B09_SOW_Amendment_BIHO_146594_Spec_04042017.docx
DOCX document 116 KB Posted
- Attached to
- BIHO - REPLACE WINDOWS UNIT #5 Federal contract opportunity
- Solicitation number
- 140P8318Q0123
About this file
SOW Amendment
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B09_Amendment_WINDOW_SCHEDULE.docx | DOCX document | |
| 5c.zip | ZIP file | |
| B09_SF-30_Amendment_140P8318Q0123.pdf | ||
| 5d.zip | ZIP file | |
| 5a.zip | ZIP file | |
| Sol_140P8318Q0123_Amd_0001.pdf | ||
| 5b.zip | ZIP file | |
| B09_Amendment_Drawings_Windows_BIHO_341_3009C_emp_apartment.pdf | ||
| B09_Amendment_to_Solicitation_140P8318@0123.docx | DOCX document | |
| B08_SF-25A_PAYMENT_BOND_FORM.pdf | ||
| B08_Section_B_Price_Schedule.docx | DOCX document | |
| B08_SF-1442_RFQ_140P8318Q0123.pdf | ||
| Sol_140P8318Q0123.pdf | ||
| B08_Section_C-M_Terms_and_Conditions_9-12-2018.docx | DOCX document | |
| B08_Attachment_1_READ_ME_FIRST.docx | DOCX document | |
| B08_Wage_Detrmination_MT180026_Beaverhead_County,Montana.pdf | ||
| B08_SOW_Replace_Windows.doc | DOC document | |
| B08_Experience_and_Past_Performance.docx | DOCX document | |
| B08_NPS_CM-16_Transmittal_Form_Use_for_Contract_Submittals.docx | DOCX document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BIG HOLE
NATIONAL BATTLEFIELD
Replace Windows in Quad-Plex Housing Unit For Safe Egress and Energy Efficiency
PMIS 146594
NATIONAL PARK SERVICE
PACIFIC WEST REGION
March 2017 Prepared by Hoa Lam
REPLACE WINDOWS IN QUAD-PLEX HOUSING UNIT FOR
BIG HOLE NATIONAL BATTLEFIELD
TABLE OF CONTENTS
DIVISION 1 - GENERAL REQUIREMENTS
| 01110 | Summary of Work |
| 01270 | Definition of Bid Items |
01323 Project Schedule and Inspections
| 01330 | Submittals |
| 01360 | Accident Prevention |
| 01430 | Contractor Quality Control |
| 01510 | Temporary Services |
01560 Barriers ..
01770 Project Closeout
DIVISION 8 – DOORS AND WINDOWS
08520 Wood Windows
SECTION 01110
SUMMARY OF WORK
| PART 1 | GENERAL |
| PART 1 | GENERAL |
DESCRIPTION
The work of this contract consists of:
1. Replacing 35 double-hung, single-pane windows at the quad-plex housing unit. Replacement will be of similar size and type with the exception of:
Window C in Unit 2 bedroom 2 will be horizontal slider;
| Window B (quantity of 2) in Unit 1 bedroom 2 (currently used as office) will be |
| casement. |
| WINDOW |
| SIZE |
| COUNT |
| A |
| 2’-0” W X 3’-6 3/8” H |
| 4 |
| B |
| 3’-8” X 3’-6 3/8” |
| 18 |
| C |
| 7’-1” X 3’-6 3/8” |
| 1 |
| D |
| 3’-8” X 4’-10 3/8” |
| 12 |
2. Removing and disposing 35 exterior storm windows.
3. Performing incidental repair of adjacent rotted framing members and trims damaged during the replacement process.
All work will be performed under a single contract.
LOCATION
The project is located at Big Hole National Battlefield is located approximately 112 miles south of Missoula, Montana, via Highways 93 and 43.
PREBID MEETING
A prebid meeting will be held on-site. Attendance is not required but strongly encouraged as this provides the opportunity for bidders to see the existing conditions.
CONTRACTOR'S USE OF PREMISES
Construction Camp: Establishment of a camp within the park will not be permitted.
The building will remain in operation public during construction. Sequencing and protecting work to minimize disruption.
Contractor shall at all times conduct his operations to ensure the least inconvenience to the public. Road closures will be permitted, when required, upon specific approval of Contracting Officer.
Confine storage of materials to designated location near the housing area per COR’s directions.
Preservation of Natural Features: Confine all operations to work limits of the project. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
Provide temporary barriers to protect existing trees and plants and root zones.
Do not remove, injure, or destroy trees or other plants without prior approval. Consult with Contracting Officer and remove agreedon roots and branches that interfere with construction.
Do not fasten ropes, cables, or guys to existing trees.
Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.
Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for excavation.
Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.
If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.
Interruption of Existing Utility Service: Notify Contracting Officer of the time and duration when utility service is to be interrupted. Obtain written approval by the CO.
Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.
SPECIAL CONSTRUCTION REQUIREMENTS
Holiday Work Restrictions: No on-site work shall be performed on weekends and federal holidays unless otherwise directed by the Contracting Officer.
Coordination with housing occupants might be necessary.
FIELD VERIFICATION
Field-verify all new and existing dimensions affecting the work of this contract before ordering products.
CONTRACT SCHEDULE
Contract duration is 45 calendar days from Notice-To-Proceed (NTP).
On-site work hours are Monday to Friday, 7:00AM to 5:30 PM.
| PART 2 | PRODUCTS | Not used. | |
| PART 2 | PRODUCTS | Not used. | |
| PART 3 | EXECUTION | Not used. | |
| PART 3 | EXECUTION | Not used. | |
| PART 4 | MEASUREMENT AND PAYMENT | ||
| PART 4 | MEASUREMENT AND PAYMENT |
SUMMARY OF WORK
Payment will be included in the bid item to which this work relates.
END OF SECTION
| BIHO 146594 | 01110-5 |
| SUMMARY OF WORK |
SECTION 01270
DEFINITION OF BID ITEMS
| PART 1 | GENERAL |
| PART 1 | GENERAL |
| 1.1 | DESCRIPTION |
The intent of this section is to explain, in general, what is and what is not included in a bid item, and the limits or cutoff points where one bid item ends and another begins.
If no bid item exists for a portion of the work, include the costs in a related bid item.
1.2 ITEM NO. 1: Window A
This bid item consists of providing all labor, material and equipment to remove and install window A.
1.3 ITEM NO. 2: Window B
This bid item consists of providing all labor, material and equipment to remove and install window B.
1.4 ITEM NO. 3: Window C
This bid item consists of providing all labor, material and equipment to remove and install window C.
1.5 ITEM NO. 4: Window D
This bid item consists of providing all labor, material and equipment to remove and install window D.
| PART 2 | PRODUCTS | Not used. |
| PART 2 | PRODUCTS | Not used. |
| PART 3 | EXECUTION | Not used. | |
| PART 3 | EXECUTION | Not used. | |
| PART 4 | MEASUREMENT AND PAYMENT | Not used. | |
| PART 4 | MEASUREMENT AND PAYMENT | Not used. | |
| END OF SECTION |
| BIHO 146594 | 01270-6 |
| DEFINITION OF BID ITEMS |
SECTION 01323
PROJECT SCHEDULE AND INSPECTIONS
| BIHO 146594 | 01323-9 |
| PROJECT SCHEDULE AND MONTHLY INSPECTIONS | |
| PART 1 | GENERAL |
| PART 1 | GENERAL |
| 1.1 | DESCRIPTION |
Summary: The work of this section consists of project schedule requirements including preparation of a project schedule, schedule updates, and schedule revisions.
Purpose: The purpose of the project schedule is to ensure adequate planning, coordination, scheduling, and reporting during execution of the work by the Contractor. The project schedule will assist the Contractor and Contracting Officer in monitoring the progress of the work, evaluating proposed changes, and processing the Contractor's monthly progress payment.
| 1.2 | SUBMITTALS: |
| A. | Project Schedule: Within 14 calendar days after Notice to Proceed, submit electronic copy (Adobe Acrobat PDF) via e-mail the proposed project schedule. |
| B. | Project Schedule Updates: On or before the 7th day preceding the progress payment request date, submit estimates of the percent completion of each schedule activity and necessary supporting data. |
| C. | Project Schedule Revisions: Submit any proposed schedule revisions and discuss reasons and impact to project completion, if any; and mitigation measures. |
| 1.3 | PROJECT SCHEDULE |
| A. | Schedule Development: |
The Contractor's project schedule shall include product submittals, NPS reviews, procurement including fabrication and delivery, construction activities, and close-out.
Ensure that subcontractor work at all tiers, as well as the prime work, is included and coordinated in the project schedule.
The project schedule as developed shall show the sequence, interdependence and durations of activities required for complete performance of the work. Ensure all work sequences are logical and the project schedule shows a coordinated plan of the work.
Consider seasonal weather conditions in planning and scheduling all work influenced by high or low ambient temperatures, wind and/or precipitation to ensure completion of all work within the contract time. Show anticipated weather conditions on project calendar.
B. Joint Review, Revision, and Acceptance:
Within seven calendar days of receipt of the Contractor's proposed project schedule, the Contracting Officer shall provide approval or request correction or adjustment of the proposed project schedule. Any areas which, in the opinion of the Contracting Officer, conflict with timely completion of the project shall be subject to revision by the Contractor.
In the event the Contractor fails to define any element of work, activity, or logic, and the Contracting Officer review does not detect this omission or error, such omission or error, when discovered by the Contractor or Contracting Officer, shall be corrected by the Contractor at the next monthly project schedule update and shall not affect the contract time.
The Contractor shall revise and resubmit the project schedule within seven calendar days after receiving the Contracting Officer’s review.
Upon acceptance of the project schedule by the Contracting Officer, the project schedule will be used to evaluate the Contractor's monthly applications for payment based upon information developed at the monthly project schedule update meeting.
| 1.4 | PROJECT SCHEDULE UPDATES |
| A. | General: Update the project schedule on a monthly basis throughout the entire contract time and until project substantial completion. The status date of each schedule update shall be the 7th day preceding the progress payment request date. |
| B. | Progress Payments: The monthly updating of the project schedule shall be an integral part of the process upon which progress payments will be made under this contract. If, in the judgment of the Contracting Officer, the Contractor fails or refuses to provide a complete schedule update or revision as specified hereinafter, the Contractor shall be deemed to have not provided the required information upon which the progress payment may be made, and shall be subject to retainage of a portion of the payment. |
| 1.5 | PROJECT SCHEDULE REVISIONS |
| A. | Required Revisions: If, as a result of the monthly schedule update, it appears the project schedule no longer represents the actual prosecution and progress of the work, the Contracting Officer will request, and the Contractor shall submit, a revision to the project schedule. The Contractor may also request reasonable revisions to the project schedule in the event the Contractor's planning for the work is revised. If the Contractor desires to make changes in the project schedule, the Contractor shall notify the Contracting Officer in writing, stating the reason for the proposed revision. Accepted revisions will be incorporated into the project schedule at the next monthly schedule update. |
| B. | Time Impact: When contract modifications or changes are initiated, delays are experienced, or the Contractor desires to revise the project schedule, the Contractor shall submit to the Contracting Officer a written time impact analysis illustrating the influence of each modification, change, delay, or Contractor request on the contract time. |
| PART 2 | PRODUCTS | Not used. |
| PART 2 | PRODUCTS | Not used. |
| PART 3 | EXECUTION | Not used. |
| PART 3 | EXECUTION | Not used. |
| PART 4 | MEASUREMENT AND PAYMENT |
| PART 4 | MEASUREMENT AND PAYMENT |
4.1 PROJECT SCHEDULE AND MONTHLY INSPECTIONS
SECTION 01330
SUBMITTALS
| BIHO 146594 | 01330-11 |
| SUBMITTALS | |
| PART 1 | GENERAL |
| PART 1 | GENERAL |
| 1.1 | DESCRIPTION |
The work of this section consists of submittal requirements.
