Sol_140P8126Q0035_Amd_0001.pdf

PDF 687 KB Posted

Attached to
REPAIR OF JOTR HEADQUARTERS FIRE MAIN
Solicitation number
140P8126Q0035
Issued by

About this file

This is Amendment 0001 to federal solicitation 140P8126Q0035, issued by the National Park Service (NPS) at Lake Mabo in Boulder City, Nevada. The amendment is effective June 16, 2026, with an offer receipt deadline of June 29, 2026. The solicitation is not extended.

The amendment addresses 15 contractor questions and provides clarifications on project execution. Key logistical details include: no permitting is required; contractors may use the east area of the dirt parking lot south of the construction site as a laydown area and material storage; water is available on-site at no cost from a water point located adjacent to the laydown area; the construction area may be closed off during work; and metal plates are not required over the construction site due to required fencing. Regarding technical specifications, contractors may use PE 4710 pipe in lieu of the referenced PE 3408, provided standards are equivalent; long-radius 90-degree fittings are acceptable; butt-welded connections with compression sleeves are acceptable for thermal fusion work; and shut-off valve replacements should match the existing size with a 2-inch operating nut. The contractor is responsible for compaction testing. Coordination for leak testing before backfill must occur with the Twentynine Palms Water District. The amendment updates the wage determination to CA20260026 effective July 14, 2026. A site visit was conducted on July 8, 2026, at 74485 National Park Drive, Twentynine Palms, California, with four participants representing JTR, LGloune Inc., DEVCO, and DEVCO noted in attendance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

Caroline Bachelier

See continuation page

NPS, PWR - LAKE MABO

601 Nevada Way Boulder City NV 89005-2426

PPL

140P8126Q0035

06/16/2026

06/29/2026

1 5

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140P8126Q0035/0001

See Continuation Page

Amendment 0001

The purpose of this amendment is to answer contractor questions, update the wage determination and publish the site visit attendance.

1. Answer Contractor Question:

Q1: Is permitting required?

A1: No

Q2: Where can the contractors use as a lay down area?

A2: The east area of the dirt parking area south of the construction site can be used.

Q3: Water point location?

A3: Water is available in the dirt parking area south of the construction site.

Q4: Where can contractors store material that is removed from the trench while the pipe is being installed?

A4: In the east area of the dirt parking lot south of the construction site.

Q5: Can the construction area be closed off during work?

A5: Yes

Q6: Are metal plates required over the construction site?

A6: No due to fencing being required around the open construction site.

Q7: Is it possible to (1) Relocate the new line to the dirt area to the far side of the parking lot, away from the building. (2) Relocate between the building and the parking lot. (3) Relocate behind the main building area? Any of these alternative routes would avoid damaging the parking areas. It will add to material and trenching costs for the area (2 and

3) behind and across the parking area, in the dirt farthest from the building, but nothing close to the cost of demo and replacement with asphalt, and it will also cause aesthetic damage to the parking area right in front of the building.

A7: There is no redirecting allowed due to the sensitive nature of the location of our HQ. It is in a very sensitive arch site, and we cannot deviate from the current layout of where the pipe lays. Additionally, the line already has a previous sawcut and patch through throughout the length of the existing pipe in the parking area, so we are not worried about aesthetics as once the entire length of line is replaced over the next few years we are going to repave the parking area.

Q8: Is construction water available on site at no cost to the project?

Amendment 0001

A8: Yes, the park has a water point where water can be obtained. It is located next to the lay down area.

Q9: For the shut-off valve replacement, should the vendor assume a standard flanged bury valve with 2-inch operating nut? The vendor noted the existing HDPE appears flanged and they would plan to flange to it.

A9: Replace with same size valve with 2 inch nut ensuring it is mated to existing HDPE on the east side and new HDPE on project side. Flange is acceptable.

Q10: Should the 90-degree fitting be assumed as a long-radius 90?

A10: A long radius 90 is acceptable.

Q11: The SOW references PE 3408, but the vendor noted PE 3408 has been superseded by PE 4710. Is PE 4710 acceptable if it otherwise meets the required standards?

A11: This is fine as long is it meets the same standards.

Q12: For thermal fusion, the vendor plans to butt-weld the new HDPE pipe and use a compression sleeve connection on the existing side. Is this acceptable?

A12: This is acceptable.

Q13: Who is responsible for compaction testing: the contractor or the Government?

A13: Contractor is responsible for compaction testing

Q14: Is a local jurisdictional permit or inspection required, or should the vendor assume no local permit/inspection?

A14: No permit is required for this job. Coordination for doing leak testing before backfill will have to be with the local water district (Twentynine Palms Water District) as they control the valve to our property.

Q15: Is there a designated laydown area behind the work area?

A15: Laydown area is located in the dirt parking area to the south of the project site.

2. Update that wage determination to CA20260026 07/14/2026.

3. Attached is the site visit attendance sign in.

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)
Continuation sheet
Reference Number
Name of Offeror or Contractor
OPTIONAL FORM 336 (4-86))

Sponsored by GSA FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .