B09_Amendment_to_Solicitation_140P8318@0123.docx
DOCX document 18 KB Posted
- Attached to
- BIHO - REPLACE WINDOWS UNIT #5 Federal contract opportunity
- Solicitation number
- 140P8318Q0123
About this file
Answers to Previously Asked Questions Amendment
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B09_Amendment_WINDOW_SCHEDULE.docx | DOCX document | |
| 5c.zip | ZIP file | |
| B09_SF-30_Amendment_140P8318Q0123.pdf | ||
| 5d.zip | ZIP file | |
| 5a.zip | ZIP file | |
| Sol_140P8318Q0123_Amd_0001.pdf | ||
| 5b.zip | ZIP file | |
| B09_Amendment_Drawings_Windows_BIHO_341_3009C_emp_apartment.pdf | ||
| B09_SOW_Amendment_BIHO_146594_Spec_04042017.docx | DOCX document | |
| B08_SF-25A_PAYMENT_BOND_FORM.pdf | ||
| B08_Section_B_Price_Schedule.docx | DOCX document | |
| B08_SF-1442_RFQ_140P8318Q0123.pdf | ||
| Sol_140P8318Q0123.pdf | ||
| B08_Section_C-M_Terms_and_Conditions_9-12-2018.docx | DOCX document | |
| B08_Attachment_1_READ_ME_FIRST.docx | DOCX document | |
| B08_Wage_Detrmination_MT180026_Beaverhead_County,Montana.pdf | ||
| B08_SOW_Replace_Windows.doc | DOC document | |
| B08_Experience_and_Past_Performance.docx | DOCX document | |
| B08_NPS_CM-16_Transmittal_Form_Use_for_Contract_Submittals.docx | DOCX document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Answers to previously asked questions 1). What are the exact size of the windows? The price varies greatly from windows sizes 13 sf to 24 sf sometimes thousands of dollars. Also the brand of window is going to effect the price greatly. Anderson has a 400 series that matches the description in the solicitation and they are premier windows.
A: please see the drawings and window schedule. If need more detail information, it'll be best to visit the site and obtain needed info.
2). What type of siding are we effecting? Brick? Cedar? Pine? Press Board? and is the siding still available, if for one reason or another it is damaged during repairs can we get the new siding to match?
A: please see the drawings. Any damage will be need to be repaired to match existing conditions.
3). Is there interior work that is included in this solicitation? or will there be another solicitation for the interior work that will need to be done.
I.E. Trim replacement, Staining or Painting the wood interior of the windows and trim, and painting of the drywall on the interior if needed.
A: There is no interior nor exterior work. Any damage will be need to be repaired to match existing conditions. See specifications.
4). How much framing are you anticipating? These windows can usually be ordered in custom sizes and if there is a way to not mess with the structure of the building it would be better to leave it alone. I understand that they may need to be brought to code, but there is a large cost in moving framing of an exterior wall.
A: We do not anticipate any changes in sizes.
5). Is the framing wood or metal?
A: please see the drawings and technical specifications
6). Are there any basement windows that will need to be brought to e-grass? if so how many and what size are they so we can better gauge the size of window well that will need to bring that to code.
A: There is no basement.
File details come from the government source that posted it.