| 1.2 | RELATED REQUIREMENTS |
| A. | Closeout submittals Section 01770. |
| 1.3 | LIST OF SUBMITTALS |
A. Proposed project schedule Accident prevention plan Contractor’s quality control plan Product data
1.4 SUBMITTAL AND APPROVAL PROCEDURES
A. Forward submittals to Contracting Officer at least 15 days before need for approval.
| B, | Electronic submittals as Adobe Acrobat files are encouraged for ease of distribution, review and approval. |
| D. | Contracting Officer reserves the right to require submittals in addition to those called for in individual sections. |
| E. | Construction Materials: The Contractor is encouraged to submit for approval products made out of recycled or environmentally responsible material that meet performance requirements. Every effort will be made by the National Park Service to approve these materials. |
| F. | Coordinate all submittals and review them for legibility, accuracy, completeness, compliance with contract requirements. |
| G. | Ensure specific products are clearly marked-up if product data sheets contain multiple products. |
| H. | Submittal Numbering: |
| 1. | Number each submittal consecutively. |
| 2. | For re-submittals use the original submittal number, plus a letter suffix beginning with A. |
| 3. | Additional re-submittals of the same item shall contain the original number with the next consecutive letter. |
| I. | Contracting Officer's Review: |
| 1. | Any work done or orders for materials or services placed before approval shall be at the Contractor's own risk. |
| 2. | The returned submittal will be marked in one of three ways as defined below: |
APPROVED: Acceptable with no corrections.
APPROVED WITH NOTATIONS: Minor corrections or clarifications required. All comments are clear and no further review is required. The Contractor shall address all review comments when proceeding with the work.
DISAPPROVED - RESUBMIT: Rejected as not in accordance with the contract or as requiring major corrections or clarifications. The Contracting Officer will identify the reasons for disapproval. The Contractor shall revise and resubmit with changes clearly identified.
| PART 2 | PRODUCTS | Not used. |
| PART 2 | PRODUCTS | Not used. |
| PART 3 | EXECUTION | Not used. |
| PART 3 | EXECUTION | Not used. |
| PART 4 | MEASUREMENT AND PAYMENT |
| PART 4 | MEASUREMENT AND PAYMENT |
| 4.1 | SUBMITTALS |
| BIHO 208146 & 217102 | 01350-13 |
| ARCHEOLOGICAL PROTECTION |
SECTION 01360
ACCIDENT PREVENTION
| BIHO 146594 | 01360-14 |
| ACCIDENT PREVENTION | |
| PART 1 | GENERAL |
| PART 1 | GENERAL |
| 1.1 | DESCRIPTION |
The work of this section consists of establishing an effective accident prevention program and providing a safe environment for all personnel and visitors.
| 1.2 | SUBMITTALS |
| A. | Accident Prevention Program: Before onsite work begins, submit for approval an accident prevention program. The Contracting Officer will review the proposed program for compliance with OSHA and project requirements. If the program requires any revisions or corrections, the Contractor shall resubmit the program within 10 days. No progress payments will be made until the program is approved. The program shall include: |
Name of responsible supervisor to carry out the program.
Weekly and monthly safety meetings.
First aid procedures.
Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to ensure property protection and safety of the public, National Park Service personnel, and Contractor's employees. Identify the work included under each phase by reference to specification section or division numbers.
Training, both initial and continuing.
Planning for possible emergency situations, such as fires, caveins, slides, explosions, power outages, and wind storms. Such planning shall take into consideration the nature of construction, site conditions, and degree of exposure of persons and property.
Include history of DART (days away job restriction or transfer), or alternately OSHA 300A Summary of Occupational Illness, for the last three years.
Fire Protection: Section 01510.
Certificates: Provide certificates from a mechanic that all mechanical equipment has been inspected and meets OSHA requirements.
Submit a copy of test reports, as required by OSHA, for personnel working with hazardous materials.
Upon request, submit proof of employees' qualifications to perform assigned duties in a safe manner.
| 1.3 | QUALITY ASSURANCE |
| A. | Clauses entitled "Accident Prevention" and "Permits and Responsibilities" of the contract. In case of conflicts between Federal, state, and local safety and health requirements, the most stringent shall apply. Equipment or tools not meeting OSHA requirements will not be allowed on the project sites. Failure to comply with the requirements of this section and related sections may result in suspension of work. |
| B. | Qualifications of Employees: |
Ensure that employees are physically qualified to perform their assigned duties in a safe manner.
Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
Operators of vehicles, mobile equipment, hoisting equipment, and hazardous plant equipment shall be able to understand signs, signals, and operating instructions, and be capable of operating such equipment. Provide operating instructions for all equipment. Newly hired operators shall be individually tested by an experienced operator or supervisor to determine if they are capable of safely operating equipment.
| C. | The Contractor’s accident history should be at or below industry average. If higher, the Accident Prevention Plan should address specific practices to lower accident rate. |
| 1.4 | ACCIDENT REPORTING |
| A. | Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, and fires. Notify Contracting Officer immediately in the event of a reportable accident. Property damage in excess of $1,000 is reportable. Within 7 days of a reportable accident, fill out and forward to Contracting Officer an Accident/Property Damage Report (Form CM-22). Form may be obtained from the Contracting Officer. |
| B. | Property Damage: the contractor is responsible for all repairs of any damage to government property. |
| C. | All Other Accidents: The Contractor shall report all other accidents to the Contracting Officer as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident. |
| PART 2 | PRODUCTS |
| PART 2 | PRODUCTS |
| 2.1 | FIRST AID FACILITIES |
Provide adequate facilities for the number of employees and the type of construction at the site.
| 2.2 | PERSONNEL PROTECTIVE EQUIPMENT |
| A. | Meet requirements of NIOSH and MSHA. |
| 2.3 | BARRIERS |
| A. | Section 01560. |
| PART 3 | EXECUTION |
| PART 3 | EXECUTION |
| 3.1 | Execute according to approved plan. |
| PART 4 | MEASUREMENT AND PAYMENT |
| PART 4 | MEASUREMENT AND PAYMENT |
| 4.1 | ACCIDENT PREVENTION |
SECTION 01430
CONTRACTOR QUALITY CONTROL
| BIHO 146594 | 01430-19 |
| CONTRACTOR QUALITY CONTROL | |
| PART 1 | GENERAL |
| PART 1 | GENERAL |
| 1.1 | DESCRIPTION |
The work of this section consists of preparing and executing a quality control program.
| 1.2 | RELATED REQUIREMENTS |
| A. | "Inspection of Construction" clause of the contract. |
| 1.3 | SUBMITTALS |
| A. | As specified in section 01330. |
Quality Control Plan:
The plan shall include:
A list of personnel responsible for quality control and assigned duties. Include each person's qualifications.
