Sol_140P8126Q0021_Amd_0002.pdf

PDF 223 KB Posted

Attached to
UPGRADE SECURITY & INTRUSION SYSTEMS at Joshua Tre Federal contract opportunity
Solicitation number
140P8126Q0021
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

This is Amendment #2 to solicitation 140P8126Q0021 for JOTR Security Intrusion System Upgrades, issued May 13, 2026, with an effective date of May 13, 2026. The amendment addresses 14 vendor questions and clarifications regarding the intrusion detection system (IDS) installation project at Lake Mabo (NPS, PWR). No additional time extension was granted for proposal submission.

Key project specifications clarified in this amendment include: ceiling configurations vary by building (administration building has drop ceiling, Buildings 100 and Black Rock Visitor Center have open ceilings, remaining buildings have crawlspaces); 150 user codes will be required; no partitions, outdoor hardware, remote management, or app functionality is needed; the systems require cellular service capability (with Verizon being the most prevalent service in the area, though no preference was stated); fire alarm panels must be upgraded to use cellular service and monitored by the same company as the security system; existing functional wiring and intrusion devices may be reused with new equipment; one year of warranty is required with no optional service years; current door contacts include both surface-mounted and recessed types across all buildings; and all replaced equipment should be disposed of rather than retained. The period of performance runs from July 1, 2026 through June 30, 2027. The contracting activity is PPL with contractor NPS, PWR – Lake Mabo located at 601 Nevada Way, Boulder City, NV 89005-2426.

View the file

Other files for this federal contract opportunity

Other files attached to UPGRADE SECURITY & INTRUSION SYSTEMS at Joshua Tre, newest first.
File Type Posted
Sol_140P8126Q0021_Amd_0001.pdf PDF
Sol_140P8126Q0021.pdf PDF
B08_ATTACHMENT_B_SCA_Wage_Rates.pdf PDF
B08_ATTACHMENT_A_Scope_of_Work.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

Bradley Metler

See continuation page

NPS, PWR - LAKE MABO

601 Nevada Way Boulder City NV 89005-2426

PPL

140P8126Q0021

05/13/2026

04/22/2026

1 5

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140P8126Q0021/0002

Amendment #2 Answers Vendor questions. No additional extension to the closing is issued.

Thank you.

Period of Performance: 07/01/2026 to

06/30/2027

140P8126Q0021 JOTR SECUIRTY INTRUSION

SYSTEM UPGRADES

AMENDMENT #2 5-13-26

Amendment #2 addresses vendor questions. Answers are in ORANGE, below.

Q1. Are the ceilings drywall, drop, or open in each building?

A1: The administration building has a drop ceiling, 100 and the Black Rock Visitor center are open ceilings, The rest of the buildings have ceilings with crawlspaces.

Q2. One keypad per location?

A2: Please refer to the SOW where the number of keypads for each building is listed..

Q3. Any outdoor hardware?

A3: No outdoor hardware

Q4. How many user codes will be required?

A4: 150

Q5. Any partitions needed? For example in building one, Lisa has access to one part of the building but not another? If so, how many?

A5: There are no partitions needed

Q6. Will you need an app or remote management?

A6: No remote management is needed, just the ability to be monitored by a monitoring company.

Q7. Is the area currently open to the public? If not, can there be another sight walk available?

A7: The buildings are not open to the public. There will not be another site visit available.

Q8. Is the customer wanting Cell Cards to be the main/only form of communication for the new IDS Panels?

A8: Yes, all systems need to work with cellular service.

AMENDMENT #2 5-13-26

Q9. The SOW states that the new IDS panels need to be compatible with the existing Fire Alarm Systems, how do they need to be compatible and is there a form of integration wanted by the customer? If so, what is that integration?

A9: The fire panels need to be upgraded to use cellular service. The new security systems that will be installed with cellular devices must all be able to be monitored by the same company. IE one company should be able to monitor the security system and the fire system.

Q10. To clarify, the contractor is allowed to use the existing wire if functional and acceptable?

A10: Any wiring or intrusion devices that still work with newly installed equipment is able to be reused.

Q11. It is mentioned that one year of warranty is needed; were there optional years of service/preventative maintenance wanted as well?

A11: No option years of service will be part of this contract.

Q12. Are the current door contacts a the buildings recessed or surface mount?

A12: There are surface and recessed door contacts used across all buildings.

Q13. For the current wireless devices being removed, does the customer want to keep the new equipment being installed wireless or changed to hardwired?

A13: Nothing that is replaced needs to be retained. It can all be disposed of.

Q14. Which cell service is preferred for this area, AT&T or Verizon?

A14: Verizon is the most prevalent cell service but the park does not have a preference.

AMENDMENT #2 5-13-26

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)
Continuation sheet
Reference Number
Name of Offeror or Contractor
OPTIONAL FORM 336 (4-86))

Sponsored by GSA FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .