachment no. 3).
List of Attendees:
For National Park Service:
Phaedra Fuller, Contracting Officer
Colby Mackley, Chief of Facility Management
Contractors:
DSL Builders LLC, Salem, OR (DUNS: 962931239)
Hamer Electric Inc., Longview, WA (DUNS: 061500906)
Big River Construction Inc., Astoria, OR (DUNS: 102027575)
JMG Constructors LLC, Poulsbo, WA (DUNS: 078382471)
Harrington Industrial Plastics LLC, Tigard, OR (DUNS: 021403720)
The site visit consisted of brief introduction of project and NPS staff, and then a site walk.
Q&A and Clarifications:
Irrigation box is already out of use.
Spoils will need to be hauled off-site, piled in sequence so they can be inspected by the NPS
Archeologist. Do not scatter dump. Some of the spoils can be used as backfill.
The internal components inside the building are not part of this project.
Near visitor center area, if you come to a big tree, go under or saw cut, but please first coordinate with COR as NPS prefers to keep as many trees in tact as possible.
The visitor center will remain open during construction. NPS prefers that any cutting of asphalt and/or concrete in the area of visitor center not occur during the busiest part of the day, preferable to cut morning or late afternoon/early evening.
Preparing area for installing drainfield will most likely require removing some trees/timber.
Contractor will need to relocate rootballs to a designated area which is near site, a burn road
Park’s maintenance shop.
On plans/drawings, the out building with water system is on backside of visitor center public restrooms.
Additional Q&A is included in Attachment no. 10.