A copy of a letter of direction to the Contractor's Quality Control Supervisor outlining assigned duties.
Names, qualifications, and descriptions of laboratories to perform sampling and testing, and samples of proposed report forms.
Methods of performing, documenting, and enforcing quality control of all work.
Methods of monitoring and controlling environmental pollution and contamination as required by regulations and laws.
C. Contractor’s Quality Control Daily Report: submit weekly
| 1.4 | QUALITY ASSURANCE |
| A. | General: |
The quality of all work shall be the responsibility of the Contractor.
Inspect and test all work often enough to ensure that the quality of materials, workmanship, construction, finish, and functional performance is in compliance with applicable specifications and drawings.
B. Quality Control Staff:
The Contractor's Quality Control Supervisor may also perform the duties of Project Superintendent.
The Contractor's designated Quality Control Supervisor shall be on the project site whenever contract work is in progress.
| PART 2 | PRODUCTS | Not used. |
| PART 2 | PRODUCTS | Not used. |
| PART 3 | EXECUTION | |
| PART 3 | EXECUTION | |
| 3.12 | ON-SITE CONTROL |
Quality Control Daily Reports may not be substituted for other written reports required under clauses of the contract, such as Disputes, Differing Site Conditions, or Changes.
| 3.3 | ENFORCEMENT |
| A. | The Contractor shall stop work on any item or feature pending satisfactory correction of any deficiency noted by the quality control staff or the Contracting Officer. |
| PART 4 | MEASUREMENT AND PAYMENT |
| PART 4 | MEASUREMENTS AND PAYMENT |
Payment will be included in the bid item to which this work relates.
END OF SECTION
CONTRACTOR'S QUALITY CONTROL DAILY REPORT
REPORT NO. _________ SHEET 1 OF _________
PROJECT
CONTRACT NO.
DATE
PARK
CONTRACTOR'S REPRESENTATIVE ON THE JOB
| WEATHER (Rain, Snow, Cloudy, Windy, etc.) |
| RAINFALL |
Inches
| TEMPERATURE |
| GROUND CONDITIONS (Dry, Damp, Wet, Frozen, etc.) |
MAX.
MIN.
1. PRIME CONTRACTOR
| NO. EMPLOYEES BY JOB CATEGORIES | |
| Hours | |
| HEAVY EQUIPMENT ON JOB | |
| NO. UNITS | |
| HRS. WORKING |
| YES |
| NO |
| Comments |
WORK PERFORMED BY PRIME CONTRACTOR:
| MATERIALS DELIVERED |
| OFFICIAL VISITORS TO SITE |
2A. SUBCONTRACTOR, _____________________________________________: (If more than one subcontractor use copies of following page.)
| NO. EMPLOYEES BY JOB CATEGORIES | |
| Hours | |
| HEAVY EQUIPMENT ON JOB | |
| NO. UNITS | |
| HRS. WORKING |
| YES |
| NO |
| Comments |
WORK PERFORMED BY SUBCONTRACTOR:
3. SPECIFIC INSPECTIONS: (Inspections performed, results, and corrective actions)
4. TESTING: 1 Check if any testing was performed today. (Complete and attach Test Report Information Sheets.)
Type and Location of Testing: ____________________________________________________________________________________
5. VERBAL INSTRUCTION RECEIVED FROM GOVERNMENT ON CONSTRUCTION DEFICIENCIES OR RE-TESTING REQUIRED:
6. REMARKS:
7. CERTIFICATION:
| I certify that the above report is complete and correct and that I, or my authorized representative, have inspected all work performed this day by the prime contractor and each subcontractor and determined that all materials, equipment, and workmanship are in strict compliance with the plans and specifications except as may be noted above. | ____________________________________________________________ |
| Contractor's Quality Control Representative |
SUBCONTRACTOR WORK CONTINUED:
| CONTRACT NO. |
| REPORT NO. _______ |
SHEET ____ OF ____
2 SUBCONTRACTOR,
| NO. EMPLOYEES BY JOB CATEGORIES | |
| Hours | |
| HEAVY EQUIPMENT ON JOB | |
| NO. UNITS | |
| HRS. WORKING |
| YES |
| NO |
| Comments |
WORK PERFORMED BY SUBCONTRACTOR:
2 SUBCONTRACTOR,
| NO. EMPLOYEES BY JOB CATEGORIES | |
| Hours | |
| HEAVY EQUIPMENT ON JOB | |
| NO. UNITS | |
| HRS. WORKING |
| YES |
| NO |
| Comments |
WORK PERFORMED BY SUBCONTRACTOR:
2 SUBCONTRACTOR,
| NO. EMPLOYEES BY JOB CATEGORIES | |
| Hours | |
| HEAVY EQUIPMENT ON JOB | |
| NO. UNITS | |
| HRS. WORKING |
| YES |
| NO |
| Comments |
WORK PERFORMED BY SUBCONTRACTOR:
2 SUBCONTRACTOR,
| NO. EMPLOYEES BY JOB CATEGORIES | |
| Hours | |
| HEAVY EQUIPMENT ON JOB | |
| NO. UNITS | |
| HRS. WORKING |
| YES |
| NO |
| COMMENTS |
WORK PERFORMED BY SUBCONTRACTOR:
DAILY TEST REPORT INFORMATION SHEET
| CONTRACT NO. REPORT NO. _____________ |
| SHEET _____ OF _________ |
| 1. Individual Making Inspection or Test: |
| 2. Testing Laboratory; Name: |
| Phone #: |
Address:
3. Description of Work and Test Method:
4. Location of Samples and Tests or Inspections:
5. Specification Section:
6. Inspection or Test Data:
7. Test Results and Interpretations of Test Results:
8. Comments or Professional Opinion About Compliance of Inspected Work or Tested Work with contract Document Requirements:
9. Recommendations:
10. Corrective Actions Taken:
CERTIFICATION:
I certify that the above testing report is complete and correct and that all testing performed this day for this contract is in strict compliance with the plans and specifications except as noted above.
Signature of Inspector
SECTION 01510
TEMPORARY SERVICES
| BIHO 146594 | 01510-21 |
| TEMPORARY SERVICES | |
| PART 1 | GENERAL |
| PART 1 | GENERAL |
| 1.1 | DESCRIPTION |
The work of this section consists of providing temporary services required for Contractor's performance of the work of this contract.
| PART 2 | PRODUCTS |
| PART 2 | PRODUCTS |
| 2.1 | GENERAL |
Temporary materials may be new or used, but must be adequate in capacity for the required usage, must not create unsafe conditions, and must not violate requirements of applicable codes and standards.
| 2.2 | FIRE PROTECTION EQUIPMENT |
| A. | Extinguisher shall have a minimum UL rating of 2-A:10-B:C. |
| PART 3 | EXECUTION |
| PART 3 | EXECUTION |
| 3.1 | FIRE PREVENTION AND PROTECTION |
Responsible Person: A capable and qualified person shall be placed in charge of fire protection. The responsibilities shall include locating and maintaining fire protective equipment.
Hazard Control: Take all necessary precautions to prevent fire during construction. Store any flammable or combustible liquids in OSHA approved containers at location approved by the Contracting Officer. Provide adequate ventilation during use of volatile or noxious substances.
Spark Arresters:
Written determinations of periods and areas of potential fire hazard will be issued by Contracting Officer.
Equip all gasoline or diesel powered equipment used during periods of potential fire hazards or in potential forest and grass fire locations with spark arresters approved by the USDA Forest Service.
Service and Refueling Areas: Locate areas a minimum of 50 feet from buildings. Shut down equipment before refueling.
Smoking: Smoking within buildings or temporary storage sheds is prohibited.
Hot work Permit: If hot work is necessary, a hot work permit is required before any hot work operation begins. The contractor shall complete and submit to the Contracting Officer NPS Hot Work Permit Form (HW-1) and ensure permit conditions are followed.
| 3.2 | PROTECTION EQUIPMENT REQUIRED |
| A. | Vehicles and Equipment: Provide one extinguisher on each vehicle or piece of equipment. |
| PART 4 | MEASUREMENT AND PAYMENT |
| PART 4 | MEASUREMENT AND PAYMENT |
| 4.1 | TEMPORARY SERVICES |
SECTION 01560
BARRIERS
| BIHO 146594 | 01560-23 |
| BARRIERS | |
| PART 1 | GENERAL |
| PART 1 | GENERAL |
| 1.1 | DESCRIPTION |
The work of this section consists of furnishing, installing, and maintaining barriers to protect existing facilities, building and its content from exposure to the elements, and the public from construction operations.
| PART 2 | PRODUCTS |
| PART 2 | PRODUCTS |
| 2.1 | GENERAL |
Material may be new or used, but shall be suitable for intended purpose. Fences and barriers shall be structurally adequate and neat in appearance.
| 2.2 | FENCING |
| A. | Safety Barrier Fence: Orange plastic fence, minimum height, 4 feet. |
| 2.3 | BARRICADES AND SIGNS |
| A. | Manual on Uniform Traffic Control Devices (MUTCD), Part VI, 1988 edition. |
| 2.4 | OPENING COVER/LUMBER |
| A. | Free of nails, large knot holes and splinters. |
| 2.5 | BARRIER TAPE |
| A. | Banner Guard, imprinted with "CAUTION: CONSTRUCTION AREA", manufactured by Reef Industries, Inc., Houston, Texas, or approved equal. |
| PART 3 | EXECUTION |
| PART 3 | EXECUTION |
| 3.1 | GENERAL |
Fence, barricade, or otherwise block off the immediate work area to prevent unauthorized entry.
Erect and maintain barricades, lights, danger signals, and warning signs in accordance with MUTCD-1988.
Illuminate barricades and obstructions at night; keep safety lights burning from sunset to sunrise.
Protect pedestrian traffic by guardrails or fences Schedule work so as to not leave any opening overnight; cover openings when inclement weather is forecasted and secure to prevent unauthorized entry; obtain COR’s approval when covered opening must be left overnight..
| 3.2 | BARRIER TAPE |
| A. | Install where directed by Contracting Officer. |
| 3.3 | REMOVAL |
| A. | Completely remove barriers no longer needed when approved by Contracting Officer. |
| PART 4 | MEASUREMENT AND PAYMENT |
| PART 4 | MEASUREMENT AND PAYMENT |
| 4.1 | BARRIERS |
SECTION 01770
PROJECT CLOSEOUT
| BIHO 146594 | 01770-25 |
| PROJECT CLOSEOUT | |
| PART 1 | GENERAL |
| PART 1 | GENERAL |
| 1.1 | DESCRIPTION |
The work of this section consists of final cleanup, closeout submittals, and final inspection procedures.
| PART 2 | PRODUCTS |
| PART 2 | PRODUCTS |
| 2.1 | CLEANING MATERIALS |
As recommended by the manufacturer of surface to be cleaned.
| PART 3 | EXECUTION |
| PART 3 | EXECUTION |
| 3.1 | CLEANING |
| A. | Before scheduling the final inspection, remove all tools, equipment, surplus materials, and rubbish. Restore or refinish surfaces that are damaged due to work of this contract to original condition. Thoroughly clean building interiors. Pick up all construction debris from the site. |
| 3.2 | CLOSEOUT SUBMITTALS |
| A. | Submit before final inspection request. |
Guarantees and Bonds: As specified in individual sections.
| 3.3 | SUBSTANTIAL COMPLETION AND FINAL INSPECTION |
| A. | When project, or designated portion of project, is substantially complete, request in writing a final inspection. Upon receipt of written request that project is substantially complete, the Contracting Officer will proceed with inspection within 10 days of receipt of request or will advise the Contractor of items that prevent the project from being designated as substantially complete. |
| B. | If, following final inspection, the work is determined to be substantially complete, Contracting Officer will prepare a list of deficiencies to be corrected before final acceptance and issue a Letter of Substantial Completion. Contractor shall complete the work described on the list of deficiencies within 15 calendar days, as weather permits. If the Contractor fails to complete the work within this time frame, the Contracting Officer may either replace or correct the work with an appropriate reduction in the contract price or charge for reinspection costs in accordance with the Inspection of Construction clause of the contract.. |
| C. | If, following final inspection, the work is not determined to be substantially completed, Contracting Officer will notify Contractor in writing. After completing work, Contractor shall request a new final inspection. All reinspection costs may be charged against the Contractor in accordance with the Inspection of Construction clause of the contract. |
| 3.4 | FINAL ACCEPTANCE OF THE WORK |
| A. | After all deficiencies have been corrected, a Letter of Final Acceptance will be issued. |
| PART 4 | MEASUREMENT AND PAYMENT |
| PART 4 | MEASUREMENT AND PAYMENT |
Copyright 2004 by The American Institute of Architects (AIA) Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA
SECTION 085200
WOOD WINDOWS
This Section uses the term "Architect." Change this term to match that used to identify the design professional as defined in the General and Supplementary Conditions.
Verify that Section titles referenced in this Section are correct for this Project's Specifications; Section titles may have changed.
GENERAL
SUMMARY
This Section includes operable wood-framed windows of the following type:
Adjust list below to suit Project.
Aluminum clad.
DEFINITIONS
Retain abbreviations, definitions, and terms that remain after this Section has been edited.
Performance grade number according to AAMA/WDMA 101/I.S.2/NAFS:
Design pressure number in pounds force per square foot used to determine the structural test pressure and water test pressure.
Structural Test Pressure: For uniform load structural test, is equivalent to 150 percent of the design pressure.
Minimum Test Size: Smallest size permitted for performance class (gateway test size). Products must be tested at minimum test size or at a size larger than minimum test size to comply with requirements for performance class.
PERFORMANCE REQUIREMENTS
Performance class designations according to AAMA/WDMA 101/I.S.2/NAFS is Residential (R).
General: Provide wood windows capable of complying with performance requirements indicated, based on testing manufacturer's windows that are representative of those specified, and that are of test size as indicated in Summary of Work.
Retain paragraph and subparagraphs below if Architect has either delegated design responsibility to Contractor or wants to review structural data as another way to verify windows' compliance with performance requirements or performance designation.
Structural Performance: Provide wood windows capable of withstanding the effects of the following loads based on testing units representative of those indicated that pass AAMA/WDMA 101/I.S.2/NAFS, Uniform Load Structural Test:
Model building codes require windows and other fenestration to be designed and installed, according to ASCE 7, to withstand wind pressure loads for components and cladding. Revise subparagraph below if loads are developed from wind-tunnel tests. Building heights and window locations should be shown on Drawings.
Design Wind Loads: Determine design wind loads applicable to the Project site from basic wind speed indicated in miles per hour at 33 feet above grade, according to ASCE 7, Section 6.5, "Method 2-Analytical Procedure," based on mean roof heights above grade.
Delete four subparagraphs below if information is indicated on Drawings. Other factors that adjust for building height, shape, and other characteristics such as topographic factor, gust effect factor, and enclosure classifications may need to be included. This information should enable contractors to require window manufacturers to determine positive and negative design wind pressure loads.
AAMA/WDMA 101/I.S.2/NAFS makes an exception to requirement in ASTM E 1300 and in GANA's "Glazing Manual" for R, LC, and C class windows that frame systems be sufficiently stiff to limit lateral deflections of glass edges to less than 1/175 of their length. Only AW and HC class windows must pass the Uniform Load Deflection Test. Retaining subparagraph below for windows other than AW and HC classes may require manufacturers to provide a custom window unless calculations or test data recorded during the Uniform Load Structural Test indicate that frame deflections comply with the 1/175 limitation.
Deflection: Design glass framing system to limit lateral deflections of glass edges to less than 1/175 of glass-edge length or 3/4 inch, whichever is less, at design pressure based on testing performed according to AAMA/WDMA 101/I.S.2/NAFS, Uniform Load Deflection Test or structural computations.
Model building codes and ASCE 7 establish criteria for buildings in hurricane-prone locations. Authorities having jurisdiction may accept other test methods and protocols. Verify requirements of authorities having jurisdiction.
SUBMITTALS
Product Data: Include National Fenestration Rating Council certification, construction details, material descriptions, fabrication methods, dimensions of individual components and profiles, hardware, finishes, and operating instructions for each type of wood window indicated.
Shop Drawings: Include plans, elevations, sections, details, hardware, attachments to other work, operational clearances, installation details, and the following:
Retain applicable subparagraphs below; delete others.
Mullion details, including reinforcement and stiffeners.
Joinery details.
Expansion provisions.
Flashing and drainage details.
Weather-stripping details.
Thermal-break details.
Glazing details.
Window cleaning provisions.
Retain first subparagraph below if windows are required to withstand specific design loads and Architect either has delegated design responsibility to Contractor or wants to review structural data as another way to verify windows' compliance with performance requirements or performance designation.
For installed products indicated to comply with design loads, include structural analysis data prepared by or under the supervision of a qualified professional engineer detailing fabrication and assembly of wood windows and used to determine the following:
Structural test pressures and design pressures from basic wind speeds indicated.
Deflection limitations of glass framing systems.
Samples for Initial Selection: For units with factory-applied color finishes.
Include similar Samples of hardware and accessories involving color selection.
Delete paragraph and subparagraph above if colors are preselected and specified or scheduled. Retain first paragraph and subparagraphs below with or without above.
Samples for Verification: For wood windows and components required, prepared on Samples of size indicated below.
Adjust list below to suit Project. For small projects, consider deleting first subparagraph if exact match of finish color is not important.
Main Framing Member: 12-inch- long, full-size sections of window frame with factory-applied color finish.
Window Corner Fabrication: 12--by-12-inch- long, full-size window corner including full-size sections of window frame with factory-applied color finish, weather stripping, and glazing.
Operable Window: Full-size unit with factory-applied finish.
Hardware: Full-size units with factory-applied finish.
Weather Stripping: 12-inch- long sections.
Product Schedule: For wood windows. Use same designations indicated on Drawings.
Coordinate paragraph below with qualification requirements in Division 1 Section "Quality Requirements" and as supplemented in "Quality Assurance" Article.
Qualification Data: For Installer, manufacturer, professional engineer and testing agency.
Retain option in first paragraph below if manufacturers verify and their product literature indicates that wood windows were tested according to AAMA/WDMA procedures.
Product Test Reports: Based on evaluation of comprehensive tests performed within the last four years by a qualified testing agency for each type, class, grade, and size of wood window. Test results based on use of downsized test units will not be accepted.
Maintenance Data: For operable window sash, operating hardware, weather stripping and finishes to include in maintenance manuals.
Warranty: Special warranty specified in this Section.
QUALITY ASSURANCE
Installer Qualifications: An installer having a minimum of five years of experience working the proposed window system on projects of similar size, climate conditions, building type, etc. as this project.
Delete subparagraphs below if Contractor is not required to assume responsibility for engineering.
Manufacturer Qualifications: A manufacturer capable of fabricating wood windows that meet or exceed performance requirements indicated and of documenting this performance by inclusion in lists and by labels, test reports, and calculations.
Source Limitations: Obtain wood windows through one source from a single manufacturer.
Product Options: Information on Drawings and in Specifications establishes requirements for wood windows' aesthetic effects and performance characteristics. Aesthetic effects are indicated by dimensions, arrangements, alignment, and profiles of components and assemblies as they relate to sightlines, to one another, and to adjoining construction. Performance characteristics are indicated by criteria subject to verification by one or more methods including preconstruction testing, field testing, and in-service performance.
Retain paragraph above or first paragraph below. Retain below to allow drawing details based on one manufacturer's product to establish requirements and still allow competition. Coordinate with Division 1 requirements.
Retain subparagraph below with either "Product Options" Paragraph above or revise to suit Project.
Do not modify intended aesthetic effects without prior written approval by the Contracting Officer. If modifications are proposed, submit comprehensive explanatory data to Contracting Officer for review.
Fenestration Standard: Comply with or exceed AAMA/WDMA 101/I.S.2/NAFS, "North American Fenestration Standard Voluntary Performance Specification for Windows, Skylights and Glass Doors," for definitions and minimum standards of performance, materials, components, accessories, and fabrication unless more stringent requirements are indicated.
Retain requirements for AAMA or WDMA certification and labeling if required. Not all manufacturers that test products to demonstrate compliance with AAMA/WDMA testing and performance requirements participate in AAMA's or WDMA's third-party certification program for listing and labeling wood windows.
Provide AAMA-certified wood windows with an attached label.
Glazing Publications: Comply with published recommendations of glass manufacturers and with GANA's "Glazing Manual".
Delete paragraph and subparagraph below if not required. If retaining, indicate location, size, and other details of mockups on Drawings or by inserts. Revise wording if only one mockup is required.
Delete paragraph below if Work of this Section is not extensive or complex enough to justify a preinstallation conference. If retaining, coordinate with Division 1.
Retain paragraph above if requirements in Division 1 are adequate for Project. Retain paragraph below if additional requirements are necessary; include information about conference. Identify specific participants not mentioned in Division 1.
Preinstallation Conference: Conduct conference at Project site to review methods and procedures related to wood windows including, but not limited to, the following:
Delete subparagraphs below if not required. If retaining, revise to include product-specific requirements. Insert additional requirements to suit Project.
Review and finalize construction schedule and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.
Review, discuss, and coordinate the interrelationship of wood windows with other exterior wall components. Include provisions for structural anchorage, glazing, flashing, weeping, sealants, and protection of finishes.
Review and discuss the sequence of work required to ensure watertight and weathertight seams to the building envelope.
Inspect and discuss the condition of substrate and other preparatory work performed by other trades.
Insert below agenda items not listed in Division 1 Section "Project Management and Coordination."
PROJECT CONDITIONS
Retain this Article unless it does not apply to normal sequence of work. These provisions are also not applicable if stock wood window sizes are used.
Field Measurements: Verify window openings by field measurements before fabrication and indicate measurements on Shop Drawings.
Delete subparagraph below if not allowed.
WARRANTY
When warranties are required, verify with Owner's counsel that special warranties stated in this Article are not less than remedies available to Owner under prevailing local laws. Coordinate with Division 1 Section "Product Requirements."
Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace wood windows that fail in materials or workmanship within specified warranty period.
Failures include, but are not limited to, the following:
Failure to meet performance requirements.
Structural failures including excessive deflection, water leakage, air infiltration, or condensation.
Faulty operation of movable sash and hardware.
Deterioration of wood, metals, vinyl, other materials, and finishes beyond normal weathering.
Failure of insulating glass.
Warranty Period:
Verify available warranties for units and components and retain or insert numbers in subparagraphs below.
Wood Members: Ten years from date of Substantial Completion.
Some manufacturers offer a 10-year warranty on insulating glass but may insist that warranty begins on date of manufacture.
Insulating Glazing: 20 years from date of Substantial Completion.
Warranty period for metal finish depends on type of finish. Revise subparagraph below if finish warranties are available for wood or vinyl cladding.
Exterior Aluminum Kynar Finish: Twenty years from date of Substantial Completion.
Other components: Ten years from date of Substantial Completion.
PRODUCTS
MANUFACTURERS
See Editing Instruction No. 1 in the Evaluations in Division 8 Section "Windows" for cautions about naming manufacturers and products. Retain one of three paragraphs and lists of manufacturers in this Article. See Division 1 Section "Product Requirements."
Basis-of-Design Product: Subject to compliance with requirements, provide Pella Corporation Pella® Architect Series or comparable product by one of the following:
Retain manufacturers in lists below after verifying availability and suitability of products for applications indicated. Insert other manufacturers if required.
Aluminum-Clad Wood Windows:
EAGLE Window & Door, Inc.; an Andersen Window & Door company.
Marvin Windows and Doors.
Pella Windows and Doors.
Kolbe & Kolbe Millwork Co., Inc.
Source Limitations: Obtain wood windows from single source from single manufacturer.
MATERIALS
Delete this Article if materials specified in AAMA/WDMA 101/I.S.2/NAFS are acceptable and if finish and color are indicated by manufacturer's product designation or by another means. If control over some material, finish, or color is required, retain or edit applicable paragraphs and subparagraphs below.
Revise paragraph below to prohibit use of finger joints where interior wood is natural finished.
Wood: Clear ponderosa pine or another suitable fine-grained lumber; kiln dried to a moisture content of 6 to 12 percent at time of fabrication; free of visible finger joints, blue stain, knots, pitch pockets, and surface checks larger than 1/32 inch deep by 2 inches wide; water-repellent preservative treated.
Retain paragraph and subparagraphs below only for aluminum-clad wood windows.
Aluminum Extrusions and Rolled Aluminum for Cladding: Manufacturer's standard formed sheet or extruded-aluminum cladding, mechanically bonded to exterior exposed wood members. Provide aluminum alloy and temper recommended by wood window manufacturer for strength, corrosion resistance, and application of required finish, but not less than 22,000-psi ultimate tensile strength, and not less than 16,000-psi minimum yield strength.
General: Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes.
Finish designations prefixed by AA comply with the system established by the Aluminum Association for designating aluminum finishes.
Retain subparagraph below for standard finish offered by manufacturers for extrusions and sheet. Type of baked finish varies among manufacturers. Delete if another finish is retained.
Baked-Enamel Finish for Extrusions and Sheet: Manufacturer's standard baked enamel complying with AAMA 2603 and paint manufacturer's written specifications for cleaning, conversion coating, and painting.
Retain one color in subparagraph below or insert manufacturer's proprietary color name. All manufacturers offer white and either bronze or brown.
Color: As selected by Contracting Officer from manufacturer's full range.
Retain subparagraph below for premium finish offered by some manufacturers for extrusions and sheet. Delete if another finish is retained.
Retain subparagraph below for standard finish offered by manufacturers for coil for rolled aluminum cladding. Type of baked finish varies among manufacturers. Delete if another finish is retained.
Wood Trim and Glazing Stops: Material and finish to match frame members.
Retain paragraph above or first paragraph below to suit product. Revise below to suit Project.
Clad Trim and Glazing Stops: Clad-wood material and finish to match clad frame members.
Fasteners: Aluminum, nonmagnetic stainless steel, epoxy adhesive, or other materials warranted by manufacturer to be noncorrosive and compatible with wood window members, cladding, trim, hardware, anchors, and other components.
Generally retain subparagraph below. Revise if exposed fasteners are permitted.
Exposed Fasteners: Unless unavoidable for applying hardware, do not use exposed fasteners. For application of hardware, use fasteners that match finish of member or hardware being fastened, as appropriate.
First paragraph below is adequate for most projects; structural calculations may be required on major projects.
Anchors, Clips, and Accessories: Aluminum, nonmagnetic stainless steel, or zinc-coated steel or iron complying with ASTM B 633 for SC 3 severe service conditions; provide sufficient strength to withstand design pressure indicated.
Reinforcing Members: Aluminum, or nonmagnetic stainless steel, or nickel/chrome-plated steel complying with ASTM B 456 for Type SC 3 severe service conditions, or zinc-coated steel or iron complying with ASTM B 633 for SC 3 severe service conditions; provide sufficient strength to withstand design pressure indicated.
Delete first two paragraphs and associated subparagraphs below if wood windows are not weather stripped. Otherwise, select appropriate method.
Compression-Type Weather Stripping: Provide compressible weather stripping designed for permanently resilient sealing under bumper or wiper action and for complete concealment when wood window is closed.
Retain one of three subparagraphs below.
Weather-Stripping Material: Manufacturer's standard system and materials complying with AAMA/WDMA 101/I.S.2/NAFS.
Sliding-type weather stripping is primarily for double-hung or horizontal-sliding windows. Delete first paragraph below if these types of units are not included or if full weather stripping is not desired..
Replaceable Weather Seals: Comply with AAMA 701/702.
Insert requirements for nail fins; mullion covers; trim pieces such as brick molds, J-channels, and drywall returns; and head, jamb, and sill extenders available from some manufacturers.
WINDOW
Copy this Article for each type of window required and re-edit to suit product and Project. Paragraph below may not be needed if window type is indicated by a basis-of-design product name or designation.
Window Types: Casement, double hung and sliding.
Retain option in paragraph below if requirements exceed minimums set by AAMA/WDMA 101/I.S.2/NAFS.
AAMA/WDMA Performance Requirements: Provide wood windows of performance indicated that comply with AAMA/WDMA 101/I.S.2/NAFS. Ensure high altitude glass is provided where dimension meet manufacturer’s requirements.
Retain one of six subparagraphs below if AAMA/WDMA 101/I.S.2/NAFS performance designation is the method selected for specifying windows and AAMA/WDMA minimum gateway performance or optional performance is acceptable. Use this method by indicating AAMA/WDMA performance class and performance grade that suit most stringent structural, air-infiltration, and water-resistance performance requirements needed for Project, based on the largest window size for Project. First grade value with each performance class is for minimum gateway performance. Optional performance grades are examples only. If more than one class or grade is required, indicate performance classes and grades on Drawings or in a window schedule. Verify availability of class and grade specified with manufacturers selected.
This method makes architects responsible for determining, by themselves or with advice of a qualified professional engineer, not only the basic wind speed applicable to Project but also the specific positive and…